Virgil C. Summer Nuclear Station, Units 2 and 3, 32413-32416 [2015-13940]
Download as PDF
Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices
This meeting will be held by
teleconference. Please refer to the
National Science Board Web site for
additional information and schedule
updates (time, place, subject matter or
status of meeting), which may be found
at https://www.nsf.gov/nsb/notices/.
Point of contact for this meeting is
Jacqueline Meszaros (jmeszaro@nsf.gov).
Ann Bushmiller,
Senior Counsel to the National Science Board.
[FR Doc. 2015–14008 Filed 6–4–15; 11:15 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
I. Obtaining Information and
Submitting Comments
[Docket Nos. 052–00027 and 052–00028;
NRC–2008–0441]
Virgil C. Summer Nuclear Station,
Units 2 and 3
Nuclear Regulatory
Commission.
ACTION: License amendment application;
opportunity to comment, request a
hearing, and petition for leave to
intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Combined
Licenses (NPF–93 and NPF–94), issued
to South Carolina Electric and Gas
(SCE&G) and South Carolina Public
Service Authority (Santee Cooper) (the
licensee), for construction and operation
of the Virgil C. Summer Nuclear Station
(VCSNS), Units 2 and 3 located in
Fairfield County, South Carolina.
The proposed amendment departs
from to Tier 2* and associated Tier 2
information in the VCSNS Units 2 and
3 Updated Final Safety Analysis Report
(UFSAR) (which includes the plant
specific Design Control Document Tier
2 information) to revise the application
of welding codes.
DATES: Submit comments by July 8,
2015. Requests for a hearing or petition
for leave to intervene must be filed by
August 7, 2015.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0441. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:09 Jun 05, 2015
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Denise McGovern, Office of New
Reactors, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
000; telephone: 301–415–0681; email:
Denise.Mcgovern@nrc.gov.
SUPPLEMENTARY INFORMATION:
Jkt 235001
A. Obtaining Information
Please refer to Docket ID NRC–2008–
0441 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0441.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
application for amendment, dated May
26, 2015, is available in ADAMS under
Accession No. ML15146A455.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2008–
0441 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
32413
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Introduction
The NRC is considering issuance of an
amendment to Facility Operating
License Nos. NPF–93 and NPF–94,
issued to SCE&G and Santee Cooper for
operation of the Virgil C. Summer
Nuclear Station Units 2 and 3, located
in Fairfield County, South Carolina.
The proposed amendment departs
from Tier 2* and associated Tier 2
information in the VCSNS Units 2 and
3 UFSAR (which includes the plant
specific Design Control Document Tier
2 information) to revise the application
of American Institute for Steel
Construction (AISC) N690–1994,
Specification for the Design, Fabrication
and Erection of Steel Safety Related
Structures for Nuclear Facilities, to
allow use of American Welding Society
(AWS) D1.1–2000, Structural Welding
Code-Steel, in lieu of the AWS D1.1–
1992 edition identified in AISC N690–
1994.
Before any issuance of the proposed
license amendment, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and NRC’s regulations.
The NRC has made a proposed
determination that the license
amendment request involves no
significant hazards consideration. Under
the NRC’s regulations in § 50.92 of Title
10 of the Code of Federal Regulations
(10 CFR), this means that operation of
the facility in accordance with the
proposed amendment would not (1)
involve a significant increase in the
probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
E:\FR\FM\08JNN1.SGM
08JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
32414
Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices
The design functions of the nuclear island
structures are to provide support, protection,
and separation for the seismic Category I
mechanical and electrical equipment located
in the nuclear island. The nuclear island
structures are structurally designed to meet
seismic Category I requirements as defined in
Regulatory Guide 1.29. The design functions
of the seismic Category II portions of the
annex building and turbine building are to
provide integrity for non-seismic items
located in the proximity of safety-related
items, the failure of which during a safe
shutdown earthquake could result in loss of
function of safety-related items.
