Texas Eastern Transmission, LP; Notice of Application, 33264-33265 [2015-14274]
Download as PDF
33264
ACTION:
Federal Register / Vol. 80, No. 112 / Thursday, June 11, 2015 / Notices
Notice of open meeting.
This notice announces a
meeting of the DOE/NSF Nuclear
Science Advisory Committee (NSAC).
The Federal Advisory Committee Act
(Pub. L. 92–463, 86 Stat. 770) requires
that public notice of these meetings be
announced in the Federal Register.
DATES: Thursday, July 16, 2015, 8:30
a.m.–5:30 p.m.
ADDRESSES: Doubletree by Hilton
Bethesda—Washington, DC, 8120
Wisconsin Avenue, Bethesda, Maryland
20814, (301) 652–2000.
FOR FURTHER INFORMATION CONTACT:
Brenda L. May, U.S. Department of
Energy; SC–26/Germantown Building,
1000 Independence Avenue SW.,
Washington, DC 20585–1290.
Telephone: (301) 903–0536 or email:
brenda.may@science.doe.gov. The most
current information concerning this
meeting can be found on the Web site:
https://science.gov/np/nsac/meetings/.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to provide advice and
guidance on a continuing basis to the
Department of Energy and the National
Science Foundation on scientific
priorities within the field of basic
nuclear science research.
Tentative Agenda: Agenda will
include discussions of the following:
SUMMARY:
Thursday, July 16, 2015
• Perspectives from Department of
Energy and National Science
Foundation
• Update from the Department of
Energy and National Science
Foundation’s Nuclear Physics Office’s
• Report of the Mo-99 Subcommittee
• Discussion of the Mo-99
Subcommittee Report
• EIC Cost Report
• NSAC Isotope Report
• Status of the Long Range Plan Report
mstockstill on DSK4VPTVN1PROD with NOTICES
Note: The NSAC Meeting will be broadcast
live on the Internet. You may find out how
to access this broadcast by going to the
following site prior to the start of the
meeting. A video record of the meeting
including the presentations that are made
will be archived at this site after the meeting
ends: https://www.tvworldwide.com/events/
DOE/150716/.
Public Participation: The meeting is
open to the public. If you would like to
file a written statement with the
Committee, you may do so either before
or after the meeting. If you would like
to make oral statements regarding any of
these items on the agenda, you should
contact Brenda L. May, (301) 903–0536
or Brenda.May@science.doe.gov (email).
You must make your request for an oral
VerDate Sep<11>2014
17:06 Jun 10, 2015
Jkt 235001
statement at least five business days
before the meeting. Reasonable
provision will be made to include the
scheduled oral statements on the
agenda. The Chairperson of the
Committee will conduct the meeting to
facilitate the orderly conduct of
business. Public comment will follow
the 10-minute rule.
Minutes: The minutes of the meeting
will be available for review on the U.S.
Department of Energy’s Office of
Nuclear Physics Web site at https://
science.energy.gov/np/nsac/meetings/.
Issued in Washington, DC, on June 5, 2015.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2015–14298 Filed 6–10–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–499–000]
Texas Eastern Transmission, LP;
Notice of Application
Take notice that on May 22, 2015,
Texas Eastern Transmission, LP (Texas
Eastern), 5400 Westheimer Court,
Houston, Texas 77056, filed an
application pursuant to section 7(c) of
the Natural Gas Act and Part 157 of the
Commission’s regulations to construct
and operate its South Texas Expansion
Project (STEP). Specifically, Texas
Eastern requests authorization to
construct and operate the 8400 hp
Petronila Compressor Station in Nueces
County, Texas, an additional 8,400 hp
compressor unit at its existing Blessing
Compressor Station in Matagorda
County, Texas, and modifications to its
existing compressor stations in Brazoria,
Chambers, and Orange Counties, Texas,
to increase firm capacity by 400,000
dekatherms per day to high demand
downstream, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Berk
Donaldson, General Manager-Rates and
Certificates, (713) 627–4121, facsimile
(713) 627–5947, or by mail at: Texas
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Eastern Transmission, LP, P.O. Box
1642, Houston, Texas, 77251–1642.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
E:\FR\FM\11JNN1.SGM
11JNN1
Federal Register / Vol. 80, No. 112 / Thursday, June 11, 2015 / Notices
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 26, 2015.
