Northwest Medical Isotopes, LLC; Construction Permit Application, 32418-32419 [2015-13937]
Download as PDF
32418
Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices
White Flint North, 11555 Rockville
Pike, Room O–1 F21 (First Floor),
Rockville, Maryland and accessible
electronically though the ADAMS
Public Electronic Reading Room on the
Internet at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
reference staff by telephone at 1–800–
397–4209, 301–415–4737, or by email at
pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 29th day
of May 2015.
For The Nuclear Regulatory Commission.
William M. Dean,
Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2015–13939 Filed 6–5–15; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–609; NRC–2013–0235]
Northwest Medical Isotopes, LLC;
Construction Permit Application
Nuclear Regulatory
Commission.
ACTION: Construction permit
application; docketing.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that the partial application for a
construction permit, submitted by
Northwest Medical Isotopes, LLC
(NWMI) is acceptable for docketing. The
NWMI proposes to build a medical
radioisotope production facility located
in Columbia, Missouri.
DATES: June 8, 2015.
ADDRESSES: Please refer to Docket ID
NRC–2013–0235 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0235. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:09 Jun 05, 2015
Jkt 235001
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Michael Balazik, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
2856; email: Michael.Balazik@nrc.gov.
SUPPLEMENTARY INFORMATION: On
November 7, 2014, NWMI filed with the
NRC, pursuant to Section 103 of the
Atomic Energy Act of 1954, as amended,
and part 50 of Title 10 of the Code of
Federal Regulations (10 CFR), a portion
of an application for a construction
permit for a medical radioisotope
production facility in Columbia,
Missouri. By letter dated February 5,
2015 (ADAMS Accession No.
ML15086A262), NWMI withdrew and
resubmitted this portion of its
construction permit application
(ADAMS Accession No. ML15086A261)
to include a discussion of connected
actions in its environmental report in
response to a January 23, 2015, letter
from the NRC (ADAMS Accession No.
ML14349A501). A notice of receipt of
this application was previously
published in the Federal Register on
April 21, 2015 (80 FR 22227).
An exemption from certain
requirements of 10 CFR 2.101(a)(5)
granted by the Commission on October
7, 2013, and published in the Federal
Register on October 24, 2013 (78 FR
63501), in response to a letter from
NWMI dated August 9, 2013 (ADAMS
Accession No. ML13227A295), allowed
for NWMI to submit its construction
permit application in two parts.
Specifically, the exemption allowed
NWMI to submit a portion of its
application for a construction permit up
to six months prior to the remainder of
the application regardless of whether or
not an environmental impact statement
or a supplement to an environmental
impact statement was prepared during
the review of its application. On
February 5, 2015, in accordance with 10
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
CFR 2.101(a)(5), NWMI submitted the
following in part one of the construction
permit application (ADAMS Accession
No. ML15086A261):
• The description and safety
assessment of the site required by 10
CFR 50.34(a)(1),
• the environmental report required
by 10 CFR 50.30(f),
• the filing fee information required
by 10 CFR 50.30(e) and 10 CFR 170.21,
• the general information required by
10 CFR 50.33; and
• the agreement limiting access to
classified information required by 10
CFR 50.37.
The NRC staff has determined that
NWMI has submitted the information
listed above in accordance with 10 CFR
2.101(a)(5) and that the partial
application is acceptable for docketing.
The docket number established for the
NWMI facility is 50–609.
The NRC staff will perform a detailed
technical review of the partial
construction permit application.
