Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 32624-32634 [2015-13815]
Download as PDF
32624
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
SUPPLEMENTARY INFORMATION:
NUCLEAR REGULATORY
COMMISSION
I. Obtaining Information and
Submitting Comments
[NRC–2015–0142]
Biweekly Notice: Applications and
Amendments to Facility Operating
Licenses and Combined Licenses
Involving No Significant Hazards
Considerations
Nuclear Regulatory
Commission.
ACTION: Biweekly notice.
AGENCY:
Pursuant to Section 189a. (2)
of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear
Regulatory Commission (NRC) is
publishing this regular biweekly notice.
The Act requires the Commission to
publish notice of any amendments
issued, or proposed to be issued and
grants the Commission the authority to
issue and make immediately effective
any amendment to an operating license
or combined license, as applicable,
upon a determination by the
Commission that such amendment
involves no significant hazards
consideration, notwithstanding the
pendency before the Commission of a
request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued from May 13,
2015 to May 27, 2015. The last biweekly
notice was published on May 26, 2015.
DATES: Comments must be filed by July
9, 2015. A request for a hearing must be
filed by August 10, 2015.
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0142. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Shirley Rohrer, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
5411, email: Shirley.Rohrer@nrc.gov.
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
A. Obtaining Information
Please refer to Docket ID NRC–2015–
0142 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0142.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in the SUPPLEMENTARY
INFORMATION section.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2015–
0142, facility name, unit number(s),
application date, and subject in your
comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
II. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses and
Proposed No Significant Hazards
Consideration Determination
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
§ 50.92 of Title 10 of the Code of Federal
Regulations (10 CFR), this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated, or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
E:\FR\FM\09JNN1.SGM
09JNN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
subject facility operating license or
combined license. Requests for a
hearing and a petition for leave to
intervene shall be filed in accordance
with the Commission’s ‘‘Agency Rules
of Practice and Procedure’’ in 10 CFR
part 2. Interested person(s) should
consult a current copy of 10 CFR 2.309,
which is available at the NRC’s PDR,
located at One White Flint North, Room
O1–F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. The
NRC’s regulations are accessible
electronically from the NRC Library on
the NRC’s Web site at https://
www.nrc.gov/reading-rm/doccollections/cfr/. If a request for a hearing
or petition for leave to intervene is filed
by the above date, the Commission or a
presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the request and/or petition; and
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the requestor/petitioner
intends to rely in proving the contention
at the hearing. The requestor/petitioner
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the requestor/petitioner intends
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
to rely to establish those facts or expert
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the requestor/
petitioner to relief. A requestor/
petitioner who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment unless the Commission
finds an imminent danger to the health
or safety of the public, in which case it
will issue an appropriate order or rule
under 10 CFR part 2.
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC’s E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten 10
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
32625
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC’s public Web site
at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
E:\FR\FM\09JNN1.SGM
09JNN1
tkelley on DSK3SPTVN1PROD with NOTICES
32626
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Meta System Help Desk through
the ‘‘Contact Us’’ link located on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, in some
instances, a request to intervene will
require including information on local
residence in order to demonstrate a
proximity assertion of interest in the
proceeding. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice.
Requests for hearing, petitions for leave
to intervene, and motions for leave to
file new or amended contentions that
are filed after the 60-day deadline will
not be entertained absent a
determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i)–(iii).
For further details with respect to
these license amendment applications,
see the application for amendment
which is available for public inspection
in ADAMS and at the NRC’s PDR. For
additional direction on accessing
information related to this document,
see the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Dominion Nuclear Connecticut, Inc.,
(DNC), Docket No. 50–336, Millstone
Power Station, Unit 2 (MPS2), New
London County, Connecticut
Date of amendment request: October
31, 2014. A publicly-available version is
in ADAMS under Accession No.
ML14310A187.
Description of amendment request:
The amendment would revise the MPS2
Final Safety Analysis Report (FSAR) to
allow the use of the encoded ultrasonic
examination technique in lieu of the
FSAR committed additional
radiography examination for certain
piping welds fabricated to ANSI
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
[American National Standards Institute]
B31.1.0. The amendment would also
revise the MPS2 Facility Operating
License No. DPR–65.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
Criterion 1:
Does the proposed amendment involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
Previously evaluated accident
consequences are not impacted by the
proposed amendment because credited
mitigating equipment continues to perform
its design function. The proposed
amendment does not significantly impact the
probability of an accident previously
evaluated because those Systems, Structures
and Components (SSCs) that can initiate an
accident are not significantly impacted.
Based on the above, DNC concludes that
the proposed amendment to the MPS2 FSAR
to allow the use of UT [ultrasonic] in lieu of
RT [radiography] examination for certain
piping welds fabricated to ANSI B31.1.0,
does not involve a significant increase in the
probability or consequences of an accident or
transient previously evaluated in the safety
analysis report.
Criterion 2:
Does the proposed amendment create the
possibility for a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed amendment does not create
a new or different kind of accident from any
accident previously evaluated because
previously credited SSCs are not significantly
impacted. The proposed amendment does
not involve a physical alteration of the plant
and no new or different types of equipment
will be installed. There is no impact upon the
existing failure modes and effects analysis;
and conformance to the single failure
criterion is maintained.
Based on the above, DNC concludes that
the proposed amendment to the MPS2 FSAR
to allow the use of UT in lieu of RT
examination for certain piping welds
fabricated to ANSI B31.1.0, does not create
the possibility of a new or different kind of
accident or transient from any previously
evaluated.
Criterion 3:
Does the proposed amendment involve a
significant reduction in the margin of safety?
Response: No.
The proposed amendment to the MPS2
FSAR will not cause an accident to occur and
will not result in any change in the operation
of the associated accident mitigation
equipment. The proposed amendment does
not involve a significant reduction in margin
of safety because plant response to any
transient or analyzed accident event is
unchanged.
E:\FR\FM\09JNN1.SGM
09JNN1
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
Based on the above, DNC concludes the
proposed amendment to the MPS2 FSAR to
allow the use of UT in lieu of RT
examination for certain piping welds
fabricated to ANSI B31.1.0, does not involve
a significant reduction in the margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lillian M.
Cuoco, Senior Counsel, Dominion
Resources Services, Inc., 120 Tredegar
Street, RS–2, Richmond, VA 23219.
Acting NRC Branch Chief: Michael I.
Dudek.
tkelley on DSK3SPTVN1PROD with NOTICES
Duke Energy Carolinas, LLC, Docket
Nos. 50–369 and 50–370, McGuire
Nuclear Station, Units 1 and 2,
Mecklenburg County, North Carolina
Date of amendment request: March
23, 2015. A publicly-available version is
in ADAMS under Accession No.
ML15099A393.
Description of amendment request:
The amendments would modify the
definition of RATED THERMAL
POWER and delete a footnote that
allowed for stagered implementation of
the previously approved Measurement
Uncertainty Recapture Power Uprate.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
Criterion 1:
Does the proposed amendment involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
This LAR [license amendment request]
proposes administrative non-technical
changes only. These proposed changes do not
adversely affect accident initiators or
precursors nor alter the design assumptions,
conditions, or configurations of the facility.
The proposed changes do not alter or prevent
the ability of structures, systems[,] and
components (SSCs) to perform their intended
function to mitigate the consequences of an
initiating event witin the assumed
acceptance limits.
Given the above discussion, it is concluded
the proposed amendment does not
significantly increase the probability or
consequences of an accident previously
evaluated.
Criterion 2:
Does the proposed amendment create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
Response: No.
The LAR proposes administrative nontechnical changes only. The proposed
changes will not alter the design
requirements of any SSC or its function
during accident conditions. No new or
different accidents result from the changes
proposed. The changes do not involve a
physical alteration of the plant or any
changes in methods governing normal plant
operation. The changes do not alter
assumptions made in the safety analysis.
Given the above discussion, it is concluded
the proposed amendment does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated.
Criterion 3:
Does the proposed amendment involve a
significant reduction in the margin of safety?
Response: No.
This LAR proposes administrative nontechnical changes only. The proposed
changes do not alter the manner in which
safety limits, limiting safety system settings
or limiting conditions for operation are
determined. The safety analysis acceptance
criteria are not affected by these changes. The
proposed changes will not result in plant
operation in a configuration outside the
design basis. The proposed changes do not
adversely affect systems that respond to
safely shutdown the plant and to maintain
the plant in a safe shutdown condition.
Given the above discussion, it is concluded
[that] the proposed amendment does not
involve a significant reduction in the margin
of safety.
The NRC staff has reviewed the licensee’s
analysis and, based on this review, it appears
that the three standards of 10 CFR 50.92(c)
are satisfied. Therefore, the NRC staff
proposes to determine that the amendment
request involves no significant hazards
consideration.
Attorney for licensee: Lara S. Nichols,
Associate General Counsel, Duke Energy
Corporation, 526 South Church Street—
EC07H, Charlotte, NC 28202.
NRC Branch Chief: Robert J.
Pascarelli.
NextEra Energy Point Beach, LLC,
Docket Nos. 50–266 and 50–301, Point
Beach Nuclear Plant, Units 1 and 2,
Town of Two Creeks, Manitowac
County, Wisconsin
Date of amendment request: March
27, 2015. A publicly-available version is
in ADAMS under Accession No.
ML15086A378.
Description of amendment request:
The proposed amendment would
modify the technical specifications (TS)
requirements regarding steam generator
tube inspections and reporting as
described in TS Task Force (TSTF)
traveler TSTF–510, Revision 2,
‘‘Revision to Steam Generator Program
Inspection Frequencies and Tube
Sample Selection.’’
Basis for proposed no significant
hazards consideration determination:
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
32627
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is provided below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of any accident previously
evaluated?
Response: No.
The proposed change revises the Steam
Generator (SG) Program to modify the
frequency of verification of SG tube integrity
and SG tube sample selection. A steam
generator tube rupture (SGTR) event is one of
the design basis accidents that are analyzed
as part of a plant’s licensing basis. The
proposed SG tube inspection frequency and
sample selection criteria will continue to
ensure that the SG tubes are inspected such
that the probability of a SGTR is not
increased. The consequences of a SGTR are
bounded by the conservative assumptions in
the design basis accident analysis. The
proposed change will not cause the
consequences of a SGTR to exceed those
assumptions.
Therefore, it is concluded that this change
does not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any previously evaluated?
Response: No.
The proposed changes to the Steam
Generator Program will not introduce any
adverse changes to the plant design basis or
postulated accidents resulting from potential
tube degradation. The proposed change does
not affect the design of the SGs or their
method of operation. In addition, the
proposed change does not impact any other
plant system or component.
Therefore, it is concluded that this change
does not create the possibility of a new or
different kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in the margin of safety?
Response: No.
The SG tubes in pressurized water reactors
are an integral part of the reactor coolant
pressure boundary and, as such, are relied
upon to maintain the primary system’s
pressure and inventory. As part of the reactor
coolant pressure boundary, the SG tubes are
unique in that they are also relied upon as
a heat transfer surface between the primary
and secondary systems such that residual
heat can be removed from the primary
system. In addition, the SG tubes also isolate
the radioactive fission products in the
primary coolant from the secondary system.
In summary, the safety function of a SG is
maintained by ensuring the integrity of its
tubes.
Steam generator tube integrity is a function
of the design, environment, and the physical
condition of the tube. The proposed change
does not affect tube design or operating
environment. The proposed change will
continue to require monitoring of the
physical condition of the SG tubes such that
there will not be a reduction in the margin
of safety compared to the current
requirements.
E:\FR\FM\09JNN1.SGM
09JNN1
32628
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
Therefore, it is concluded that the
proposed change does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: William Blair,
Managing Attorney—Nuclear, Florida
Power & Light Company, P.O. Box
14000, 700 Universe Boulevard, Juno
Beach, FL 33408–0420.