The use of AWS D1.1–2000 provides
criteria for the design, qualification,
fabrication, and inspection of welds for
nuclear island structures and seismic
Category II portions of the annex building
and turbine building. These structures
continue to meet the applicable portions of
ACI 349, the remaining applicable portions of
AISC N690 not related to requirements for
welding, including the supplemental
requirements described in UFSAR
Subsections 3.8.4.4.1 and 3.8.4.5, and the
supplemental requirements identified in the
UFSAR Subsection 3.8.3 for structural
modules. The use of AWS D1.1–2000 does
not have an adverse impact on the response
of the nuclear island structures, or seismic
Category II portions of the annex building
and turbine building to safe shutdown
earthquake ground motions or loads due to
anticipated transients or postulated accident
conditions. The change does not impact the
support, design, or operation of mechanical
and fluid systems. There is no change to
plant systems or the response of systems to
postulated accident conditions. There is no
change to the predicted radioactive releases
due to normal operation or postulated
accident conditions. The plant response to
previously evaluated accidents or external
events is not adversely affected, nor does the
change described create any new accident
precursors.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change includes the use of
AWS D1.1–2000 to provide criteria for the
design, qualification, fabrication, and
inspection of welds for nuclear island
structures and the seismic Category II
portions of the annex building and turbine
building. The proposed change provides a
consistent set of requirements for welding of
structures required to be designed to the
requirements of ACI 349 and AISC N690. The
change to the details does not change the
design function, support, design, or operation
of mechanical and fluid systems. The change
to the weld details does not result in a new
failure mechanism for the pertinent
structures or new accident precursors. As a
result, the design function of the structures
is not adversely affected by the proposed
change.
VerDate Sep<11>2014
17:09 Jun 05, 2015
Jkt 235001
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The AWS D1.1–2000 code is a consensus
standard written, revised, and approved by
industry experts experienced in welding and
weld design. The proposed change adds
AWS D1.1–2000 to the list of applicable
codes and standards in the UFSAR. The 2000
edition includes criteria that consider
directionality in the weld which allows for
an increase factor on structural fillet weld
strength relative to the angle of load
direction. These changes are supported by
tests that provide the justification for criteria
that consider the directionality. These
changes can be similarly applied to welds in
the AP1000 to continue to provide the
necessary safety margin.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
Therefore, the proposed changes do
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the license
amendment request involves a No
Significant Hazards Consideration.
The NRC is seeking public comments
on this proposed determination that the
license amendment request involves no
significant hazards consideration. Any
comments received within 30 days after
the date of publication of this notice
will be considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day notice period if the Commission
concludes the amendment involves no
significant hazards consideration. In
addition, the Commission may issue the
amendment prior to the expiration of
the 30-day comment period should
circumstances change during the 30-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. Should the Commission take
action prior to the expiration of either
the comment period or the notice
period, it will publish in the Federal
Register a notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
the need to take this action will occur
very infrequently.
III. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this Federal Register
notice, any person whose interest may
be affected by this proceeding and who
desires to participate as a party in the
proceeding must file a written request
for hearing or a petition for leave to
intervene specifying the contentions
which the person seeks to have litigated
in the hearing with respect to the
license amendment request. Requests
for hearing and petitions for leave to
intervene shall be filed in accordance
with the NRC’s ‘‘Agency Rules of
Practice and Procedure’’ in 10 CFR part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the NRC’s PDR. The NRC’s
regulations are accessible electronically
from the NRC Library on the NRC’s Web
site at https://www.nrc.gov/reading-rm/
doc-collections/cfr/.
As required by 10 CFR 2.309, a
request for hearing or petition for leave
to intervene must set forth with
particularity the interest of the
petitioner in the proceeding and how
that interest may be affected by the
results of the proceeding. The hearing
request or petition must specifically
explain the reasons why intervention
should be permitted, with particular
reference to the following general
requirements: (1) The name, address,
and telephone number of the requestor
or petitioner; (2) the nature of the
requestor’s/petitioner’s right under the
Act to be made a party to the
proceeding; (3) the nature and extent of
the requestor’s/petitioner’s property,
financial, or other interest in the
proceeding; and (4) the possible effect of
any decision or order which may be
entered in the proceeding on the
requestor’s/petitioner’s interest. The
hearing request or petition must also
include the specific contentions that the
requestor/petitioner seeks to have
litigated at the proceeding.
For each contention, the requestor/
petitioner must provide a specific
statement of the issue of law or fact to
be raised or controverted, as well as a
brief explanation of the basis for the
contention. Additionally, the requestor/
petitioner must demonstrate that the
issue raised by each contention is
within the scope of the proceeding and
is material to the findings that the NRC
must make to support the granting of a
license amendment in response to the
application. The hearing request or
petition must also include a concise
statement of the alleged facts or expert
E:\FR\FM\08JNN1.SGM
08JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices
opinion that support the contention and
on which the requestor/petitioner
intends to rely at the hearing, together
with references to those specific sources
and documents. The hearing request or
petition must provide sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact, including
references to specific portions of the
application for amendment that the
petitioner disputes and the supporting
reasons for each dispute. If the
requestor/petitioner believes that the
application for amendment fails to
contain information on a relevant matter
as required by law, the requestor/
petitioner must identify each failure and
the supporting reasons for the
requestor’s/petitioner’s belief. Each
contention must be one which, if
proven, would entitle the requestor/
petitioner to relief. A requestor/
petitioner who does not satisfy these
requirements for at least one contention
will not be permitted to participate as a
party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing with respect to resolution of
that person’s admitted contentions,
including the opportunity to present
evidence and to submit a crossexamination plan for cross-examination
of witnesses, consistent with NRC
regulations, policies, and procedures.