Docketing of the partial construction
permit application does not preclude
the NRC from requesting additional
information from the applicant as the
review proceeds, nor does it predict
whether the Commission will grant or
deny the application. The NRC staff will
also perform an acceptance review of
the second and final part of the
construction permit application when it
is tendered. As stated in NWMI’s
February 5, 2015, letter, the second and
final part of NWMI’s application for a
construction permit will contain the
remainder of the preliminary safety
analysis report required by 10 CFR
50.34(a) and will be submitted in
accordance with the requirements of 10
CFR 2.101(a)(5). If, after completion of
the acceptance review of the full
construction permit application, the full
construction permit application is found
acceptable for docketing, the
Commission or a designated Atomic
Safety and Licensing Board will conduct
a hearing in accordance with Subpart L,
‘‘Simplified Hearing Procedures for NRC
Adjudications,’’ of 10 CFR part 2 and
the Advisory Committee on Reactor
Safeguards will prepare a report on the
construction permit application
consistent with 10 CFR 50.58, ‘‘Hearings
and report of the Advisory Committee
on Reactor Safeguards.’’ The
Commission will announce in a future
Federal Register notice, the opportunity
to petition for leave to intervene in the
hearing required for this application by
10 CFR 50.58, as well as the time and
place of the hearing. If the Commission
finds that the full construction permit
application meets the applicable
standards of the Atomic Energy Act and
E:\FR\FM\08JNN1.SGM
08JNN1
Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices
the Commission’s regulations, and that
required notifications to other agencies
and bodies have been made, the
Commission will issue a construction
permit, in the form and containing
conditions and limitations that the
Commission finds appropriate and
necessary.
Pursuant to 10 CFR part 51, the NRC
staff will conduct an environmental
review of the construction permit before
recommending Commission action on
the application. The NRC staff will
determine in accordance with 10 CFR
51.25, whether it will prepare an
environmental impact statement or an
environmental assessment to inform the
decision on the construction permit
application and will publish a Federal
Register notice concerning its
environmental review.
Dated at Rockville, Maryland, this 29th day
of May 2015.
For the Nuclear Regulatory Commission.
Alexander Adams, Jr.,
Chief, Research and Test Reactors Licensing
Branch, Division of Policy and Rulemaking,
Office of Nuclear Reactor Regulation.
[FR Doc. 2015–13937 Filed 6–5–15; 8:45 am]
POSTAL SERVICE
Product Change—Priority Mail
Negotiated Service Agreement
Postal ServiceTM.
Notice.
AGENCY:
ACTION:
The Postal Service gives
notice of filing a request with the Postal
Regulatory Commission to add a
domestic shipping services contract to
the list of Negotiated Service
Agreements in the Mail Classification
Schedule’s Competitive Products List.
DATES: Effective date: June 8, 2015.
FOR FURTHER INFORMATION CONTACT:
Elizabeth A. Reed, 202–268–3179.
SUPPLEMENTARY INFORMATION: The
United States Postal Service® hereby
gives notice that, pursuant to 39 U.S.C.
3642 and 3632(b)(3), on May 29, 2015,
it filed with the Postal Regulatory
Commission a Request of the United
States Postal Service to Add Priority
Mail Contract 123 to Competitive
Product List. Documents are available at
www.prc.gov, Docket Nos. MC2015–52,
CP2015–80.
SUMMARY:
Stanley F. Mires,
Attorney, Federal Compliance.
BILLING CODE 7590–01–P
[FR Doc. 2015–13877 Filed 6–5–15; 8:45 am]
BILLING CODE 7710–12–P
POSTAL SERVICE
PRESIDIO TRUST
Product Change—Priority Mail
Negotiated Service Agreement
Notice of Public Meeting of Presidio
Institute Advisory Council
Postal ServiceTM.
ACTION: Notice.
AGENCY:
The Presidio Trust.
Notice of public meeting of
Presidio Institute Advisory Council.
AGENCY:
ACTION:
The Postal Service gives
notice of filing a request with the Postal
Regulatory Commission to add a
domestic shipping services contract to
the list of Negotiated Service
Agreements in the Mail Classification
Schedule’s Competitive Products List.
DATES: Effective date: June 8, 2015.
FOR FURTHER INFORMATION CONTACT:
Elizabeth A. Reed, 202–268–3179.
SUPPLEMENTARY INFORMATION: The
United States Postal Service® hereby
gives notice that, pursuant to 39 U.S.C.
3642 and 3632(b)(3), on May 29, 2015,
it filed with the Postal Regulatory
Commission a Request of the United
States Postal Service to Add Priority
Mail Contract 124 to Competitive
Product List. Documents are available at
www.prc.gov, Docket Nos. MC2015–53,
CP2015–81.
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
Stanley F. Mires,
Attorney, Federal Compliance.