NRC Branch Chief: David L. Pelton.
tkelley on DSK3SPTVN1PROD with NOTICES
Pacific Gas and Electric Company,
Docket Nos. 50–275 and 50–323, Diablo
Canyon Nuclear Power Plant, Units 1
and 2, San Luis Obispo County,
California
Date of amendment request: April 16,
2015. A publicly-available version is in
ADAMS under Accession No.
ML15107A333.
Description of amendment request:
The amendments propose to revise the
Best Estimate Analyzer for the Core
Operations-Nuclear (BEACON) power
distribution monitoring system
methodology described in the Updated
Final Safety Analysis Report (UFSAR)
Section 4.3.2.2, ‘‘Power Distribution,’’ to
the method described in the
Westinghouse Electric Company LLC
proprietary topical report (TR) WCAP–
12472–P–A, Addendum 4, ‘‘BEACON
Core Monitoring and Operation Support
System.’’ These amendments also
propose to revise Technical
Specification (TS) 5.6.5, ‘‘CORE
OPERATING LIMITS REPORT (COLR),’’
Section b to replace Westinghouse
proprietary TR WCAP–11596–P–A,
‘‘Qualification of the PHOENIX–P/ANC
Nuclear Design System for Pressurized
Water Reactor Cores,’’ with NRCapproved proprietary TR WCAP–16045–
P–A, ‘‘Qualification of the TwoDimensional Transport Code
PARAGON,’’ and NRC-approved
proprietary TR WCAP–16045–P–A,
Addendum 1–A, ‘‘Qualification of the
NEXUS Nuclear Data Methodology.’’
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
The proposed change would revise the
Updated Final Safety Analysis Report
(UFSAR) to allow the use of the BEACON
code methodology contained in the NRCapproved WCAP–12472–P–A, Addendum 4,
Revision 0, instead of the BEACON
methodology contained in NRC-approved
WCAP–12472–P–A, Addendum 1–A. In
addition, the proposed change would revise
Technical Specification (TS) 5.6.5, ‘‘CORE
OPERATING LIMITS REPORT (COLR),’’
Section b to replace WCAP–11596–P–A,
‘‘Qualification of the Phoenix-P/ANC Nuclear
Design System for Pressurized Water Reactor
Cores,’’ with NRC-approved WCAP–16045–
P–A, ‘‘Qualification of the Two-Dimensional
Transport Code PARAGON,’’ and NRCapproved WCAP–16045–P–A, Addendum 1–
A, ‘‘Qualification of the NEXUS Nuclear Data
Methodology,’’ in the list of NRC-approved
analytical limits used to determine core
operating limits[,] [s]pecifically the limit for
refueling boron concentration (i.e., the
shutdown margin) required by TS 3.9.1,
‘‘Boron Concentration.’’
The changes to the BEACON system and
TS 5.6.5 core operating limits methodologies,
which this license amendment proposes, are
improvements over the current
methodologies in use at the Diablo Canyon
Power Plant (DCPP). The NRC staff reviewed
and approved these methodologies and
concluded that these analytical methods are
acceptable as a replacement for the current
analytical methods. Thus the BEACON
system operation to perform power
distribution calculations and the core
operating limits determined using the
proposed analytical methods will continue to
assure that the plant operates in a safe
manner and, thus, the proposed changes do
not involve an increase in the probability of
an accident.
The BEACON system power distribution
calculations and the core operating limits
determined by use of the proposed new
methodologies will not increase the reactor
power level or the core fission product
inventory, and will not change any transport
assumptions or the shutdown margin
requirements of the TS. In addition, the
proposed changes will not alter any accident
analyses assumptions discussed in the
UFSAR. As such, the DCPP will continue to
operate within the power distribution limits
and shutdown margins required by the plant
TS and within the assumptions of the safety
analyses described in the UFSAR. As such,
the proposed changes do not involve a
significant increase in the consequences of an
accident.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different accident
from any accident previously evaluated?
Response: No.
The proposed change involves the use of
new and NRC-approved methodologies used
by the BEACON System to perform core
power distribution calculations and in TS
5.6.5, ‘‘CORE OPERATING LIMITS REPORT
(COLR),’’ to determine core operating limits
(i.e., refueling boron concentration or
shutdown margin requirement).
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
The proposed change provides revised
analytical methods for the BEACON system
and determining core operating limit for
refueling boron concentration, and does not
change any system functions or maintenance
activities. The change does not involve
physical alteration of the plant, that is, no
new or different type of equipment will be
installed. The change does not alter
assumptions made in the safety analyses and
continues to assure the plant is operated
within safe limits. This change does not
create new failure modes or mechanisms that
are not identifiable during testing, and no
new accident precursors are generated.
The BEACON system is not used to control
the performance of any plant equipment. The
BEACON system core power distribution
calculations and core operating limits
developed using the new methodologies will
be determined using NRC-approved
methodologies, and will remain consistent
with all applicable plant safety analysis
limits addressed in the DCPP UFSAR and the
shutdown margin requirements of the TS. As
such, use of the new BEACON and COLR
methodologies will not cause a new or
different accident.
Therefore, the proposed change does not
create the possibility of a new or different
accident from any accident previously
evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The margin of safety is established through
equipment design, operating parameters, and
the setpoints at which automatic actions are
initiated. The proposed changes do not
physically alter safety-related systems, nor
does it affect the way in which safety related
systems perform their functions. The
setpoints at which protective actions are
initiated are not altered by the proposed
changes. Therefore, sufficient equipment
remains available to actuate upon demand for
the purpose of mitigating an analyzed event.
The proposed methodology changes are an
improvement that will allow more accurate
modeling of core performance and
determination of the required refueling boron
concentration. The NRC has reviewed and
approved these methodologies for their
intended use in lieu of the current
methodologies; thus, the margin of safety is
not reduced due to this change.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment requests involve no
significant hazards consideration.
Attorney for licensee: Jennifer Post,
Esq., Pacific Gas and Electric Company,
P.O. Box 7442, San Francisco, California
94120.
NRC Branch Chief: Michael T.
Markley.
E:\FR\FM\09JNN1.SGM
09JNN1
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
Southern Nuclear Operating Company,
Inc., Docket Nos. 52–025 and 52–026,
Vogtle Electric Generating Plant (VEGP)
Units 3 and 4, Burke County, Georgia
tkelley on DSK3SPTVN1PROD with NOTICES
Date of amendment request: May 26,
2015. A publically-available version is
in ADAMS under Accession No.
ML15146A444.
Description of amendment request:
The proposed change would amend
Combined License Nos. NPF–91 and
NPF–92 for the VEGP Units 3 and 4. The
requested amendment proposes to
depart from Tier 2* and associated Tier
2 information in the VEGP Units 3 and
4 Updated Final Safety Analysis Report
(UFSAR) (which includes the plant
specific Design Control Document Tier
2 information) to revise the application
of American Institute for Steel
Construction (AISC) N690–1994,
Specification for the Design, Fabrication
and Erection of Steel Safety Related
Structures for Nuclear Facilities, to
allow use of American Welding Society
(AWS) D1.1–2000, Structural Welding
Code-Steel, in lieu of the AWS D1.1–
1992 edition identified in AISC N690–
1994.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The design functions of the nuclear island
structures are to provide support, protection,
and separation for the seismic Category I
mechanical and electrical equipment located
in the nuclear island. The nuclear island
structures are structurally designed to meet
seismic Category I requirements as defined in
Regulatory Guide 1.29. The design functions
of the seismic Category II portions of the
annex building and turbine building are to
provide integrity for non-seismic items
located in the proximity of safety-related
items, the failure of which during a safe
shutdown earthquake could result in loss of
function of safety-related items.
The use of AWS D1.1–2000 provides
criteria for the design, qualification,
fabrication, and inspection of welds for
nuclear island structures and seismic
Category II portions of the annex building
and turbine building. These structures
continue to meet the applicable portions of
ACI [American Concrete Institute] 349, the
remaining applicable portions of AISC N690
not related to requirements for welding,
including the supplemental requirements
described in UFSAR Subsections 3.8.4.4.1
and 3.8.4.5, and the supplemental
requirements identified in the UFSAR
Subsection 3.8.3 for structural modules. The
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
use of AWS D1.1–2000 does not have an
adverse impact on the response of the
nuclear island structures, or seismic Category
II portions of the annex building and turbine
building to safe shutdown earthquake ground
motions or loads due to anticipated
transients or postulated accident conditions.
The change does not impact the support,
design, or operation of mechanical and fluid
systems. There is no change to plant systems
or the response of systems to postulated
accident conditions. There is no change to
the predicted radioactive releases due to
normal operation or postulated accident
conditions. The plant response to previously
evaluated accidents or external events is not
adversely affected, nor does the change
described create any new accident
precursors.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change includes the use of
AWS D1.1–2000 to provide criteria for the
design, qualification, fabrication, and
inspection of welds for nuclear island
structures and the seismic Category II
portions of the annex building and turbine
building. The proposed change provides a
consistent set of requirements for welding of
structures required to be designed to the
requirements of ACI 349 and AISC N690. The
change to the details does not change the
design function, support, design, or operation
of mechanical and fluid systems. The change
to the weld details does not result in a new
failure mechanism for the pertinent
structures or new accident precursors. As a
result, the design function of the structures
is not adversely affected by the proposed
change.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The AWS D1.1–2000 code is a consensus
standard written, revised, and approved by
industry experts experienced in welding and
weld design. The proposed change adds
AWS D1.1–2000 to the list of applicable
codes and standards in the UFSAR. The 2000
edition includes criteria that consider
directionality in the weld which allows for
an increase factor on structural fillet weld
strength relative to the angle of load
direction. These changes are supported by
tests that provide the justification for criteria
that consider the directionality. The testing
and analysis is reported in an AISC Journal
Article, ‘‘Proposed Working Stresses for Fillet
Welds in Building Construction,’’ by T. R.
Higgins and FR Preece. These changes can be
similarly applied to welds in the AP1000 to
continue to provide the necessary safety
margin. Therefore, the proposed amendment
does not involve a significant reduction in a
margin of safety.
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
32629
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: M. Stanford
Blanton, Balch & Bingham LLP, 1710
Sixth Avenue North, Birmingham, AL
35203–2015.
NRC Branch Chief: Lawrence J.
Burkhart.
Tennessee Valley Authority, Docket No.
50–259, Browns Ferry Nuclear Plant,
Unit 1, Limestone County, Alabama
Date of amendment request: March 9,
2015. A publicly-available version is in
ADAMS under Accession No.
ML15111A396.
Description of amendment request:
The amendment would revise the
Technical Specifications (TS) Section
3.1.4, ‘‘Control Rod Scram Times,’’
based on industry Technical
Specifications Task Force (TSTF)
Change Traveler TSTF–460–A, Revision
0, that has been approved (August 23,
2004; 69 FR 51864) generically for the
boiling water reactor (BWR) Standard
Technical Specifications, NUREG–1433
(BWR/4). The required frequency of
Surveillance Requirement 3.1.4.2
regarding control rod scram time testing
will be changed from ‘‘120 days
cumulative operation in MODE 1’’ to
‘‘200 days cumulative operation in
MODE 1.’’ The 200-day frequency is
based on operating experience that has
shown control rod scram times do not
significantly change over an operating
cycle.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration (NSHC) by adopting the
NSHC that the NRC published on
August 23, 2004 (69 FR 51854), which
is presented below:
1. Does the change involve a significant
increase in the probability or consequences
of an accident previously evaluated?
Response: No.
