Drawbridge Operation Regulation; Pearl River, LA/MS, 34315 [2015-14715]
Download as PDF
Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Rules and Regulations
(i) For disclosures with respect to
participants and beneficiaries who
enroll or re-enroll through an open
enrollment period (including reenrollees and late enrollees), this
section applies beginning on the first
day of the first open enrollment period
that begins on or after September 1,
2015; and
(ii) For disclosures with respect to
participants and beneficiaries who
enroll in coverage other than through an
open enrollment period (including
individuals who are newly eligible for
coverage and special enrollees), this
section applies beginning on the first
day of the first plan year that begins on
or after September 1, 2015.
(2) For disclosures with respect to
plans, this section is applicable to
health insurance issuers beginning
September 1, 2015.
(3) For disclosures with respect
individuals and covered dependents in
the individual market, this section is
applicable to health insurance issuers
beginning with respect to SBCs issued
for coverage that begins on or after
January 1, 2016.
[FR Doc. 2015–14559 Filed 6–12–15; 4:15 pm]
BILLING CODE 4120–01; 4150–28–4830–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0479]
Drawbridge Operation Regulation;
Pearl River, LA/MS
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the US 90 highway bridge (East Pearl
River Bridge), a swing span bridge
across the Pearl River, mile 8.8 between
Slidell, St. Tammany Parish, Louisiana
and Pearlington, Hancock County,
Mississippi. The deviation is necessary
in order to conduct electrical and
structural repairs to the bridge. This
deviation will allow the bridge to
remain in the closed-to-navigation
position for four consecutive days.
DATES: This deviation is effective from
7 a.m. on Monday, July 20, 2015,
through 7 p.m. on Friday, July 24, 2015.
ADDRESSES: Documents mentioned in
this preamble are part of docket [USCG–
2015–0479]. To view documents
asabaliauskas on DSK5VPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
16:14 Jun 15, 2015
Jkt 235001
mentioned in this preamble as being
available in the docket, go to https://
www.regulations.gov, type the docket
number (USCG–2015–0479) in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this rulemaking. You
may also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Wetherington, Bridge Administration
Branch, Coast Guard; telephone 504–
671–2128, email d8dpball@uscg.mil. If
you have questions on viewing the
docket, call Cheryl Collins, Program
Manager, Docket Operations, telephone
202–366–9826.
SUPPLEMENTARY INFORMATION: Boh Bros.
Construction Company, on behalf of the
Louisiana Department of Transportation
and Development, requested a
temporary deviation from the operating
schedule on the US 90 highway bridge
(East Pearl River Bridge), a swing span
bridge across the Pearl River, mile 8.8
between Slidell, St. Tammany Parish,
Louisiana and Pearlington, Hancock
County, Mississippi. The bridge has a
vertical clearance of 10 feet above mean
high water in the closed-to-navigation
position and unlimited clearance in the
open-to-navigation position.
Navigation at the site of the bridge
consists mainly of small tows with
barges, some commercial sightseeing
boats, and some recreational pleasure
craft. Based on prior experience, as well
as coordination with waterway users, it
has been determined that this closure
will not have a significant effect on
these vessels. No alternate routes are
available.
In accordance with 33 CFR
117.486(b), the draw of the US 90
highway bridge shall open on signal;
except that, from 7 p.m. to 7 a.m. the
draw shall open on signal if at least four
hours notice is given. Vessels that do
not require an opening will be allowed
to pass at the slowest safe speed. The
bridge will be unable to open in the
event of an emergency.
The closure is necessary for the
replacement of structural and electrical
components of the draw span and two
submarine cables. These operations will
continue until completed and will not
allow the normal operation of the
bridge. Normal operations of the bridge
will commence upon completion of the
PO 00000
Frm 00077
Fmt 4700
Sfmt 4700
34315
work. Notices will be published in the
Eighth Coast Guard District Local Notice
to Mariners and will be broadcast via
the Coast Guard Broadcast Notice to
Mariners System.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 11, 2015.
David M. Frank,
Bridge Administrator, Eighth Coast Guard
District.