Dated: June 5, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14274 Filed 6–10–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14654–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Twain Resources, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On December 12, 2014, Twain
Resources, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Tungstar Redux Water Power
Project (Tungstar Redux Project or
project) to be located at Pine Creek Mine
and along Morgan and Pine Creek, near
the City of Bishop in Inyo County,
VerDate Sep<11>2014
17:06 Jun 10, 2015
Jkt 235001
California. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An intake of an
unspecified design collecting Pine Creek
Mine discharge water from its discharge
point on Morgan Creek; (2) an 18-inchdiameter steel penstock of unspecified
length with a 450-foot vertical drop: (3)
A powerhouse: (4) a 600-kW impulse
turbine connected to a 625-kVA
generator; (5) a transmission line; (6) a
substation connecting to an existing 56kV main transmission line, and (7)
appurtenant facilities. The estimated
annual generation of the Tungstar
Redux Project would be 3,600
megawatt-hours.
Applicant Contact: Mr. Doug Hicks,
Twain Resources, LLC, 280 Florenca
Way, Reno, Nevada 89511; phone: (775)
997–3429.
FERC Contact: Joseph Hassell; phone:
(202) 502–8079: email joseph.hassell@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14654–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14654) in
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
33265
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: June 5, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14275 Filed 6–10–15; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL DEPOSIT INSURANCE
CORPORATION
Notice to All Interested Parties of the
Termination of the Receivership of
10461 First East Side Savings Bank,
Tamarac, Florida
Notice is hereby given that the Federal
Deposit Insurance Corporation (‘‘FDIC’’)
as Receiver for First East Side Savings
Bank, Tamarac, Florida (‘‘the Receiver’’)
intends to terminate its receivership for
said institution. The FDIC was
appointed receiver of First East Side
Savings Bank on October 19, 2012. The
liquidation of the receivership assets
has been completed. To the extent
permitted by available funds and in
accordance with law, the Receiver will
be making a final dividend payment to
proven creditors.
Based upon the foregoing, the
Receiver has determined that the
continued existence of the receivership
will serve no useful purpose.
Consequently, notice is given that the
receivership shall be terminated, to be
effective no sooner than thirty days after
the date of this Notice. If any person
wishes to comment concerning the
termination of the receivership, such
comment must be made in writing and
sent within thirty days of the date of
this Notice to: Federal Deposit
Insurance Corporation, Division of
Resolutions and Receiverships,
Attention: Receivership Oversight
Department 34.6, 1601 Bryan Street,
Dallas, TX 75201.
No comments concerning the
termination of this receivership will be
considered which are not sent within
this time frame.
Dated: June 8, 2015.
Federal Deposit Insurance Corporation.
Robert E. Feldman,
Executive Secretary.
[FR Doc. 2015–14279 Filed 6–10–15; 8:45 am]
BILLING CODE 6714–01–P
FEDERAL ELECTION COMMISSION
Sunshine Act Meeting
AGENCY:
E:\FR\FM\11JNN1.SGM
Federal Election Commission
11JNN1
Agencies
[Federal Register Volume 80, Number 112 (Thursday, June 11, 2015)]
[Notices]
[Pages 33264-33265]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14274]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-499-000]
Texas Eastern Transmission, LP; Notice of Application
Take notice that on May 22, 2015, Texas Eastern Transmission, LP
(Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed an
application pursuant to section 7(c) of the Natural Gas Act and Part
157 of the Commission's regulations to construct and operate its South
Texas Expansion Project (STEP). Specifically, Texas Eastern requests
authorization to construct and operate the 8400 hp Petronila Compressor
Station in Nueces County, Texas, an additional 8,400 hp compressor unit
at its existing Blessing Compressor Station in Matagorda County, Texas,
and modifications to its existing compressor stations in Brazoria,
Chambers, and Orange Counties, Texas, to increase firm capacity by
400,000 dekatherms per day to high demand downstream, all as more fully
set forth in the application which is on file with the Commission and
open to public inspection. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to Berk
Donaldson, General Manager-Rates and Certificates, (713) 627-4121,
facsimile (713) 627-5947, or by mail at: Texas Eastern Transmission,
LP, P.O. Box 1642, Houston, Texas, 77251-1642.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to
[[Page 33265]]
the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on June 26, 2015.
Dated: June 5, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-14274 Filed 6-10-15; 8:45 am]
BILLING CODE 6717-01-P