The proposed change extends the
frequency for testing control rod scram time
testing from every 120 days of cumulative
Mode 1 operation to 200 days of cumulative
Mode 1 operation. The frequency of
surveillance testing is not an initiator of any
accident previously evaluated. The frequency
of surveillance testing does not affect the
ability to mitigate any accident previously
evaluated, as the tested component is still
required to be operable.
Therefore, the proposed change does not
involve a significant increase in the
E:\FR\FM\09JNN1.SGM
09JNN1
32630
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
probability or consequences of an accident
previously evaluated.
2. Does the change create the possibility of
a new or different kind of accident from any
accident previously evaluated?
Response: No.
The proposed change extends the
frequency for testing control rod scram time
testing from every 120 days of cumulative
Mode 1 operation to 200 days of cumulative
Mode 1 operation. The proposed change does
not result in any new or different modes of
plant operation.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change extends the
frequency for testing control rod scram time
testing from every 120 days of cumulative
Mode 1 operation to 200 days of cumulative
Mode 1 operation. The proposed change
continues to test the control rod scram time
to ensure the assumptions in the safety
analysis are protected.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on its
own analysis, determines that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: General
Counsel, Tennessee Valley Authority,
400 West Summit Hill Drive, 6A West
Tower, Knoxville, TN 37902.
NRC Branch Chief: Shana R. Helton.
tkelley on DSK3SPTVN1PROD with NOTICES
Union Electric Company, Docket No.
50–483, Callaway Plant, Unit 1,
Callaway County, Missouri
Date of amendment request: March
12, 2015. A publicly-available version is
in ADAMS under Accession No.
ML15071A403.
Description of amendment request:
The proposed amendment would
modify Technical Specification (TS)
requirements in order to address NRC
Generic Letter 2008–01, ‘‘Managing Gas
Accumulation in Emergency Core
Cooling, Decay Heat Removal, and
Containment Spray Systems,’’ dated
January 11, 2008 (ADAMS Accession
No. ML072910759), as described in TS
Task Force (TSTF) traveler TSTF–523–
A, Revision 2, ‘‘Generic Letter 2008–01,
Managing Gas Accumulation’’ (ADAMS
Accession No. ML13053A075).
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change revises or adds
Surveillance Requirements (SRs) that require
verification that the Emergency Core Cooling
System (ECCS), the Residual Heat Removal
(RHR) System, and the Containment Spray
(CS) System, are not rendered inoperable due
to accumulated gas and to provide
allowances that permit performance of the
verification. Gas accumulation in the subject
systems is not an initiator of any accident
previously evaluated. As a result, the
probability of any accident previously
evaluated is not significantly increased. The
proposed SRs ensure that the subject systems
continue to be capable to perform their
assumed safety function and are not rendered
inoperable due to gas accumulation. Thus,
the consequences of any accident previously
evaluated are not significantly increased.
Based on the above, the proposed change
does not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change revises or adds SRs
that require verification that the ECCS, the
RHR System, and the CS System are not
rendered inoperable due to accumulated gas
and to provide allowances that permit
performance of the revised verification. The
proposed change does not involve a physical
alteration of the plant (i.e., no new or
different type of equipment will be installed)
or a change in the methods governing normal
plant operation. In addition, the proposed
change does not impose any new or different
requirements that could initiate an accident.
The proposed change does not alter
assumptions made in the safety analysis and
is consistent with the safety analysis
assumptions.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change revises or adds SRs
that require verification that the ECCS, the
RHR System, and the CS System are not
rendered inoperable due to accumulated gas
and to provide allowances which permit
performance of the revised verification. The
proposed change adds new requirements to
manage gas accumulation in order to ensure
the subject systems are capable of performing
their assumed safety functions. The proposed
SRs are more comprehensive than the current
SRs and will ensure that the assumptions of
the safety analysis are protected. The
proposed change does not adversely affect
any current plant safety margins or the
reliability of the equipment assumed in the
safety analysis. Therefore, there are no
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
changes being made to any safety analysis
assumptions, safety limits, or limiting safety
system settings that would adversely affect
plant safety as a result of the proposed
change.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: John O’Neill,
Esq., Pillsbury Winthrop Shaw Pittman
LLP, 2300 N Street NW., Washington,
DC 20037.
NRC Branch Chief: Michael T.
Markley.
Union Electric Company, Docket No.
50–483, Callaway Plant, Unit 1,
Callaway County, Missouri
Date of amendment request: March 9,
2015, as supplemented by letter dated
April 8, 2015. Publicly-available
versions are in ADAMS under
Accession Nos. ML15068A422 and
ML15098A575.
Description of amendment request:
The proposed amendment would
modify Technical Specification (TS)
requirements regarding steam generator
tube inspections and reporting as
described in TS Task Force (TSTF)
traveler TSTF–510, Revision 2,
‘‘Revision to Steam Generator Program
Inspection Frequencies and Tube
Sample Selection’’ (ADAMS Accession
No. ML110610350), with some minor
administrative differences.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change revises the Steam
Generator (SG) Program to modify the
frequency of verification of SG tube integrity
and SG tube sample selection. A steam
generator tube rupture (SGTR) event is one of
the design basis accidents that are analyzed
as part of the plant’s licensing basis. The
proposed SG tube inspection frequency and
sample selection criteria will continue to
ensure that the SG tubes are inspected such
that the probability of [an] SGTR is not
increased. The consequences of [an] SGTR
are bounded by the conservative assumptions
in the design basis accident analysis. The
proposed change will not cause the
E:\FR\FM\09JNN1.SGM
09JNN1
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
consequences of [an] SGTR to exceed those
assumptions.
Therefore, it is concluded that this change
does not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes to the Steam
Generator Program will not introduce any
adverse changes to the plant design basis or
postulated accidents resulting from potential
tube degradation. The proposed change does
not affect the design of the SGs or their
method of operation. In addition, the
proposed change does not impact any other
plant system or component.
Therefore, it is concluded that this change
does not create the possibility of a new or
different kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The SG tubes in pressurized water reactors
are an integral part of the reactor coolant
pressure boundary and, as such, are relied
upon to maintain the primary system’s
pressure and inventory. As part of the reactor
coolant pressure boundary, the SG tubes are
unique in that they are also relied upon as
a heat transfer surface between the primary
and secondary systems such that residual
heat can be removed from the primary
system. In addition, the SG tubes also isolate
the radioactive fission products in the
primary coolant from the secondary system.
These safety functions are maintained by
ensuring integrity of the SG tubes.
Steam generator tube integrity is a function
of the design, environment, and the physical
condition of the tube. The proposed change
does not affect tube design or operating
environment. The proposed change will
continue to require monitoring of the
physical condition of the SG tubes such that
there will not be a reduction in the margin
of safety compared to the current
requirements.
Therefore, it is concluded that the
proposed change does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’ analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: John O’Neill,
Esq., Pillsbury Winthrop Shaw Pittman
LLP, 2300 N Street, NW., Washington,
DC 20037.
NRC Branch Chief: Michael T.
Markley.
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
III. Notice of Issuance of Amendments
to Facility Operating Licenses and
Combined Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and (3)
the Commission’s related letter, Safety
Evaluation and/or Environmental
Assessment as indicated. All of these
items can be accessed as described in
the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Dominion Nuclear Connecticut, Inc.,
Docket No. 50–336, Millstone Power
Station, Unit 2 (MPS2), New London
County, Connecticut
Date of amendment request: April 11,
2014.
Brief description of amendment: The
amendment revised the Technical
Specifications (TSs), adding topical
report BAW–10240(P)(A),
‘‘Incorporation of M5TM Properties in
Framatome ANP Approved Methods,’’
to the referenced analytical methods in
TS 6.9.1.8.b, ‘‘Core Operating Limits
Report,’’ as an acceptable method used
to determine core operating limits for
MPS2.
PO 00000
Frm 00108
Fmt 4703
Sfmt 4703
32631
Date of issuance: May 18, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 60 days from the date of
issuance.
Amendment No.: 319. A publiclyavailable version is in ADAMS under
Accession No. ML15093A441;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–65: Amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: November 25, 2014 (79 FR
70212).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 18, 2015.
No significant hazards consideration
comments received: No.
Dominion Nuclear Connecticut, Inc.,
Docket No. 50–336, Millstone Power
Station, Unit 2, New London County,
Connecticut
Date of amendment request: March
28, 2014.
Brief description of amendment: The
proposed amendment deletes the
Technical Specification (TS) Index and
makes several other editorial, corrective
and minor changes to the TSs.
Date of issuance: May 20, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 30 days from the date of
issuance.
Amendment No.: 320. A publiclyavailable version is in ADAMS under
Accession No. ML14093A027;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–65: Amendment revised the
Renewed Operating License and TSs.
Date of initial notice in Federal
Register: November 25, 2014 (79 FR
70212).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 20, 2015.
No significant hazards consideration
comments received: No.
Dominion Nuclear Connecticut, Inc.,
Docket No. 50–423, Millstone Power
Station, Unit 3, New London County,
Connecticut
Date of amendment request: March
28, 2014.
Brief description of amendment: The
amendment deleted the Technical
Specification (TS) index and made other
editorial, corrective, and minor changes
to the TSs.
E:\FR\FM\09JNN1.SGM
09JNN1
32632
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
Date of issuance: May 20, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 30 days from the date of
issuance.
Amendment No.: 261. A publiclyavailable version is in ADAMS under
Accession No. ML15098A034;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. NPF–49: Amendment revised the
Renewed Operating License and TSs.
Date of initial notice in Federal
Register: November 25, 2014 (79 FR
70213).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 20, 2015.
No significant hazards consideration
comments received: No.
tkelley on DSK3SPTVN1PROD with NOTICES
Duke Energy Progress, Inc., Docket No.
50–261, H. B. Robinson Steam Electric
Plant Unit 2, Darlington County, South
Carolina
Date of application for amendment:
June 7, 2013, as supplemented by letter
dated July 24, 2014.
Brief description of amendment: The
amendment revised the Technical
Specifications (TSs) by deleting
Surveillance Requirements (SRs) 3.1.7.1,
3.1.7.2, and 3.1.7.3 of TS 3.1.7, ‘‘Rod
Position Indication,’’ and renumbering
SR 3.1.7.4 as SR 3.1.7.1.
Date of issuance: May 27, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 241. A publiclyavailable version is in ADAMS under
Accession No. ML15068A386;
documents related to this amendment
are listed in the Safety Evaluation (SE)
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–23: Amendment revised the
Facility Operating License and TSs.
Date of initial notice in Federal
Register: August 20, 2013 (78 FR
51222). The supplemental letter dated
July 24, 2014, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a SE
dated May 27, 2015.
No significant hazards consideration
comments received: No.
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
Duke Energy Progress, Inc., Docket No.
50–261, H. B. Robinson Steam Electric
Plant Unit 2, Hartsville, South Carolina
Date of amendment request: June 20,
2014.
Brief description of amendment: The
amendment revised Technical
Specification (TS) 5.5.9 for the Steam
Generator Program accident-induced
leakage rate value for any design-basis
accident, other than a steam generator
tube rupture.
Date of issuance: May 26, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 240. A publiclyavailable version is in ADAMS under
Accession No. ML15062A343;
documents related to this amendment
are listed in the Safety Evaluation (SE)
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–23: Amendment revised the
Facility Operating License and TSs.
Date of initial notice in Federal
Register: September 16, 2014 (79 FR
55510).
The Commission’s related evaluation
of the amendment is contained in an SE
dated May 26, 2015.
No significant hazards consideration
comments received: No.
Entergy Nuclear Operations, Inc.,
Docket Nos. 50–247 and 50–286, Indian
Point Nuclear Generating Units 2 and 3,
Westchester County, New York
Date of amendment request: April 1,
2014.