[FR Doc. 2015–13879 Filed 6–5–15; 8:45 am]
BILLING CODE 7710–12–P
VerDate Sep<11>2014
17:09 Jun 05, 2015
Jkt 235001
Pursuant to the Federal
Advisory Committee Act, as amended (5
U.S.C. Appendix 2), notice is hereby
given that a public meeting of the
Presidio Institute Advisory Council
(Council) will be held from 9:00 a.m. to
12:00 p.m. on Tuesday, June 30, 2015.
The meeting is open to the public, and
oral public comment will be received at
the meeting. The Council was formed to
advise the Executive Director of the
Presidio Trust (Trust) on matters
pertaining to the rehabilitation and
reuse of Fort Winfield Scott as a new
national center focused on service and
leadership development.
SUPPLEMENTARY INFORMATION: The
Trust’s Executive Director, in
consultation with the Chair of the Board
of Directors, has determined that the
Council is in the public interest and
supports the Trust in performing its
duties and responsibilities under the
Presidio Trust Act, 16 U.S.C. 460bb
appendix.
SUMMARY:
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
32419
The Council will advise on the
establishment of a new national center
(Presidio Institute) focused on service
and leadership development, with
specific emphasis on: (a) Assessing the
role and key opportunities of a national
center dedicated to service and
leadership at Fort Scott in the Presidio
of San Francisco; (b) providing
recommendations related to the Presidio
Institute’s programmatic goals, target
audiences, content, implementation and
evaluation; (c) providing guidance on a
phased development approach that
leverages a combination of funding
sources including philanthropy; and (d)
making recommendations on how to
structure the Presidio Institute’s
business model to best achieve the
Presidio Institute’s mission and ensure
long-term financial self-sufficiency.
Meeting Agenda: This meeting of the
Council will feature a presentation by
Fellows from the Presidio Institute
Cross Sector Leaders Fellowship
program. Updates will be provided on
programs and input will be sought on
potential audiences and program
participants. The period from 11:30 a.m.
to 12:00 p.m. will be reserved for public
comments.
Public Comment: Individuals who
would like to offer comments are
invited to sign-up at the meeting and
speaking times will be assigned on a
first-come, first-served basis. Written
comments may be submitted on cards
that will be provided at the meeting, via
mail to Aimee Vincent, Presidio
Institute, 1201 Ralston Avenue, San
Francisco, CA 94129–0052, or via email
to institute@presidiotrust.gov. If
individuals submitting written
comments request that their address or
other contact information be withheld
from public disclosure, it will be
honored to the extent allowable by law.
Such requests must be stated
prominently at the beginning of the
comments. The Trust will make
available for public inspection all
submissions from organizations or
businesses and from persons identifying
themselves as representatives or
officials of organizations and
businesses.
Time: The meeting will be held from
9:00 a.m. to 12:00 p.m. on Tuesday, June
30, 2015.
Location: The meeting will be held at
the Presidio Institute, Building 1202
Ralston Avenue, San Francisco, CA
94129.
FOR FURTHER INFORMATION CONTACT:
Additional information is available
online at https://www.presidio.gov/
explore/Pages/fort-scott-council.aspx.
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Notices]
[Pages 32418-32419]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13937]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-609; NRC-2013-0235]
Northwest Medical Isotopes, LLC; Construction Permit Application
AGENCY: Nuclear Regulatory Commission.
ACTION: Construction permit application; docketing.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that the partial application for a construction permit,
submitted by Northwest Medical Isotopes, LLC (NWMI) is acceptable for
docketing. The NWMI proposes to build a medical radioisotope production
facility located in Columbia, Missouri.
DATES: June 8, 2015.
ADDRESSES: Please refer to Docket ID NRC-2013-0235 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0235. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced in this document
(if that document is available in ADAMS) is provided the first time
that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Michael Balazik, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-2856; email: Michael.Balazik@nrc.gov.