The Atomic Safety and Licensing Board
will set the time and place for any
prehearing conferences and evidentiary
hearings, and the appropriate notices
will be provided.
Hearing requests or petitions for leave
to intervene must be filed no later than
60 days from the date of publication of
this notice. Requests for hearing,
petitions for leave to intervene, and
motions for leave to file new or
amended contentions that are filed after
the 60-day deadline will not be
entertained absent a determination by
the presiding officer that the filing
demonstrates good cause by satisfying
the three factors in 10 CFR
2.309(c)(1)(i)–(iii).
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
VerDate Sep<11>2014
17:09 Jun 05, 2015
Jkt 235001
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment unless the Commission
finds an imminent danger to the health
or safety of the public, in which case it
will issue an appropriate order or rule
under 10 CFR part 2.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC’s E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/e-
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
32415
submittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC’s public Web site
at https://www.nrc.gov/site-help/esubmittals.html A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Meta System Help Desk through
the ‘‘Contact Us’’ link located on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-
E:\FR\FM\08JNN1.SGM
08JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
32416
Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices
free call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, in some
instances, a request to intervene will
require including information on local
residence in order to demonstrate a
proximity assertion of interest in the
proceeding. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
For further details with respect to this
action, see the application for license
amendment dated May 26, 2015.
VerDate Sep<11>2014
17:09 Jun 05, 2015
Jkt 235001
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius LLC,
1111 Pennsylvania Avenue NW.,
Washington, DC 20004–2514.
NRC Branch Chief: Denise L.
McGovern
Dated at Rockville, Maryland, this 1st day
of June 2015.
For the Nuclear Regulatory Commission.
Denise L. McGovern,
Acting Branch Chief, Licensing Branch 4,
Division of New Reactor Licensing, Office of
New Reactors.
[FR Doc. 2015–13940 Filed 6–5–15; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–302; License No. DPR–72;
NRC–2011–0024]
In the Matter of Duke Energy Florida,
Inc.; Crystal River Unit 3 Nuclear
Generating Plant
Nuclear Regulatory
Commission.
ACTION: Direct transfer of license; order.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing an order to
Duke Energy Florida, Inc. (DEF),
approving the direct transfer of Facility
Operating License No. DPR–72 for
Crystal River Unit 3 Nuclear Generating
Plant (CR–3), to the extent held by eight
minority co-owners to DEF. The eight
minority co-owners, all municipalities
or utilities in the State of Florida, are as
follows: The City of Alachua, City of
Bushnell, City of Gainesville, City of
Kissimmee, City of Leesburg, City of
New Smyrna Beach and Utilities
Commission/City of New Smyrna
Beach, City of Ocala, and Orlando
Utilities Commission/City of Orlando
(the eight minority co-owners,
collectively). The direct license transfer
does not involve Seminole Electric
Cooperative, Inc., the remaining coowner of CR–3. A conforming license
amendment will remove reference to the
eight minority co-owners in the license.
The CR–3 facility is permanently shut
down and defueled and the application
proposed no physical changes to the
facility or operational changes. DEF and
Seminole Electric Corporation, Inc., will
be joint owners of CR–3 and DEF will
be the operator of the facility. This
Order is effective upon issuance.
DATES: The Order was issued on May
29, 2015, and is effective for one year.
ADDRESSES: Please refer to Docket ID
NRC–2011–0024 when contacting the
NRC about the availability of
information regarding this document.
SUMMARY:
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2011–0024. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Michael D. Orenak, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
3229; email: Michael.Orenak@nrc.gov.
SUPPLEMENTARY INFORMATION: The text of
the Order is attached.
Dated at Rockville, Maryland this 29th day
of May, 2015.
For The Nuclear Regulatory Commission.
Meena K. Khanna,
Chief, Plant Licensing IV–2 and
Decommissioning Transition Branch,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
Attachment—Order Approving
Transfer of License and Conforming
Amendment
United States of America
Nuclear Regulatory Commission
In the Matter of Duke Energy Florida, Inc.;
Crystal River Unit 3 Nuclear Generating
Plant, Docket No. 50–302, License No. DPR–
72, Order Approving Transfer of License and
Conforming Amendment.
I.
