Download as PDF 33264 ACTION: Federal Register / Vol. 80, No. 112 / Thursday, June 11, 2015 / Notices Notice of open meeting. This notice announces a meeting of the DOE/NSF Nuclear Science Advisory Committee (NSAC). The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. DATES: Thursday, July 16, 2015, 8:30 a.m.–5:30 p.m. ADDRESSES: Doubletree by Hilton Bethesda—Washington, DC, 8120 Wisconsin Avenue, Bethesda, Maryland 20814, (301) 652–2000. FOR FURTHER INFORMATION CONTACT: Brenda L. May, U.S. Department of Energy; SC–26/Germantown Building, 1000 Independence Avenue SW., Washington, DC 20585–1290. Telephone: (301) 903–0536 or email: brenda.may@science.doe.gov. The most current information concerning this meeting can be found on the Web site: https://science.gov/np/nsac/meetings/. SUPPLEMENTARY INFORMATION: Purpose of the Board: The purpose of the Board is to provide advice and guidance on a continuing basis to the Department of Energy and the National Science Foundation on scientific priorities within the field of basic nuclear science research. Tentative Agenda: Agenda will include discussions of the following: SUMMARY: Thursday, July 16, 2015 • Perspectives from Department of Energy and National Science Foundation • Update from the Department of Energy and National Science Foundation’s Nuclear Physics Office’s • Report of the Mo-99 Subcommittee • Discussion of the Mo-99 Subcommittee Report • EIC Cost Report • NSAC Isotope Report • Status of the Long Range Plan Report mstockstill on DSK4VPTVN1PROD with NOTICES Note: The NSAC Meeting will be broadcast live on the Internet. You may find out how to access this broadcast by going to the following site prior to the start of the meeting. A video record of the meeting including the presentations that are made will be archived at this site after the meeting ends: https://www.tvworldwide.com/events/ DOE/150716/. Public Participation: The meeting is open to the public. If you would like to file a written statement with the Committee, you may do so either before or after the meeting. If you would like to make oral statements regarding any of these items on the agenda, you should contact Brenda L. May, (301) 903–0536 or Brenda.May@science.doe.gov (email). You must make your request for an oral VerDate Sep<11>2014 17:06 Jun 10, 2015 Jkt 235001 statement at least five business days before the meeting. Reasonable provision will be made to include the scheduled oral statements on the agenda. The Chairperson of the Committee will conduct the meeting to facilitate the orderly conduct of business. Public comment will follow the 10-minute rule. Minutes: The minutes of the meeting will be available for review on the U.S. Department of Energy’s Office of Nuclear Physics Web site at https:// science.energy.gov/np/nsac/meetings/. Issued in Washington, DC, on June 5, 2015. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2015–14298 Filed 6–10–15; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–499–000] Texas Eastern Transmission, LP; Notice of Application Take notice that on May 22, 2015, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed an application pursuant to section 7(c) of the Natural Gas Act and Part 157 of the Commission’s regulations to construct and operate its South Texas Expansion Project (STEP). Specifically, Texas Eastern requests authorization to construct and operate the 8400 hp Petronila Compressor Station in Nueces County, Texas, an additional 8,400 hp compressor unit at its existing Blessing Compressor Station in Matagorda County, Texas, and modifications to its existing compressor stations in Brazoria, Chambers, and Orange Counties, Texas, to increase firm capacity by 400,000 dekatherms per day to high demand downstream, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Berk Donaldson, General Manager-Rates and Certificates, (713) 627–4121, facsimile (713) 627–5947, or by mail at: Texas PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Eastern Transmission, LP, P.O. Box 1642, Houston, Texas, 77251–1642. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to E:\FR\FM\11JNN1.SGM 11JNN1 Federal Register / Vol. 80, No. 112 / Thursday, June 11, 2015 / Notices the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on June 26, 2015. Dated: June 5, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–14274 Filed 6–10–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14654–000] mstockstill on DSK4VPTVN1PROD with NOTICES Twain Resources, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 12, 2014, Twain Resources, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Tungstar Redux Water Power Project (Tungstar Redux Project or project) to be located at Pine Creek Mine and along Morgan and Pine Creek, near the City of Bishop in Inyo County, VerDate Sep<11>2014 17:06 Jun 10, 2015 Jkt 235001 California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An intake of an unspecified design collecting Pine Creek Mine discharge water from its discharge point on Morgan Creek; (2) an 18-inchdiameter steel penstock of unspecified length with a 450-foot vertical drop: (3) A powerhouse: (4) a 600-kW impulse turbine connected to a 625-kVA generator; (5) a transmission line; (6) a substation connecting to an existing 56kV main transmission line, and (7) appurtenant facilities. The estimated annual generation of the Tungstar Redux Project would be 3,600 megawatt-hours. Applicant Contact: Mr. Doug Hicks, Twain Resources, LLC, 280 Florenca Way, Reno, Nevada 89511; phone: (775) 997–3429. FERC Contact: Joseph Hassell; phone: (202) 502–8079: email joseph.hassell@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14654–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14654) in PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 33265 the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 5, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–14275 Filed 6–10–15; 8:45 am] BILLING CODE 6717–01–P FEDERAL DEPOSIT INSURANCE CORPORATION Notice to All Interested Parties of the Termination of the Receivership of 10461 First East Side Savings Bank, Tamarac, Florida Notice is hereby given that the Federal Deposit Insurance Corporation (‘‘FDIC’’) as Receiver for First East Side Savings Bank, Tamarac, Florida (‘‘the Receiver’’) intends to terminate its receivership for said institution. The FDIC was appointed receiver of First East Side Savings Bank on October 19, 2012. The liquidation of the receivership assets has been completed. To the extent permitted by available funds and in accordance with law, the Receiver will be making a final dividend payment to proven creditors. Based upon the foregoing, the Receiver has determined that the continued existence of the receivership will serve no useful purpose. Consequently, notice is given that the receivership shall be terminated, to be effective no sooner than thirty days after the date of this Notice. If any person wishes to comment concerning the termination of the receivership, such comment must be made in writing and sent within thirty days of the date of this Notice to: Federal Deposit Insurance Corporation, Division of Resolutions and Receiverships, Attention: Receivership Oversight Department 34.6, 1601 Bryan Street, Dallas, TX 75201. No comments concerning the termination of this receivership will be considered which are not sent within this time frame. Dated: June 8, 2015. Federal Deposit Insurance Corporation. Robert E. Feldman, Executive Secretary. [FR Doc. 2015–14279 Filed 6–10–15; 8:45 am] BILLING CODE 6714–01–P FEDERAL ELECTION COMMISSION Sunshine Act Meeting AGENCY: E:\FR\FM\11JNN1.SGM Federal Election Commission 11JNN1

