Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act, 32552 [2015-14059]
Download as PDF
32552
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
INDEPENDENT STUDENTS WITH DEPENDENTS OTHER THAN A SPOUSE—Continued
And they are
If the age of the student is
Married
Single
Then the education savings and asset
protection allowance is
*
*
*
*
*
64 .................................................................................................................................................................
*
*
*
[FR Doc. C1–2015–12803 Filed 6–8–15; 8:45 am]
BILLING CODE 1505–01–D
DEPARTMENT OF ENERGY
[Certification Notice—235]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of filing.
AGENCY:
On April 30, 2015, Pio Pico
Energy Center, LLC, as owner and
operator of a new base load electric
powerplant, submitted a coal capability
self-certification to the Department of
Energy (DOE) pursuant to § 201(d) of the
Powerplant and Industrial Fuel Use Act
of 1978 (FUA), as amended, and DOE
regulations. FUA and regulations
thereunder require DOE to publish a
notice of filing of self-certification in the
Federal Register. 42 U.S.C. 8311(d) and
10 CFR 501.61(c).
ADDRESSES: Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
SUPPLEMENTARY INFORMATION: Title II of
FUA, as amended (42 U.S.C. 8301 et
seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to FUA
in order to meet the requirement of coal
capability, the owner or operator of such
a facility proposing to use natural gas or
petroleum as its primary energy source
shall certify to the Secretary of Energy
(Secretary) prior to construction, or
prior to operation as a base load electric
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
20:33 Jun 08, 2015
Jkt 235001
*
Issued in Washington, DC, on June 3, 2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–14059 Filed 6–8–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–1810–000]
Dillon Power, LLC; Supplemental
Notice that Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Dillon
Power, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
Frm 00029
Fmt 4703
Sfmt 4703
*
10,400
*
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. Such certification
establishes compliance with FUA
section 201(a) as of the date it is filed
with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed
new base load electric powerplant has
filed a self-certification of coalcapability with DOE pursuant to FUA
section 201(d) and in accordance with
DOE regulations in 10 CFR 501.60 and
501.61:
OWNER: Pio Pico Energy Center, LLC
CAPACITY: 313 megawatts (MW)
PLANT LOCATION: Pio Pico Energy
Center, LLC, 7363 Calzada De La
Fuente, San Diego, CA 92154
IN-SERVICE DATE: Approximately
September 30, 2016
PO 00000
*
*
5,700
*
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 22,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–14017 Filed 6–8–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 80, Number 110 (Tuesday, June 9, 2015)]
[Notices]
[Page 32552]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14059]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Certification Notice--235]
Notice of Filing of Self-Certification of Coal Capability Under
the Powerplant and Industrial Fuel Use Act
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of filing.
-----------------------------------------------------------------------
SUMMARY: On April 30, 2015, Pio Pico Energy Center, LLC, as owner and
operator of a new base load electric powerplant, submitted a coal
capability self-certification to the Department of Energy (DOE)
pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act
of 1978 (FUA), as amended, and DOE regulations. FUA and regulations
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR
501.61(c).
ADDRESSES: Copies of coal capability self-certification filings are
available for public inspection, upon request, in the Office of
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC
20585.
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.
SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301
et seq.), provides that no new base load electric powerplant may be
constructed or operated without the capability to use coal or another
alternate fuel as a primary energy source. Pursuant to FUA in order to
meet the requirement of coal capability, the owner or operator of such
a facility proposing to use natural gas or petroleum as its primary
energy source shall certify to the Secretary of Energy (Secretary)
prior to construction, or prior to operation as a base load electric
powerplant, that such powerplant has the capability to use coal or
another alternate fuel. Such certification establishes compliance with
FUA section 201(a) as of the date it is filed with the Secretary. 42
U.S.C. 8311.
The following owner of a proposed new base load electric powerplant
has filed a self-certification of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance with DOE regulations in 10 CFR
501.60 and 501.61:
OWNER: Pio Pico Energy Center, LLC
CAPACITY: 313 megawatts (MW)
PLANT LOCATION: Pio Pico Energy Center, LLC, 7363 Calzada De La Fuente,
San Diego, CA 92154
IN-SERVICE DATE: Approximately September 30, 2016
Issued in Washington, DC, on June 3, 2015.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2015-14059 Filed 6-8-15; 8:45 am]
BILLING CODE 6450-01-P