Duke Energy Florida, Inc. (DEF or the
applicant), City of Alachua, City of
Bushnell, City of Gainesville, City of
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Notices]
[Pages 32413-32416]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13940]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 052-00027 and 052-00028; NRC-2008-0441]
Virgil C. Summer Nuclear Station, Units 2 and 3
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to comment, request
a hearing, and petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Combined Licenses (NPF-93 and NPF-94),
issued to South Carolina Electric and Gas (SCE&G) and South Carolina
Public Service Authority (Santee Cooper) (the licensee), for
construction and operation of the Virgil C. Summer Nuclear Station
(VCSNS), Units 2 and 3 located in Fairfield County, South Carolina.
The proposed amendment departs from to Tier 2* and associated Tier
2 information in the VCSNS Units 2 and 3 Updated Final Safety Analysis
Report (UFSAR) (which includes the plant specific Design Control
Document Tier 2 information) to revise the application of welding
codes.
DATES: Submit comments by July 8, 2015. Requests for a hearing or
petition for leave to intervene must be filed by August 7, 2015.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0441. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Denise McGovern, Office of New
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-000;
telephone: 301-415-0681; email: Denise.Mcgovern@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2008-0441 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0441.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
application for amendment, dated May 26, 2015, is available in ADAMS
under Accession No. ML15146A455.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2008-0441 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Introduction
The NRC is considering issuance of an amendment to Facility
Operating License Nos. NPF-93 and NPF-94, issued to SCE&G and Santee
Cooper for operation of the Virgil C. Summer Nuclear Station Units 2
and 3, located in Fairfield County, South Carolina.
The proposed amendment departs from Tier 2* and associated Tier 2
information in the VCSNS Units 2 and 3 UFSAR (which includes the plant
specific Design Control Document Tier 2 information) to revise the
application of American Institute for Steel Construction (AISC) N690-
1994, Specification for the Design, Fabrication and Erection of Steel
Safety Related Structures for Nuclear Facilities, to allow use of
American Welding Society (AWS) D1.1-2000, Structural Welding Code-
Steel, in lieu of the AWS D1.1-1992 edition identified in AISC N690-
1994.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in Sec. 50.92 of Title 10 of the Code of Federal
Regulations (10 CFR), this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
[[Page 32414]]
The design functions of the nuclear island structures are to
provide support, protection, and separation for the seismic Category
I mechanical and electrical equipment located in the nuclear island.
The nuclear island structures are structurally designed to meet
seismic Category I requirements as defined in Regulatory Guide 1.29.
The design functions of the seismic Category II portions of the
annex building and turbine building are to provide integrity for
non-seismic items located in the proximity of safety-related items,
the failure of which during a safe shutdown earthquake could result
in loss of function of safety-related items.
The use of AWS D1.1-2000 provides criteria for the design,
qualification, fabrication, and inspection of welds for nuclear
island structures and seismic Category II portions of the annex
building and turbine building. These structures continue to meet the
applicable portions of ACI 349, the remaining applicable portions of
AISC N690 not related to requirements for welding, including the
supplemental requirements described in UFSAR Subsections 3.8.4.4.1
and 3.8.4.5, and the supplemental requirements identified in the
UFSAR Subsection 3.8.3 for structural modules. The use of AWS D1.1-
2000 does not have an adverse impact on the response of the nuclear
island structures, or seismic Category II portions of the annex
building and turbine building to safe shutdown earthquake ground
motions or loads due to anticipated transients or postulated
accident conditions. The change does not impact the support, design,
or operation of mechanical and fluid systems. There is no change to
plant systems or the response of systems to postulated accident
conditions. There is no change to the predicted radioactive releases
due to normal operation or postulated accident conditions. The plant
response to previously evaluated accidents or external events is not
adversely affected, nor does the change described create any new
accident precursors.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change includes the use of AWS D1.1-2000 to provide
criteria for the design, qualification, fabrication, and inspection
of welds for nuclear island structures and the seismic Category II
portions of the annex building and turbine building. The proposed
change provides a consistent set of requirements for welding of
structures required to be designed to the requirements of ACI 349
and AISC N690. The change to the details does not change the design
function, support, design, or operation of mechanical and fluid
systems. The change to the weld details does not result in a new
failure mechanism for the pertinent structures or new accident
precursors. As a result, the design function of the structures is
not adversely affected by the proposed change.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The AWS D1.1-2000 code is a consensus standard written, revised,
and approved by industry experts experienced in welding and weld
design. The proposed change adds AWS D1.1-2000 to the list of
applicable codes and standards in the UFSAR. The 2000 edition
includes criteria that consider directionality in the weld which
allows for an increase factor on structural fillet weld strength
relative to the angle of load direction. These changes are supported
by tests that provide the justification for criteria that consider
the directionality. These changes can be similarly applied to welds
in the AP1000 to continue to provide the necessary safety margin.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves a No Significant Hazards
Consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period should circumstances change during the 30-day comment period
such that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. Should the Commission take action
prior to the expiration of either the comment period or the notice
period, it will publish in the Federal Register a notice of issuance.