[FR Doc. 2015–14715 Filed 6–15–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0534]
Drawbridge Operation Regulation;
Bayou Sara, Near Saraland, Mobile
County, AL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the CSX Railway
Company swing span bridge across
Bayou Sara, mile 0.1, near Saraland,
Mobile County, Alabama. The deviation
is necessary to complete scheduled core
borings behind the fender system of the
bridge. This deviation will allow the
bridge to remain in the closed-tonavigation position for 24 consecutive
hours.
SUMMARY:
This deviation is effective from
6 a.m. on June 29, 2015 until 6 a.m. on
June 30, 2015.
ADDRESSES: Documents mentioned in
this preamble are part of docket [USCG–
2015–0534]. To view documents
mentioned in this preamble as being
available in the docket, go to https://
www.regulations.gov, type the docket
number (USCG–2015–0534) in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this rulemaking. You
may also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
DATES:
E:\FR\FM\16JNR1.SGM
16JNR1
Agencies
[Federal Register Volume 80, Number 115 (Tuesday, June 16, 2015)]
[Rules and Regulations]
[Page 34315]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14715]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-0479]
Drawbridge Operation Regulation; Pearl River, LA/MS
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the operation of the US 90 highway
bridge (East Pearl River Bridge), a swing span bridge across the Pearl
River, mile 8.8 between Slidell, St. Tammany Parish, Louisiana and
Pearlington, Hancock County, Mississippi. The deviation is necessary in
order to conduct electrical and structural repairs to the bridge. This
deviation will allow the bridge to remain in the closed-to-navigation
position for four consecutive days.
DATES: This deviation is effective from 7 a.m. on Monday, July 20,
2015, through 7 p.m. on Friday, July 24, 2015.
ADDRESSES: Documents mentioned in this preamble are part of docket
[USCG-2015-0479]. To view documents mentioned in this preamble as being
available in the docket, go to https://www.regulations.gov, type the
docket number (USCG-2015-0479) in the ``SEARCH'' box and click
``SEARCH.'' Click on Open Docket Folder on the line associated with
this rulemaking. You may also visit the Docket Management Facility in
Room W12-140 on the ground floor of the Department of Transportation
West Building, 1200 New Jersey Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Wetherington, Bridge
Administration Branch, Coast Guard; telephone 504-671-2128, email
d8dpball@uscg.mil. If you have questions on viewing the docket, call
Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-
9826.
SUPPLEMENTARY INFORMATION: Boh Bros. Construction Company, on behalf of
the Louisiana Department of Transportation and Development, requested a
temporary deviation from the operating schedule on the US 90 highway
bridge (East Pearl River Bridge), a swing span bridge across the Pearl
River, mile 8.8 between Slidell, St. Tammany Parish, Louisiana and
Pearlington, Hancock County, Mississippi. The bridge has a vertical
clearance of 10 feet above mean high water in the closed-to-navigation
position and unlimited clearance in the open-to-navigation position.
Navigation at the site of the bridge consists mainly of small tows
with barges, some commercial sightseeing boats, and some recreational
pleasure craft. Based on prior experience, as well as coordination with
waterway users, it has been determined that this closure will not have
a significant effect on these vessels. No alternate routes are
available.
In accordance with 33 CFR 117.486(b), the draw of the US 90 highway
bridge shall open on signal; except that, from 7 p.m. to 7 a.m. the
draw shall open on signal if at least four hours notice is given.
Vessels that do not require an opening will be allowed to pass at the
slowest safe speed. The bridge will be unable to open in the event of
an emergency.
The closure is necessary for the replacement of structural and
electrical components of the draw span and two submarine cables. These
operations will continue until completed and will not allow the normal
operation of the bridge. Normal operations of the bridge will commence
upon completion of the work. Notices will be published in the Eighth
Coast Guard District Local Notice to Mariners and will be broadcast via
the Coast Guard Broadcast Notice to Mariners System.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: June 11, 2015.
David M. Frank,
Bridge Administrator, Eighth Coast Guard District.
[FR Doc. 2015-14715 Filed 6-15-15; 8:45 am]
BILLING CODE 9110-04-P