Brief description of amendments: The
amendments revised the technical
specifications (TSs) by implementing
Technical Specification Task Force
Technical Change Traveler 510,
Revision 2, ‘‘Revision to Steam
Generator Program Inspection
Frequencies and Tube Sample
Selection.’’
Date of issuance: May 26, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 281 and 257. A
publicly-available version is in ADAMS
under Accession No. ML15110A009;
documents related to these amendments
are listed in the safety evaluation (SE)
enclosed with the amendments.
Facility Operating License Nos. DPR–
26 and DPR–64: Amendments revised
the facility operating license and TSs.
Date of initial notice in Federal
Register: July 8, 2014 (79 FR 38588).
The Commission’s related evaluation
of the amendment is contained in an SE
dated May 26, 2015.
No significant hazards consideration
comments received: No.
PO 00000
Frm 00109
Fmt 4703
Sfmt 4703
Entergy Nuclear Operations, Inc.,
Docket No. 50–255, Palisades Nuclear
Plant (PNP), Van Buren County,
Michigan
Date of application for amendment:
June 11, 2014.
Brief description of amendment: The
amendment modified PNP technical
specifications (TSs) to adopt the
changes described in TS Task Force
(TSTF) traveler TSTF–426, Revision 5,
‘‘Revise or Add Actions to Preclude
Entry into [Limiting Condition for
Operation (LCO)] 3.0.3—[Risk-Informed
TSTF (RITSTF)] Initiatives 6b and 6c’’
(ADAMS Accession No. ML113260461).
Date of issuance: May 18, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 90 days.
Amendment No.: 256. A publiclyavailable version is in ADAMS under
Accession No. ML15103A059;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–20: Amendment revised the
Renewed Facility Operating License and
Technical Specifications
Date of initial notice in Federal
Register: September 2, 2014 (79 FR
52062).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 18, 2015.
No significant hazards consideration
comments received: No.
Exelon Generation Company, LLC
(EGC), Docket No. 50–410, Nine Mile
Point Nuclear Station, Unit 2, Oswego
County, New York
Date of amendment request:
November 17, 2014, as supplemented by
letter dated March 20, 2015.
Brief description of amendment: The
amendment revised the Nine Mile Point
Nuclear Station, Unit 2, Technical
Specification (TS) Allowable Value for
the Main Steam Line Tunnel Lead
Enclosure Temperature-High
instrumentation from an ambient
temperature dependent (variable
setpoint) to ambient temperature
independent (constant Allowable
Value). The changes deleted
Surveillance Requirement (SR) 3.3.6.1.2
and revise the Allowable Value for
Function 1.g on Table 3.3.6.1–1,
‘‘Primary Containment Isolation
Instrumentation.’’
Date of issuance: May 26, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 147. A publiclyavailable version is in ADAMS under
E:\FR\FM\09JNN1.SGM
09JNN1
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
Accession No. ML15110A008;
documents the Safety Evaluation related
to this amendment enclosed with the
amendment.
Renewed Facility Operating License
No. NPF–69: Amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: March 3, 2015 (80 FR 11476).
The supplemental letter dated March
20, 2015, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 26, 2015.
No significant hazards consideration
comments received: No.
tkelley on DSK3SPTVN1PROD with NOTICES
FirstEnergy Nuclear Operating
Company, et al., Docket No. 50–412,
Beaver Valley Power Station, Unit 2,
(BVPS–2) Beaver County, Pennsylvania
Date of amendment request: June 2,
2014, as supplemented by letter dated
August 8, 2014.
Description of amendment request:
The amendment changes the BVPS–2
technical specifications (TS).
Specifically, the amendment revised TS
4.3.2, ‘‘Drainage,’’ to correct the
minimum drain elevation for the spent
fuel storage pool specified in the TS. In
accordance with Title 10 of the Code of
Federal Regulations, Part 50, Appendix
B, Section XVI, ‘‘Corrective Action,’’ the
amendment was required to resolve a
TS discrepancy regarding an existing
plant design feature.
Date of Issuance: May 20, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 181. A publicly
available version is in ADAMS under
Accession No. ML15086A251.
Facility Operating License No. NPF–
73: Amendment revised the Facility
Operating License and Technical
Specifications.
Date of initial notice in Federal
Register: September 30, 2014 (79 FR
58816).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 20, 2015.
No significant hazards consideration
comments received: No.
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
FirstEnergy Nuclear Operating
Company, Docket No. 50–440, Perry
Nuclear Power Plant, Unit 1, Lake
County, Ohio
Date of application for amendment:
December 6, 2013, as supplemented by
letters dated February 27, July 22,
October 8, 2014, and February 4, 2015.
Brief description of amendment: The
amendment revises the Updated Safety
Analyses Report (USAR) to reflect
updated radiological dose calculations
based upon using an alternative source
term methodology for the applicable
design bases events and to revise the
technical specification (TS) definition of
DOSE EQUIVALENT IODINE–131.
Date of issuance: March 30, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 30 days.
Amendment No.: 166. A publiclyavailable version is in ADAMS under
Accession No. ML15075A139;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Facility Operating License No. NPF–
58: This amendment revised the TSs
and License.
Date of initial notice in Federal
Register: April 15, 2014 (79 FR 21298).
The July 22, October 8, 2014, and
February 4, 2015, supplements
contained clarifying information and
did not change the NRC staff’s initial
proposed finding of no significant
hazards condition.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated March 30, 2015.
No significant hazards consideration
comments received: No.
NextEra Energy Seabrook, LLC, Docket
No. 50–443, Seabrook Station, Unit 1,
Rockingham County, New Hampshire
Date of amendment request: January
30, 2012, as supplemented by letters
dated May 10, 2012, September 20,
2012, March 27, 2013, December 20,
2013, January 29, 2014, March 13, 2014,
and February 25, 2015.
Description of amendment request:
The original application proposed
revisions to the technical specifications
(TSs) for new and spent fuel storage as
a result of the new criticality analyses
for the new fuel vault (NFV) and spent
fuel pool (SFP). By letter dated
December 20, 2013 (ADAMS Accession
No. ML13360A045), NextEra requested
that the SFP and NFV be separated into
two separate license amendment
requests. This amendment revised the
TSs related to the NFV. On September
3, 2014, the U.S. Nuclear Regulatory
Commission issued Amendment No.
PO 00000
Frm 00110
Fmt 4703
Sfmt 4703
32633
142 that revised the TSs related to spent
fuel storage as a result of new criticality
analyses for the SFP.
Date of issuance: May 18, 2015.
Effective date: As of its date of
issuance, and shall be implemented
within 60 days.
Amendment No.: 148. A publiclyavailable version is in ADAMS under
Accession No. ML15118A632;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Facility Operating License No. NPF–
86: Amendment revised the Facility
Operating License and Technical
Specifications.
Date of initial notice in Federal
Register: August 14, 2012 (77 FR
48559). The supplemental letters dated
September 20, 2012, March 27, 2013,
December 20, 2013, January 29, 2014,
March 13, 2014, and February 25, 2015,
provided additional information that
clarified the application, did not expand
the scope of the application as originally
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 18, 2015.
No significant hazards consideration
comments received: No.
Northern States Power Company—
Minnesota, Docket Nos. 50–282 and 50–
306, Prairie Island Nuclear Generating
Plant, Units 1 and 2, Goodhue County,
Minnesota
Date of amendment request: June 9,
2014, as supplemented by letter dated
December 17, 2014.
Brief description of amendment: The
amendments revised Technical
Specification (TS) 3.8.1, ‘‘AC
[Alternating Current] Source—
Operating,’’ to revise the emergency
diesel generator steady-state voltage and
frequency limits specified in
Surveillance Requirement (SR) 3.8.1.2,
SR 3.8.1.6, and SR 3.8.1.9.
Date of issuance: May 21, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Unit 1—214; Unit
2—202. A publicly-available version is
in ADAMS under Accession No.
ML15086A046; documents related to
these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Renewed Facility Operating License
Nos. DPR–42 and DPR–60: These
amendments revised the Renewed
Facility Operating License and the
Technical Specifications.
E:\FR\FM\09JNN1.SGM
09JNN1
32634
Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices
Date of initial notice in Federal
Register: August 5, 2014 (79 FR 45479).
The supplement dated December 17,
2014, provided additional information
that clarified the application, did not
expand the scope of the application as
originally noticed, and did not change
the staff’s original proposed no
significant hazards consideration
determination as published in the
Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated May 21, 2015.
No significant hazards consideration
comments received: No.
tkelley on DSK3SPTVN1PROD with NOTICES
Northern States Power Company—
Minnesota, Docket Nos. 50–282 and 50–
306, Prairie Island Nuclear Generating
Plant, Units 1 and 2, Goodhue County,
Minnesota
Date of amendment requests:
February 20, 2013, as supplemented by
letters dated June 25, 2013; September
15, 2014; and February 26, 2015.
Brief description of amendments: The
amendments revised Technical
Specification (TS) 3.5.3, ‘‘ECCS
[Emergency Core Cooling Systems]—
Shutdown,’’ to remove Note 1 and
change the Mode Applicability to
eliminate the potential for nonconservative plant operation.
Date of issuance: May 20, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Unit 1—213; Unit
2—201. A publicly-available version is
in ADAMS under Accession No.
ML15062A013; documents related to
these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Renewed Facility Operating License
Nos. DPR–42 and DPR–60: These
amendments revised the Renewed
Facility Operating License and the
Technical Specifications.
Date of initial notice in Federal
Register: August 20, 2013 (78 FR
51229). The supplement dated
September 15, 2014, provided
additional information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register. The
Commission issued a revised no
significant hazards consideration on
March 17, 2015 (80 FR 13910), to
consider the aspects of the proposed
Mode Applicability change in the
February 26, 2015, supplemental letter.
The revised notice also included the
VerDate Sep<11>2014
17:12 Jun 08, 2015
Jkt 235001
correct initial submittal date of February
20, 2013.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated May 20, 2015.
No significant hazards consideration
comments received: No.
South Carolina Electric & Gas Company,
Docket Nos. 52–027 and 52–028, Virgil
C. Summer Nuclear Station, Units 2 and
3, Fairfield County, South Carolina
Date of amendment request: February
27, 2014, and supplemented by letter
dated August 21, 2014.
Description of amendment: The
amendment revises the Updated Final
Safety Analysis Report in regard to Tier
2 and Tier 2* information related to the
CA03 structural module, which is the
in-containment refueling water storage
tank (IRWST) west wall. The changes
sought to clarify the materials used in
fabrication of the module, as well as the
design details related to the horizontal
stiffeners used to support the IRWST,
and module legs used to anchor the
module in place.
Date of issuance: April 17, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 25. A publiclyavailable version is in ADAMS under
Accession No. ML15029A419;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Facility Combined Licenses No. NPF–
93 and NPF–94: Amendment revised the
Facility Combined Licenses.
Date of initial notice in Federal
Register: April 29, 2014 (79 FR 24024).
The supplemental letter dated August
21, 2014, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in the
Safety Evaluation dated April 17, 2015.
No significant hazards consideration
comments received: No.
Virginia Electric and Power Company,
Docket Nos. 50–338 and 50–339, North
Anna Power Station, Units 1 and 2,
Louisa County, Virginia
Date of amendment request: February
4, 2015.
Brief description of amendment: The
license amendments approve changes to
the Technical Specification (TS) TS
3.1.7, ‘‘Rod Position Indication,’’ to
provide an additional monitoring option
PO 00000
Frm 00111
Fmt 4703
Sfmt 9990
for an inoperable control rod position
indicator. Specifically, the proposed
changes would allow monitoring of
control rod drive mechanism stationary
gripper coil voltage every eight hours as
an alternative to using the movable in
core detectors every eight hours to
verify control rod position.