Agencies

[Federal Register Volume 80, Number 112 (Thursday, June 11, 2015)]
[Notices]
[Pages 33264-33265]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14274]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-499-000]


Texas Eastern Transmission, LP; Notice of Application

    Take notice that on May 22, 2015, Texas Eastern Transmission, LP 
(Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed an 
application pursuant to section 7(c) of the Natural Gas Act and Part 
157 of the Commission's regulations to construct and operate its South 
Texas Expansion Project (STEP). Specifically, Texas Eastern requests 
authorization to construct and operate the 8400 hp Petronila Compressor 
Station in Nueces County, Texas, an additional 8,400 hp compressor unit 
at its existing Blessing Compressor Station in Matagorda County, Texas, 
and modifications to its existing compressor stations in Brazoria, 
Chambers, and Orange Counties, Texas, to increase firm capacity by 
400,000 dekatherms per day to high demand downstream, all as more fully 
set forth in the application which is on file with the Commission and 
open to public inspection. The filing may also be viewed on the web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to Berk 
Donaldson, General Manager-Rates and Certificates, (713) 627-4121, 
facsimile (713) 627-5947, or by mail at: Texas Eastern Transmission, 
LP, P.O. Box 1642, Houston, Texas, 77251-1642.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to

[[Page 33265]]

the party or parties directly involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file 
electronically should submit original and 5 copies of the protest or 
intervention to the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on June 26, 2015.

    Dated: June 5, 2015.
Kimberly D. Bose,
Secretary.