SUPPLEMENTARY INFORMATION: On November 7, 2014, NWMI filed with the
NRC, pursuant to Section 103 of the Atomic Energy Act of 1954, as
amended, and part 50 of Title 10 of the Code of Federal Regulations (10
CFR), a portion of an application for a construction permit for a
medical radioisotope production facility in Columbia, Missouri. By
letter dated February 5, 2015 (ADAMS Accession No. ML15086A262), NWMI
withdrew and resubmitted this portion of its construction permit
application (ADAMS Accession No. ML15086A261) to include a discussion
of connected actions in its environmental report in response to a
January 23, 2015, letter from the NRC (ADAMS Accession No.
ML14349A501). A notice of receipt of this application was previously
published in the Federal Register on April 21, 2015 (80 FR 22227).
An exemption from certain requirements of 10 CFR 2.101(a)(5)
granted by the Commission on October 7, 2013, and published in the
Federal Register on October 24, 2013 (78 FR 63501), in response to a
letter from NWMI dated August 9, 2013 (ADAMS Accession No.
ML13227A295), allowed for NWMI to submit its construction permit
application in two parts. Specifically, the exemption allowed NWMI to
submit a portion of its application for a construction permit up to six
months prior to the remainder of the application regardless of whether
or not an environmental impact statement or a supplement to an
environmental impact statement was prepared during the review of its
application. On February 5, 2015, in accordance with 10 CFR
2.101(a)(5), NWMI submitted the following in part one of the
construction permit application (ADAMS Accession No. ML15086A261):
The description and safety assessment of the site required
by 10 CFR 50.34(a)(1),
the environmental report required by 10 CFR 50.30(f),
the filing fee information required by 10 CFR 50.30(e) and
10 CFR 170.21,
the general information required by 10 CFR 50.33; and
the agreement limiting access to classified information
required by 10 CFR 50.37.
The NRC staff has determined that NWMI has submitted the
information listed above in accordance with 10 CFR 2.101(a)(5) and that
the partial application is acceptable for docketing. The docket number
established for the NWMI facility is 50-609.
The NRC staff will perform a detailed technical review of the
partial construction permit application. Docketing of the partial
construction permit application does not preclude the NRC from
requesting additional information from the applicant as the review
proceeds, nor does it predict whether the Commission will grant or deny
the application. The NRC staff will also perform an acceptance review
of the second and final part of the construction permit application
when it is tendered. As stated in NWMI's February 5, 2015, letter, the
second and final part of NWMI's application for a construction permit
will contain the remainder of the preliminary safety analysis report
required by 10 CFR 50.34(a) and will be submitted in accordance with
the requirements of 10 CFR 2.101(a)(5). If, after completion of the
acceptance review of the full construction permit application, the full
construction permit application is found acceptable for docketing, the
Commission or a designated Atomic Safety and Licensing Board will
conduct a hearing in accordance with Subpart L, ``Simplified Hearing
Procedures for NRC Adjudications,'' of 10 CFR part 2 and the Advisory
Committee on Reactor Safeguards will prepare a report on the
construction permit application consistent with 10 CFR 50.58,
``Hearings and report of the Advisory Committee on Reactor
Safeguards.'' The Commission will announce in a future Federal Register
notice, the opportunity to petition for leave to intervene in the
hearing required for this application by 10 CFR 50.58, as well as the
time and place of the hearing. If the Commission finds that the full
construction permit application meets the applicable standards of the
Atomic Energy Act and
[[Page 32419]]
the Commission's regulations, and that required notifications to other
agencies and bodies have been made, the Commission will issue a
construction permit, in the form and containing conditions and
limitations that the Commission finds appropriate and necessary.
Pursuant to 10 CFR part 51, the NRC staff will conduct an
environmental review of the construction permit before recommending
Commission action on the application. The NRC staff will determine in
accordance with 10 CFR 51.25, whether it will prepare an environmental
impact statement or an environmental assessment to inform the decision
on the construction permit application and will publish a Federal
Register notice concerning its environmental review.
Dated at Rockville, Maryland, this 29th day of May 2015.
For the Nuclear Regulatory Commission.
Alexander Adams, Jr.,
Chief, Research and Test Reactors Licensing Branch, Division of Policy
and Rulemaking, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-13937 Filed 6-5-15; 8:45 am]
BILLING CODE 7590-01-P