Date of issuance: May 14, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 30 days from the date of
issuance.
Amendment Nos.: 273 and 255. A
publicly-available version is in ADAMS
under Accession No. ML15083A436.
Documents related to the amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. NPF–4 and NPF–7: Amendments
changed the licenses and Technical
Specification.
Date of initial notice in Federal
Register: March 3, 2015 (80 FR 11488).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated May 14, 2015.
No significant hazards consideration
comments received: No.
ZionSolutions, LLC, Docket Nos. 50–295
and 50–304, Zion Nuclear Power
Station, Units 1 and 2, Lake County,
Illinois
Date of application for amendment:
May 27, 2014, as supplemented by letter
dated November 6, 2014.
Brief description of amendment: This
amendment revises the Zion Nuclear
Power Station Licenses to approve the
revised Emergency Plan.
Date of issuance: May 14, 2015.
Effective date: As of the date of
issuance and shall be implemented
within 60 days.
Amendment Nos.: 189 and 176.
Facility Operating License Nos. NPF–
39 and NPF–48: These amendments
revise the Licenses.
Date of initial notice in Federal
Register: July 22, 2014, (79 FR 42553).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated May 14, 2015.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 1st day
of June 2015.
For the Nuclear Regulatory Commission.
A. Louise Lund,
Acting Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2015–13815 Filed 6–8–15; 8:45 am]
BILLING CODE 7590–01–P
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 80, Number 110 (Tuesday, June 9, 2015)]
[Notices]
[Pages 32624-32634]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13815]
[[Page 32624]]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2015-0142]
Biweekly Notice: Applications and Amendments to Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Biweekly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to Section 189a. (2) of the Atomic Energy Act of
1954, as amended (the Act), the U.S. Nuclear Regulatory Commission
(NRC) is publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued from May 13, 2015 to May 27, 2015. The last
biweekly notice was published on May 26, 2015.
DATES: Comments must be filed by July 9, 2015. A request for a hearing
must be filed by August 10, 2015.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0142. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Shirley Rohrer, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-5411, email: Shirley.Rohrer@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2015-0142 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0142.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in the
SUPPLEMENTARY INFORMATION section.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2015-0142, facility name, unit
number(s), application date, and subject in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Sec. 50.92 of Title 10 of the Code of
Federal Regulations (10 CFR), this means that operation of the facility
in accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated, or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the
[[Page 32625]]
subject facility operating license or combined license. Requests for a
hearing and a petition for leave to intervene shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the NRC's PDR,
located at One White Flint North, Room O1-F21, 11555 Rockville Pike
(first floor), Rockville, Maryland 20852. The NRC's regulations are
accessible electronically from the NRC Library on the NRC's Web site at
https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a
hearing or petition for leave to intervene is filed by the above date,
the Commission or a presiding officer designated by the Commission or
by the Chief Administrative Judge of the Atomic Safety and Licensing
Board Panel, will rule on the request and/or petition; and the
Secretary or the Chief Administrative Judge of the Atomic Safety and
Licensing Board will issue a notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing.
The requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
requestor/petitioner intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment unless the
Commission finds an imminent danger to the health or safety of the
public, in which case it will issue an appropriate order or rule under
10 CFR part 2.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten 10 days prior to the filing deadline, the participant should
contact the Office of the Secretary by email at hearing.docket@nrc.gov,
or by telephone at 301-415-1677, to request (1) a digital
identification (ID) certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing
[[Page 32626]]
system. To be timely, an electronic filing must be submitted to the E-
Filing system no later than 11:59 p.m. Eastern Time on the due date.
Upon receipt of a transmission, the E-Filing system time-stamps the
document and sends the submitter an email notice confirming receipt of
the document. The E-Filing system also distributes an email notice that
provides access to the document to the NRC's Office of the General
Counsel and any others who have advised the Office of the Secretary
that they wish to participate in the proceeding, so that the filer need
not serve the documents on those participants separately. Therefore,
applicants and other participants (or their counsel or representative)
must apply for and receive a digital ID certificate before a hearing
request/petition to intervene is filed so that they can obtain access
to the document via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service. A presiding officer,
having granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a request to intervene will require
including information on local residence in order to demonstrate a
proximity assertion of interest in the proceeding. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 60-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i)-(iii).
For further details with respect to these license amendment
applications, see the application for amendment which is available for
public inspection in ADAMS and at the NRC's PDR. For additional
direction on accessing information related to this document, see the
``Obtaining Information and Submitting Comments'' section of this
document.
Dominion Nuclear Connecticut, Inc., (DNC), Docket No. 50-336, Millstone
Power Station, Unit 2 (MPS2), New London County, Connecticut
Date of amendment request: October 31, 2014. A publicly-available
version is in ADAMS under Accession No. ML14310A187.
Description of amendment request: The amendment would revise the
MPS2 Final Safety Analysis Report (FSAR) to allow the use of the
encoded ultrasonic examination technique in lieu of the FSAR committed
additional radiography examination for certain piping welds fabricated
to ANSI [American National Standards Institute] B31.1.0. The amendment
would also revise the MPS2 Facility Operating License No. DPR-65.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
Criterion 1:
Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
Previously evaluated accident consequences are not impacted by
the proposed amendment because credited mitigating equipment
continues to perform its design function. The proposed amendment
does not significantly impact the probability of an accident
previously evaluated because those Systems, Structures and
Components (SSCs) that can initiate an accident are not
significantly impacted.
Based on the above, DNC concludes that the proposed amendment to
the MPS2 FSAR to allow the use of UT [ultrasonic] in lieu of RT
[radiography] examination for certain piping welds fabricated to
ANSI B31.1.0, does not involve a significant increase in the
probability or consequences of an accident or transient previously
evaluated in the safety analysis report.
Criterion 2:
Does the proposed amendment create the possibility for a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed amendment does not create a new or different kind
of accident from any accident previously evaluated because
previously credited SSCs are not significantly impacted. The
proposed amendment does not involve a physical alteration of the
plant and no new or different types of equipment will be installed.
There is no impact upon the existing failure modes and effects
analysis; and conformance to the single failure criterion is
maintained.
Based on the above, DNC concludes that the proposed amendment to
the MPS2 FSAR to allow the use of UT in lieu of RT examination for
certain piping welds fabricated to ANSI B31.1.0, does not create the
possibility of a new or different kind of accident or transient from
any previously evaluated.
Criterion 3:
Does the proposed amendment involve a significant reduction in
the margin of safety?
Response: No.
The proposed amendment to the MPS2 FSAR will not cause an
accident to occur and will not result in any change in the operation
of the associated accident mitigation equipment. The proposed
amendment does not involve a significant reduction in margin of
safety because plant response to any transient or analyzed accident
event is unchanged.
[[Page 32627]]
Based on the above, DNC concludes the proposed amendment to the
MPS2 FSAR to allow the use of UT in lieu of RT examination for
certain piping welds fabricated to ANSI B31.1.0, does not involve a
significant reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lillian M. Cuoco, Senior Counsel, Dominion
Resources Services, Inc., 120 Tredegar Street, RS-2, Richmond, VA
23219.
Acting NRC Branch Chief: Michael I. Dudek.
Duke Energy Carolinas, LLC, Docket Nos. 50-369 and 50-370, McGuire
Nuclear Station, Units 1 and 2, Mecklenburg County, North Carolina
Date of amendment request: March 23, 2015. A publicly-available
version is in ADAMS under Accession No. ML15099A393.
Description of amendment request: The amendments would modify the
definition of RATED THERMAL POWER and delete a footnote that allowed
for stagered implementation of the previously approved Measurement
Uncertainty Recapture Power Uprate.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
Criterion 1:
Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
This LAR [license amendment request] proposes administrative
non-technical changes only. These proposed changes do not adversely
affect accident initiators or precursors nor alter the design
assumptions, conditions, or configurations of the facility. The
proposed changes do not alter or prevent the ability of structures,
systems[,] and components (SSCs) to perform their intended function
to mitigate the consequences of an initiating event witin the
assumed acceptance limits.
Given the above discussion, it is concluded the proposed
amendment does not significantly increase the probability or
consequences of an accident previously evaluated.
Criterion 2:
Does the proposed amendment create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The LAR proposes administrative non-technical changes only. The
proposed changes will not alter the design requirements of any SSC
or its function during accident conditions. No new or different
accidents result from the changes proposed. The changes do not
involve a physical alteration of the plant or any changes in methods
governing normal plant operation. The changes do not alter
assumptions made in the safety analysis.
Given the above discussion, it is concluded the proposed
amendment does not create the possibility of a new or different kind
of accident from any accident previously evaluated.
Criterion 3:
Does the proposed amendment involve a significant reduction in
the margin of safety?
Response: No.
This LAR proposes administrative non-technical changes only. The
proposed changes do not alter the manner in which safety limits,
limiting safety system settings or limiting conditions for operation
are determined. The safety analysis acceptance criteria are not
affected by these changes. The proposed changes will not result in
plant operation in a configuration outside the design basis. The
proposed changes do not adversely affect systems that respond to
safely shutdown the plant and to maintain the plant in a safe
shutdown condition.
Given the above discussion, it is concluded [that] the proposed
amendment does not involve a significant reduction in the margin of
safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c)
are satisfied. Therefore, the NRC staff proposes to determine that
the amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Associate General Counsel,
Duke Energy Corporation, 526 South Church Street--EC07H, Charlotte, NC
28202.
NRC Branch Chief: Robert J. Pascarelli.
NextEra Energy Point Beach, LLC, Docket Nos. 50-266 and 50-301, Point
Beach Nuclear Plant, Units 1 and 2, Town of Two Creeks, Manitowac
County, Wisconsin
Date of amendment request: March 27, 2015. A publicly-available
version is in ADAMS under Accession No. ML15086A378.
Description of amendment request: The proposed amendment would
modify the technical specifications (TS) requirements regarding steam
generator tube inspections and reporting as described in TS Task Force
(TSTF) traveler TSTF-510, Revision 2, ``Revision to Steam Generator
Program Inspection Frequencies and Tube Sample Selection.''
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is provided below:
1. Does the proposed change involve a significant increase in
the probability or consequences of any accident previously
evaluated?
Response: No.
The proposed change revises the Steam Generator (SG) Program to
modify the frequency of verification of SG tube integrity and SG
tube sample selection. A steam generator tube rupture (SGTR) event
is one of the design basis accidents that are analyzed as part of a
plant's licensing basis. The proposed SG tube inspection frequency
and sample selection criteria will continue to ensure that the SG
tubes are inspected such that the probability of a SGTR is not
increased. The consequences of a SGTR are bounded by the
conservative assumptions in the design basis accident analysis. The
proposed change will not cause the consequences of a SGTR to exceed
those assumptions.
Therefore, it is concluded that this change does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any previously evaluated?
Response: No.
The proposed changes to the Steam Generator Program will not
introduce any adverse changes to the plant design basis or
postulated accidents resulting from potential tube degradation. The
proposed change does not affect the design of the SGs or their
method of operation. In addition, the proposed change does not
impact any other plant system or component.
Therefore, it is concluded that this change does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a significant reduction in
the margin of safety?
Response: No.
The SG tubes in pressurized water reactors are an integral part
of the reactor coolant pressure boundary and, as such, are relied
upon to maintain the primary system's pressure and inventory. As
part of the reactor coolant pressure boundary, the SG tubes are
unique in that they are also relied upon as a heat transfer surface
between the primary and secondary systems such that residual heat
can be removed from the primary system. In addition, the SG tubes
also isolate the radioactive fission products in the primary coolant
from the secondary system. In summary, the safety function of a SG
is maintained by ensuring the integrity of its tubes.