Should the Commission make a final No Significant Hazards Consideration
Determination, any hearing will take place after issuance. The
Commission expects that the need to take this action will occur very
infrequently.
III. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this Federal
Register notice, any person whose interest may be affected by this
proceeding and who desires to participate as a party in the proceeding
must file a written request for hearing or a petition for leave to
intervene specifying the contentions which the person seeks to have
litigated in the hearing with respect to the license amendment request.
Requests for hearing and petitions for leave to intervene shall be
filed in accordance with the NRC's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the NRC's PDR. The
NRC's regulations are accessible electronically from the NRC Library on
the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/.
As required by 10 CFR 2.309, a request for hearing or petition for
leave to intervene must set forth with particularity the interest of
the petitioner in the proceeding and how that interest may be affected
by the results of the proceeding. The hearing request or petition must
specifically explain the reasons why intervention should be permitted,
with particular reference to the following general requirements: (1)
The name, address, and telephone number of the requestor or petitioner;
(2) the nature of the requestor's/petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
requestor's/petitioner's property, financial, or other interest in the
proceeding; and (4) the possible effect of any decision or order which
may be entered in the proceeding on the requestor's/petitioner's
interest. The hearing request or petition must also include the
specific contentions that the requestor/petitioner seeks to have
litigated at the proceeding.
For each contention, the requestor/petitioner must provide a
specific statement of the issue of law or fact to be raised or
controverted, as well as a brief explanation of the basis for the
contention. Additionally, the requestor/petitioner must demonstrate
that the issue raised by each contention is within the scope of the
proceeding and is material to the findings that the NRC must make to
support the granting of a license amendment in response to the
application. The hearing request or petition must also include a
concise statement of the alleged facts or expert
[[Page 32415]]
opinion that support the contention and on which the requestor/
petitioner intends to rely at the hearing, together with references to
those specific sources and documents. The hearing request or petition
must provide sufficient information to show that a genuine dispute
exists with the applicant on a material issue of law or fact, including
references to specific portions of the application for amendment that
the petitioner disputes and the supporting reasons for each dispute. If
the requestor/petitioner believes that the application for amendment
fails to contain information on a relevant matter as required by law,
the requestor/petitioner must identify each failure and the supporting
reasons for the requestor's/petitioner's belief. Each contention must
be one which, if proven, would entitle the requestor/petitioner to
relief. A requestor/petitioner who does not satisfy these requirements
for at least one contention will not be permitted to participate as a
party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions, including the opportunity to present evidence and to
submit a cross-examination plan for cross-examination of witnesses,
consistent with NRC regulations, policies, and procedures. The Atomic
Safety and Licensing Board will set the time and place for any
prehearing conferences and evidentiary hearings, and the appropriate
notices will be provided.
Hearing requests or petitions for leave to intervene must be filed
no later than 60 days from the date of publication of this notice.
Requests for hearing, petitions for leave to intervene, and motions for
leave to file new or amended contentions that are filed after the 60-
day deadline will not be entertained absent a determination by the
presiding officer that the filing demonstrates good cause by satisfying
the three factors in 10 CFR 2.309(c)(1)(i)-(iii).
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment unless the
Commission finds an imminent danger to the health or safety of the
public, in which case it will issue an appropriate order or rule under
10 CFR part 2.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten 10 days prior to the filing deadline, the participant should
contact the Office of the Secretary by email at hearing.docket@nrc.gov,
or by telephone at 301-415-1677, to request (1) a digital
identification (ID) certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-
[[Page 32416]]
free call at 1-866-672-7640. The NRC Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday,
excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service. A presiding officer,
having granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a request to intervene will require
including information on local residence in order to demonstrate a
proximity assertion of interest in the proceeding. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
For further details with respect to this action, see the
application for license amendment dated May 26, 2015.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius LLC, 1111 Pennsylvania Avenue NW., Washington, DC 20004-2514.
NRC Branch Chief: Denise L. McGovern
Dated at Rockville, Maryland, this 1st day of June 2015.
For the Nuclear Regulatory Commission.
Denise L. McGovern,
Acting Branch Chief, Licensing Branch 4, Division of New Reactor
Licensing, Office of New Reactors.
[FR Doc. 2015-13940 Filed 6-5-15; 8:45 am]
BILLING CODE 7590-01-P