Steam generator tube integrity is a function of the design,
environment, and the physical condition of the tube. The proposed
change does not affect tube design or operating environment. The
proposed change will continue to require monitoring of the physical
condition of the SG tubes such that there will not be a reduction in
the margin of safety compared to the current requirements.
[[Page 32628]]
Therefore, it is concluded that the proposed change does not
involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: William Blair, Managing Attorney--Nuclear,
Florida Power & Light Company, P.O. Box 14000, 700 Universe Boulevard,
Juno Beach, FL 33408-0420.
NRC Branch Chief: David L. Pelton.
Pacific Gas and Electric Company, Docket Nos. 50-275 and 50-323, Diablo
Canyon Nuclear Power Plant, Units 1 and 2, San Luis Obispo County,
California
Date of amendment request: April 16, 2015. A publicly-available
version is in ADAMS under Accession No. ML15107A333.
Description of amendment request: The amendments propose to revise
the Best Estimate Analyzer for the Core Operations-Nuclear (BEACON)
power distribution monitoring system methodology described in the
Updated Final Safety Analysis Report (UFSAR) Section 4.3.2.2, ``Power
Distribution,'' to the method described in the Westinghouse Electric
Company LLC proprietary topical report (TR) WCAP-12472-P-A, Addendum 4,
``BEACON Core Monitoring and Operation Support System.'' These
amendments also propose to revise Technical Specification (TS) 5.6.5,
``CORE OPERATING LIMITS REPORT (COLR),'' Section b to replace
Westinghouse proprietary TR WCAP-11596-P-A, ``Qualification of the
PHOENIX-P/ANC Nuclear Design System for Pressurized Water Reactor
Cores,'' with NRC-approved proprietary TR WCAP-16045-P-A,
``Qualification of the Two-Dimensional Transport Code PARAGON,'' and
NRC-approved proprietary TR WCAP-16045-P-A, Addendum 1-A,
``Qualification of the NEXUS Nuclear Data Methodology.''
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change would revise the Updated Final Safety
Analysis Report (UFSAR) to allow the use of the BEACON code
methodology contained in the NRC-approved WCAP-12472-P-A, Addendum
4, Revision 0, instead of the BEACON methodology contained in NRC-
approved WCAP-12472-P-A, Addendum 1-A. In addition, the proposed
change would revise Technical Specification (TS) 5.6.5, ``CORE
OPERATING LIMITS REPORT (COLR),'' Section b to replace WCAP-11596-P-
A, ``Qualification of the Phoenix-P/ANC Nuclear Design System for
Pressurized Water Reactor Cores,'' with NRC-approved WCAP-16045-P-A,
``Qualification of the Two-Dimensional Transport Code PARAGON,'' and
NRC-approved WCAP-16045-P-A, Addendum 1-A, ``Qualification of the
NEXUS Nuclear Data Methodology,'' in the list of NRC-approved
analytical limits used to determine core operating limits[,]
[s]pecifically the limit for refueling boron concentration (i.e.,
the shutdown margin) required by TS 3.9.1, ``Boron Concentration.''
The changes to the BEACON system and TS 5.6.5 core operating
limits methodologies, which this license amendment proposes, are
improvements over the current methodologies in use at the Diablo
Canyon Power Plant (DCPP). The NRC staff reviewed and approved these
methodologies and concluded that these analytical methods are
acceptable as a replacement for the current analytical methods. Thus
the BEACON system operation to perform power distribution
calculations and the core operating limits determined using the
proposed analytical methods will continue to assure that the plant
operates in a safe manner and, thus, the proposed changes do not
involve an increase in the probability of an accident.
The BEACON system power distribution calculations and the core
operating limits determined by use of the proposed new methodologies
will not increase the reactor power level or the core fission
product inventory, and will not change any transport assumptions or
the shutdown margin requirements of the TS. In addition, the
proposed changes will not alter any accident analyses assumptions
discussed in the UFSAR. As such, the DCPP will continue to operate
within the power distribution limits and shutdown margins required
by the plant TS and within the assumptions of the safety analyses
described in the UFSAR. As such, the proposed changes do not involve
a significant increase in the consequences of an accident.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different accident from any accident previously evaluated?
Response: No.
The proposed change involves the use of new and NRC-approved
methodologies used by the BEACON System to perform core power
distribution calculations and in TS 5.6.5, ``CORE OPERATING LIMITS
REPORT (COLR),'' to determine core operating limits (i.e., refueling
boron concentration or shutdown margin requirement).
The proposed change provides revised analytical methods for the
BEACON system and determining core operating limit for refueling
boron concentration, and does not change any system functions or
maintenance activities. The change does not involve physical
alteration of the plant, that is, no new or different type of
equipment will be installed. The change does not alter assumptions
made in the safety analyses and continues to assure the plant is
operated within safe limits. This change does not create new failure
modes or mechanisms that are not identifiable during testing, and no
new accident precursors are generated.
The BEACON system is not used to control the performance of any
plant equipment. The BEACON system core power distribution
calculations and core operating limits developed using the new
methodologies will be determined using NRC-approved methodologies,
and will remain consistent with all applicable plant safety analysis
limits addressed in the DCPP UFSAR and the shutdown margin
requirements of the TS. As such, use of the new BEACON and COLR
methodologies will not cause a new or different accident.
Therefore, the proposed change does not create the possibility
of a new or different accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The margin of safety is established through equipment design,
operating parameters, and the setpoints at which automatic actions
are initiated. The proposed changes do not physically alter safety-
related systems, nor does it affect the way in which safety related
systems perform their functions. The setpoints at which protective
actions are initiated are not altered by the proposed changes.
Therefore, sufficient equipment remains available to actuate upon
demand for the purpose of mitigating an analyzed event. The proposed
methodology changes are an improvement that will allow more accurate
modeling of core performance and determination of the required
refueling boron concentration. The NRC has reviewed and approved
these methodologies for their intended use in lieu of the current
methodologies; thus, the margin of safety is not reduced due to this
change.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment requests involve no significant hazards consideration.
Attorney for licensee: Jennifer Post, Esq., Pacific Gas and
Electric Company, P.O. Box 7442, San Francisco, California 94120.
NRC Branch Chief: Michael T. Markley.
[[Page 32629]]
Southern Nuclear Operating Company, Inc., Docket Nos. 52-025 and 52-
026, Vogtle Electric Generating Plant (VEGP) Units 3 and 4, Burke
County, Georgia
Date of amendment request: May 26, 2015. A publically-available
version is in ADAMS under Accession No. ML15146A444.
Description of amendment request: The proposed change would amend
Combined License Nos. NPF-91 and NPF-92 for the VEGP Units 3 and 4. The
requested amendment proposes to depart from Tier 2* and associated Tier
2 information in the VEGP Units 3 and 4 Updated Final Safety Analysis
Report (UFSAR) (which includes the plant specific Design Control
Document Tier 2 information) to revise the application of American
Institute for Steel Construction (AISC) N690-1994, Specification for
the Design, Fabrication and Erection of Steel Safety Related Structures
for Nuclear Facilities, to allow use of American Welding Society (AWS)
D1.1-2000, Structural Welding Code-Steel, in lieu of the AWS D1.1-1992
edition identified in AISC N690-1994.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The design functions of the nuclear island structures are to
provide support, protection, and separation for the seismic Category
I mechanical and electrical equipment located in the nuclear island.
The nuclear island structures are structurally designed to meet
seismic Category I requirements as defined in Regulatory Guide 1.29.
The design functions of the seismic Category II portions of the
annex building and turbine building are to provide integrity for
non-seismic items located in the proximity of safety-related items,
the failure of which during a safe shutdown earthquake could result
in loss of function of safety-related items.
The use of AWS D1.1-2000 provides criteria for the design,
qualification, fabrication, and inspection of welds for nuclear
island structures and seismic Category II portions of the annex
building and turbine building. These structures continue to meet the
applicable portions of ACI [American Concrete Institute] 349, the
remaining applicable portions of AISC N690 not related to
requirements for welding, including the supplemental requirements
described in UFSAR Subsections 3.8.4.4.1 and 3.8.4.5, and the
supplemental requirements identified in the UFSAR Subsection 3.8.3
for structural modules. The use of AWS D1.1-2000 does not have an
adverse impact on the response of the nuclear island structures, or
seismic Category II portions of the annex building and turbine
building to safe shutdown earthquake ground motions or loads due to
anticipated transients or postulated accident conditions. The change
does not impact the support, design, or operation of mechanical and
fluid systems. There is no change to plant systems or the response
of systems to postulated accident conditions. There is no change to
the predicted radioactive releases due to normal operation or
postulated accident conditions. The plant response to previously
evaluated accidents or external events is not adversely affected,
nor does the change described create any new accident precursors.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change includes the use of AWS D1.1-2000 to provide
criteria for the design, qualification, fabrication, and inspection
of welds for nuclear island structures and the seismic Category II
portions of the annex building and turbine building. The proposed
change provides a consistent set of requirements for welding of
structures required to be designed to the requirements of ACI 349
and AISC N690. The change to the details does not change the design
function, support, design, or operation of mechanical and fluid
systems. The change to the weld details does not result in a new
failure mechanism for the pertinent structures or new accident
precursors. As a result, the design function of the structures is
not adversely affected by the proposed change.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The AWS D1.1-2000 code is a consensus standard written, revised,
and approved by industry experts experienced in welding and weld
design. The proposed change adds AWS D1.1-2000 to the list of
applicable codes and standards in the UFSAR. The 2000 edition
includes criteria that consider directionality in the weld which
allows for an increase factor on structural fillet weld strength
relative to the angle of load direction. These changes are supported
by tests that provide the justification for criteria that consider
the directionality. The testing and analysis is reported in an AISC
Journal Article, ``Proposed Working Stresses for Fillet Welds in
Building Construction,'' by T. R. Higgins and FR Preece. These
changes can be similarly applied to welds in the AP1000 to continue
to provide the necessary safety margin. Therefore, the proposed
amendment does not involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP,
1710 Sixth Avenue North, Birmingham, AL 35203-2015.
NRC Branch Chief: Lawrence J. Burkhart.
Tennessee Valley Authority, Docket No. 50-259, Browns Ferry Nuclear
Plant, Unit 1, Limestone County, Alabama
Date of amendment request: March 9, 2015. A publicly-available
version is in ADAMS under Accession No. ML15111A396.
Description of amendment request: The amendment would revise the
Technical Specifications (TS) Section 3.1.4, ``Control Rod Scram
Times,'' based on industry Technical Specifications Task Force (TSTF)
Change Traveler TSTF-460-A, Revision 0, that has been approved (August
23, 2004; 69 FR 51864) generically for the boiling water reactor (BWR)
Standard Technical Specifications, NUREG-1433 (BWR/4). The required
frequency of Surveillance Requirement 3.1.4.2 regarding control rod
scram time testing will be changed from ``120 days cumulative operation
in MODE 1'' to ``200 days cumulative operation in MODE 1.'' The 200-day
frequency is based on operating experience that has shown control rod
scram times do not significantly change over an operating cycle.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration (NSHC) by adopting the NSHC that the NRC published on
August 23, 2004 (69 FR 51854), which is presented below:
1. Does the change involve a significant increase in the
probability or consequences of an accident previously evaluated?
Response: No.
The proposed change extends the frequency for testing control
rod scram time testing from every 120 days of cumulative Mode 1
operation to 200 days of cumulative Mode 1 operation. The frequency
of surveillance testing is not an initiator of any accident
previously evaluated. The frequency of surveillance testing does not
affect the ability to mitigate any accident previously evaluated, as
the tested component is still required to be operable.
Therefore, the proposed change does not involve a significant
increase in the
[[Page 32630]]
probability or consequences of an accident previously evaluated.
2. Does the change create the possibility of a new or different
kind of accident from any accident previously evaluated?
Response: No.
The proposed change extends the frequency for testing control
rod scram time testing from every 120 days of cumulative Mode 1
operation to 200 days of cumulative Mode 1 operation. The proposed
change does not result in any new or different modes of plant
operation.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change extends the frequency for testing control
rod scram time testing from every 120 days of cumulative Mode 1
operation to 200 days of cumulative Mode 1 operation. The proposed
change continues to test the control rod scram time to ensure the
assumptions in the safety analysis are protected.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
its own analysis, determines that the three standards of 10 CFR
50.92(c) are satisfied. Therefore, the NRC staff proposes to determine
that the amendment request involves no significant hazards
consideration.
Attorney for licensee: General Counsel, Tennessee Valley Authority,
400 West Summit Hill Drive, 6A West Tower, Knoxville, TN 37902.
NRC Branch Chief: Shana R. Helton.
Union Electric Company, Docket No. 50-483, Callaway Plant, Unit 1,
Callaway County, Missouri
Date of amendment request: March 12, 2015. A publicly-available
version is in ADAMS under Accession No. ML15071A403.
Description of amendment request: The proposed amendment would
modify Technical Specification (TS) requirements in order to address
NRC Generic Letter 2008-01, ``Managing Gas Accumulation in Emergency
Core Cooling, Decay Heat Removal, and Containment Spray Systems,''
dated January 11, 2008 (ADAMS Accession No. ML072910759), as described
in TS Task Force (TSTF) traveler TSTF-523-A, Revision 2, ``Generic
Letter 2008-01, Managing Gas Accumulation'' (ADAMS Accession No.
ML13053A075).
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises or adds Surveillance Requirements
(SRs) that require verification that the Emergency Core Cooling
System (ECCS), the Residual Heat Removal (RHR) System, and the
Containment Spray (CS) System, are not rendered inoperable due to
accumulated gas and to provide allowances that permit performance of
the verification. Gas accumulation in the subject systems is not an
initiator of any accident previously evaluated. As a result, the
probability of any accident previously evaluated is not
significantly increased. The proposed SRs ensure that the subject
systems continue to be capable to perform their assumed safety
function and are not rendered inoperable due to gas accumulation.
Thus, the consequences of any accident previously evaluated are not
significantly increased.
Based on the above, the proposed change does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change revises or adds SRs that require
verification that the ECCS, the RHR System, and the CS System are
not rendered inoperable due to accumulated gas and to provide
allowances that permit performance of the revised verification. The
proposed change does not involve a physical alteration of the plant
(i.e., no new or different type of equipment will be installed) or a
change in the methods governing normal plant operation. In addition,
the proposed change does not impose any new or different
requirements that could initiate an accident. The proposed change
does not alter assumptions made in the safety analysis and is
consistent with the safety analysis assumptions.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change revises or adds SRs that require
verification that the ECCS, the RHR System, and the CS System are
not rendered inoperable due to accumulated gas and to provide
allowances which permit performance of the revised verification. The
proposed change adds new requirements to manage gas accumulation in
order to ensure the subject systems are capable of performing their
assumed safety functions. The proposed SRs are more comprehensive
than the current SRs and will ensure that the assumptions of the
safety analysis are protected. The proposed change does not
adversely affect any current plant safety margins or the reliability
of the equipment assumed in the safety analysis. Therefore, there
are no changes being made to any safety analysis assumptions, safety
limits, or limiting safety system settings that would adversely
affect plant safety as a result of the proposed change.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: John O'Neill, Esq., Pillsbury Winthrop Shaw
Pittman LLP, 2300 N Street NW., Washington, DC 20037.
NRC Branch Chief: Michael T. Markley.
Union Electric Company, Docket No. 50-483, Callaway Plant, Unit 1,
Callaway County, Missouri
Date of amendment request: March 9, 2015, as supplemented by letter
dated April 8, 2015. Publicly-available versions are in ADAMS under
Accession Nos. ML15068A422 and ML15098A575.
Description of amendment request: The proposed amendment would
modify Technical Specification (TS) requirements regarding steam
generator tube inspections and reporting as described in TS Task Force
(TSTF) traveler TSTF-510, Revision 2, ``Revision to Steam Generator
Program Inspection Frequencies and Tube Sample Selection'' (ADAMS
Accession No. ML110610350), with some minor administrative differences.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises the Steam Generator (SG) Program to
modify the frequency of verification of SG tube integrity and SG
tube sample selection. A steam generator tube rupture (SGTR) event
is one of the design basis accidents that are analyzed as part of
the plant's licensing basis. The proposed SG tube inspection
frequency and sample selection criteria will continue to ensure that
the SG tubes are inspected such that the probability of [an] SGTR is
not increased. The consequences of [an] SGTR are bounded by the
conservative assumptions in the design basis accident analysis. The
proposed change will not cause the
[[Page 32631]]
consequences of [an] SGTR to exceed those assumptions.
Therefore, it is concluded that this change does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes to the Steam Generator Program will not
introduce any adverse changes to the plant design basis or
postulated accidents resulting from potential tube degradation. The
proposed change does not affect the design of the SGs or their
method of operation. In addition, the proposed change does not
impact any other plant system or component.
Therefore, it is concluded that this change does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The SG tubes in pressurized water reactors are an integral part
of the reactor coolant pressure boundary and, as such, are relied
upon to maintain the primary system's pressure and inventory. As
part of the reactor coolant pressure boundary, the SG tubes are
unique in that they are also relied upon as a heat transfer surface
between the primary and secondary systems such that residual heat
can be removed from the primary system. In addition, the SG tubes
also isolate the radioactive fission products in the primary coolant
from the secondary system. These safety functions are maintained by
ensuring integrity of the SG tubes.
Steam generator tube integrity is a function of the design,
environment, and the physical condition of the tube. The proposed
change does not affect tube design or operating environment. The
proposed change will continue to require monitoring of the physical
condition of the SG tubes such that there will not be a reduction in
the margin of safety compared to the current requirements.
Therefore, it is concluded that the proposed change does not
involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee' analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: John O'Neill, Esq., Pillsbury Winthrop Shaw
Pittman LLP, 2300 N Street, NW., Washington, DC 20037.
NRC Branch Chief: Michael T. Markley.
III. Notice of Issuance of Amendments to Facility Operating Licenses
and Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR Chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed no
significant hazards consideration determination, and opportunity for a
hearing in connection with these actions, was published in the Federal
Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental Assessment as
indicated. All of these items can be accessed as described in the
``Obtaining Information and Submitting Comments'' section of this
document.
Dominion Nuclear Connecticut, Inc., Docket No. 50-336, Millstone Power
Station, Unit 2 (MPS2), New London County, Connecticut
Date of amendment request: April 11, 2014.
Brief description of amendment: The amendment revised the Technical
Specifications (TSs), adding topical report BAW-10240(P)(A),
``Incorporation of M5TM Properties in Framatome ANP Approved
Methods,'' to the referenced analytical methods in TS 6.9.1.8.b, ``Core
Operating Limits Report,'' as an acceptable method used to determine
core operating limits for MPS2.
Date of issuance: May 18, 2015.
Effective date: As of the date of issuance and shall be implemented
within 60 days from the date of issuance.
Amendment No.: 319. A publicly-available version is in ADAMS under
Accession No. ML15093A441; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-65: Amendment revised
the Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: November 25, 2014 (79
FR 70212).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 18, 2015.
No significant hazards consideration comments received: No.
Dominion Nuclear Connecticut, Inc., Docket No. 50-336, Millstone Power
Station, Unit 2, New London County, Connecticut
Date of amendment request: March 28, 2014.
Brief description of amendment: The proposed amendment deletes the
Technical Specification (TS) Index and makes several other editorial,
corrective and minor changes to the TSs.
Date of issuance: May 20, 2015.
Effective date: As of the date of issuance and shall be implemented
within 30 days from the date of issuance.
Amendment No.: 320. A publicly-available version is in ADAMS under
Accession No. ML14093A027; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-65: Amendment revised
the Renewed Operating License and TSs.
Date of initial notice in Federal Register: November 25, 2014 (79
FR 70212).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 20, 2015.
No significant hazards consideration comments received: No.
Dominion Nuclear Connecticut, Inc., Docket No. 50-423, Millstone Power
Station, Unit 3, New London County, Connecticut
Date of amendment request: March 28, 2014.
Brief description of amendment: The amendment deleted the Technical
Specification (TS) index and made other editorial, corrective, and
minor changes to the TSs.
[[Page 32632]]
Date of issuance: May 20, 2015.
Effective date: As of the date of issuance and shall be implemented
within 30 days from the date of issuance.
Amendment No.: 261. A publicly-available version is in ADAMS under
Accession No. ML15098A034; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. NPF-49: Amendment revised
the Renewed Operating License and TSs.
Date of initial notice in Federal Register: November 25, 2014 (79
FR 70213).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 20, 2015.
No significant hazards consideration comments received: No.
Duke Energy Progress, Inc., Docket No. 50-261, H. B. Robinson Steam
Electric Plant Unit 2, Darlington County, South Carolina
Date of application for amendment: June 7, 2013, as supplemented by
letter dated July 24, 2014.
Brief description of amendment: The amendment revised the Technical
Specifications (TSs) by deleting Surveillance Requirements (SRs)
3.1.7.1, 3.1.7.2, and 3.1.7.3 of TS 3.1.7, ``Rod Position Indication,''
and renumbering SR 3.1.7.4 as SR 3.1.7.1.
Date of issuance: May 27, 2015.
Effective date: As of the date of issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 241. A publicly-available version is in ADAMS under
Accession No. ML15068A386; documents related to this amendment are
listed in the Safety Evaluation (SE) enclosed with the amendment.
Renewed Facility Operating License No. DPR-23: Amendment revised
the Facility Operating License and TSs.
Date of initial notice in Federal Register: August 20, 2013 (78 FR
51222). The supplemental letter dated July 24, 2014, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a SE dated May 27, 2015.
No significant hazards consideration comments received: No.
Duke Energy Progress, Inc., Docket No. 50-261, H. B. Robinson Steam
Electric Plant Unit 2, Hartsville, South Carolina
Date of amendment request: June 20, 2014.
Brief description of amendment: The amendment revised Technical
Specification (TS) 5.5.9 for the Steam Generator Program accident-
induced leakage rate value for any design-basis accident, other than a
steam generator tube rupture.
Date of issuance: May 26, 2015.
Effective date: As of the date of issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 240. A publicly-available version is in ADAMS under
Accession No. ML15062A343; documents related to this amendment are
listed in the Safety Evaluation (SE) enclosed with the amendment.
Renewed Facility Operating License No. DPR-23: Amendment revised
the Facility Operating License and TSs.
Date of initial notice in Federal Register: September 16, 2014 (79
FR 55510).
The Commission's related evaluation of the amendment is contained
in an SE dated May 26, 2015.
No significant hazards consideration comments received: No.
Entergy Nuclear Operations, Inc., Docket Nos. 50-247 and 50-286, Indian
Point Nuclear Generating Units 2 and 3, Westchester County, New York
Date of amendment request: April 1, 2014.
Brief description of amendments: The amendments revised the
technical specifications (TSs) by implementing Technical Specification
Task Force Technical Change Traveler 510, Revision 2, ``Revision to
Steam Generator Program Inspection Frequencies and Tube Sample
Selection.''
Date of issuance: May 26, 2015.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 281 and 257. A publicly-available version is in
ADAMS under Accession No. ML15110A009; documents related to these
amendments are listed in the safety evaluation (SE) enclosed with the
amendments.
Facility Operating License Nos. DPR-26 and DPR-64: Amendments
revised the facility operating license and TSs.
Date of initial notice in Federal Register: July 8, 2014 (79 FR
38588).
The Commission's related evaluation of the amendment is contained
in an SE dated May 26, 2015.
No significant hazards consideration comments received: No.
Entergy Nuclear Operations, Inc., Docket No. 50-255, Palisades Nuclear
Plant (PNP), Van Buren County, Michigan
Date of application for amendment: June 11, 2014.
Brief description of amendment: The amendment modified PNP
technical specifications (TSs) to adopt the changes described in TS
Task Force (TSTF) traveler TSTF-426, Revision 5, ``Revise or Add
Actions to Preclude Entry into [Limiting Condition for Operation (LCO)]
3.0.3--[Risk-Informed TSTF (RITSTF)] Initiatives 6b and 6c'' (ADAMS
Accession No. ML113260461).
Date of issuance: May 18, 2015.
Effective date: As of the date of issuance and shall be implemented
within 90 days.
Amendment No.: 256. A publicly-available version is in ADAMS under
Accession No. ML15103A059; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-20: Amendment revised
the Renewed Facility Operating License and Technical Specifications
Date of initial notice in Federal Register: September 2, 2014 (79
FR 52062).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 18, 2015.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC (EGC), Docket No. 50-410, Nine Mile
Point Nuclear Station, Unit 2, Oswego County, New York
Date of amendment request: November 17, 2014, as supplemented by
letter dated March 20, 2015.
Brief description of amendment: The amendment revised the Nine Mile
Point Nuclear Station, Unit 2, Technical Specification (TS) Allowable
Value for the Main Steam Line Tunnel Lead Enclosure Temperature-High
instrumentation from an ambient temperature dependent (variable
setpoint) to ambient temperature independent (constant Allowable
Value). The changes deleted Surveillance Requirement (SR) 3.3.6.1.2 and
revise the Allowable Value for Function 1.g on Table 3.3.6.1-1,
``Primary Containment Isolation Instrumentation.''
Date of issuance: May 26, 2015.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 147. A publicly-available version is in ADAMS under
[[Page 32633]]
Accession No. ML15110A008; documents the Safety Evaluation related to
this amendment enclosed with the amendment.
Renewed Facility Operating License No. NPF-69: Amendment revised
the Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: March 3, 2015 (80 FR
11476). The supplemental letter dated March 20, 2015, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 26, 2015.
No significant hazards consideration comments received: No.
FirstEnergy Nuclear Operating Company, et al., Docket No. 50-412,
Beaver Valley Power Station, Unit 2, (BVPS-2) Beaver County,
Pennsylvania
Date of amendment request: June 2, 2014, as supplemented by letter
dated August 8, 2014.
Description of amendment request: The amendment changes the BVPS-2
technical specifications (TS). Specifically, the amendment revised TS
4.3.2, ``Drainage,'' to correct the minimum drain elevation for the
spent fuel storage pool specified in the TS. In accordance with Title
10 of the Code of Federal Regulations, Part 50, Appendix B, Section
XVI, ``Corrective Action,'' the amendment was required to resolve a TS
discrepancy regarding an existing plant design feature.
Date of Issuance: May 20, 2015.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 181. A publicly available version is in ADAMS under
Accession No. ML15086A251.
Facility Operating License No. NPF-73: Amendment revised the
Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: September 30, 2014 (79
FR 58816).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 20, 2015.
No significant hazards consideration comments received: No.
FirstEnergy Nuclear Operating Company, Docket No. 50-440, Perry Nuclear
Power Plant, Unit 1, Lake County, Ohio
Date of application for amendment: December 6, 2013, as
supplemented by letters dated February 27, July 22, October 8, 2014,
and February 4, 2015.
Brief description of amendment: The amendment revises the Updated
Safety Analyses Report (USAR) to reflect updated radiological dose
calculations based upon using an alternative source term methodology
for the applicable design bases events and to revise the technical
specification (TS) definition of DOSE EQUIVALENT IODINE-131.
Date of issuance: March 30, 2015.
Effective date: As of the date of issuance and shall be implemented
within 30 days.
Amendment No.: 166. A publicly-available version is in ADAMS under
Accession No. ML15075A139; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. NPF-58: This amendment revised the
TSs and License.
Date of initial notice in Federal Register: April 15, 2014 (79 FR
21298). The July 22, October 8, 2014, and February 4, 2015, supplements
contained clarifying information and did not change the NRC staff's
initial proposed finding of no significant hazards condition.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated March 30, 2015.
No significant hazards consideration comments received: No.
NextEra Energy Seabrook, LLC, Docket No. 50-443, Seabrook Station, Unit
1, Rockingham County, New Hampshire
Date of amendment request: January 30, 2012, as supplemented by
letters dated May 10, 2012, September 20, 2012, March 27, 2013,
December 20, 2013, January 29, 2014, March 13, 2014, and February 25,
2015.
Description of amendment request: The original application proposed
revisions to the technical specifications (TSs) for new and spent fuel
storage as a result of the new criticality analyses for the new fuel
vault (NFV) and spent fuel pool (SFP). By letter dated December 20,
2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP
and NFV be separated into two separate license amendment requests. This
amendment revised the TSs related to the NFV. On September 3, 2014, the
U.S. Nuclear Regulatory Commission issued Amendment No. 142 that
revised the TSs related to spent fuel storage as a result of new
criticality analyses for the SFP.
Date of issuance: May 18, 2015.
Effective date: As of its date of issuance, and shall be
implemented within 60 days.
Amendment No.: 148. A publicly-available version is in ADAMS under
Accession No. ML15118A632; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. NPF-86: Amendment revised the
Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: August 14, 2012 (77 FR
48559). The supplemental letters dated September 20, 2012, March 27,
2013, December 20, 2013, January 29, 2014, March 13, 2014, and February
25, 2015, provided additional information that clarified the
application, did not expand the scope of the application as originally
noticed, and did not change the staff's original proposed no
significant hazards consideration determination as published in the
Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 18, 2015.
No significant hazards consideration comments received: No.
Northern States Power Company--Minnesota, Docket Nos. 50-282 and 50-
306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue
County, Minnesota
Date of amendment request: June 9, 2014, as supplemented by letter
dated December 17, 2014.
Brief description of amendment: The amendments revised Technical
Specification (TS) 3.8.1, ``AC [Alternating Current] Source--
Operating,'' to revise the emergency diesel generator steady-state
voltage and frequency limits specified in Surveillance Requirement (SR)
3.8.1.2, SR 3.8.1.6, and SR 3.8.1.9.
Date of issuance: May 21, 2015.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Unit 1--214; Unit 2--202. A publicly-available
version is in ADAMS under Accession No. ML15086A046; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Renewed Facility Operating License Nos. DPR-42 and DPR-60: These
amendments revised the Renewed Facility Operating License and the
Technical Specifications.
[[Page 32634]]
Date of initial notice in Federal Register: August 5, 2014 (79 FR
45479). The supplement dated December 17, 2014, provided additional
information that clarified the application, did not expand the scope of
the application as originally noticed, and did not change the staff's
original proposed no significant hazards consideration determination as
published in the Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated May 21, 2015.
No significant hazards consideration comments received: No.
Northern States Power Company--Minnesota, Docket Nos. 50-282 and 50-
306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue
County, Minnesota
Date of amendment requests: February 20, 2013, as supplemented by
letters dated June 25, 2013; September 15, 2014; and February 26, 2015.
Brief description of amendments: The amendments revised Technical
Specification (TS) 3.5.3, ``ECCS [Emergency Core Cooling Systems]--
Shutdown,'' to remove Note 1 and change the Mode Applicability to
eliminate the potential for non-conservative plant operation.
Date of issuance: May 20, 2015.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Unit 1--213; Unit 2--201. A publicly-available
version is in ADAMS under Accession No. ML15062A013; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Renewed Facility Operating License Nos. DPR-42 and DPR-60: These
amendments revised the Renewed Facility Operating License and the
Technical Specifications.
Date of initial notice in Federal Register: August 20, 2013 (78 FR
51229). The supplement dated September 15, 2014, provided additional
information that clarified the application, did not expand the scope of
the application as originally noticed, and did not change the staff's
original proposed no significant hazards consideration determination as
published in the Federal Register. The Commission issued a revised no
significant hazards consideration on March 17, 2015 (80 FR 13910), to
consider the aspects of the proposed Mode Applicability change in the
February 26, 2015, supplemental letter. The revised notice also
included the correct initial submittal date of February 20, 2013.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated May 20, 2015.
No significant hazards consideration comments received: No.
South Carolina Electric & Gas Company, Docket Nos. 52-027 and 52-028,
Virgil C. Summer Nuclear Station, Units 2 and 3, Fairfield County,
South Carolina
Date of amendment request: February 27, 2014, and supplemented by
letter dated August 21, 2014.
Description of amendment: The amendment revises the Updated Final
Safety Analysis Report in regard to Tier 2 and Tier 2* information
related to the CA03 structural module, which is the in-containment
refueling water storage tank (IRWST) west wall. The changes sought to
clarify the materials used in fabrication of the module, as well as the
design details related to the horizontal stiffeners used to support the
IRWST, and module legs used to anchor the module in place.
Date of issuance: April 17, 2015.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 25. A publicly-available version is in ADAMS under
Accession No. ML15029A419; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Facility Combined Licenses No. NPF-93 and NPF-94: Amendment revised
the Facility Combined Licenses.
Date of initial notice in Federal Register: April 29, 2014 (79 FR
24024). The supplemental letter dated August 21, 2014, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in the Safety Evaluation dated April 17, 2015.
No significant hazards consideration comments received: No.
Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339,
North Anna Power Station, Units 1 and 2, Louisa County, Virginia
Date of amendment request: February 4, 2015.
Brief description of amendment: The license amendments approve
changes to the Technical Specification (TS) TS 3.1.7, ``Rod Position
Indication,'' to provide an additional monitoring option for an
inoperable control rod position indicator. Specifically, the proposed
changes would allow monitoring of control rod drive mechanism
stationary gripper coil voltage every eight hours as an alternative to
using the movable in core detectors every eight hours to verify control
rod position.
Date of issuance: May 14, 2015.
Effective date: As of the date of issuance and shall be implemented
within 30 days from the date of issuance.
Amendment Nos.: 273 and 255. A publicly-available version is in
ADAMS under Accession No. ML15083A436. Documents related to the
amendments are listed in the Safety Evaluation enclosed with the
amendments.
Renewed Facility Operating License Nos. NPF-4 and NPF-7: Amendments
changed the licenses and Technical Specification.
Date of initial notice in Federal Register: March 3, 2015 (80 FR
11488).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated May 14, 2015.
No significant hazards consideration comments received: No.
ZionSolutions, LLC, Docket Nos. 50-295 and 50-304, Zion Nuclear Power
Station, Units 1 and 2, Lake County, Illinois
Date of application for amendment: May 27, 2014, as supplemented by
letter dated November 6, 2014.
Brief description of amendment: This amendment revises the Zion
Nuclear Power Station Licenses to approve the revised Emergency Plan.
Date of issuance: May 14, 2015.
Effective date: As of the date of issuance and shall be implemented
within 60 days.
Amendment Nos.: 189 and 176.
Facility Operating License Nos. NPF-39 and NPF-48: These amendments
revise the Licenses.
Date of initial notice in Federal Register: July 22, 2014, (79 FR
42553).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated May 14, 2015.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 1st day of June 2015.
For the Nuclear Regulatory Commission.
A. Louise Lund,
Acting Director, Division of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. 2015-13815 Filed 6-8-15; 8:45 am]
BILLING CODE 7590-01-P