Northwest Medical Isotopes, LLC; Construction Permit Application, 32418-32419 [2015-13937]

Download as PDF 32418 Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices White Flint North, 11555 Rockville Pike, Room O–1 F21 (First Floor), Rockville, Maryland and accessible electronically though the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, https:// www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR reference staff by telephone at 1–800– 397–4209, 301–415–4737, or by email at pdr.resource@nrc.gov. Dated at Rockville, Maryland, this 29th day of May 2015. For The Nuclear Regulatory Commission. William M. Dean, Director, Office of Nuclear Reactor Regulation. [FR Doc. 2015–13939 Filed 6–5–15; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 50–609; NRC–2013–0235] Northwest Medical Isotopes, LLC; Construction Permit Application Nuclear Regulatory Commission. ACTION: Construction permit application; docketing. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the partial application for a construction permit, submitted by Northwest Medical Isotopes, LLC (NWMI) is acceptable for docketing. The NWMI proposes to build a medical radioisotope production facility located in Columbia, Missouri. DATES: June 8, 2015. ADDRESSES: Please refer to Docket ID NRC–2013–0235 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2013–0235. Address questions about NRC dockets to Carol Gallagher; telephone: 301–415–3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:09 Jun 05, 2015 Jkt 235001 https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Michael Balazik, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2856; email: Michael.Balazik@nrc.gov. SUPPLEMENTARY INFORMATION: On November 7, 2014, NWMI filed with the NRC, pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, and part 50 of Title 10 of the Code of Federal Regulations (10 CFR), a portion of an application for a construction permit for a medical radioisotope production facility in Columbia, Missouri. By letter dated February 5, 2015 (ADAMS Accession No. ML15086A262), NWMI withdrew and resubmitted this portion of its construction permit application (ADAMS Accession No. ML15086A261) to include a discussion of connected actions in its environmental report in response to a January 23, 2015, letter from the NRC (ADAMS Accession No. ML14349A501). A notice of receipt of this application was previously published in the Federal Register on April 21, 2015 (80 FR 22227). An exemption from certain requirements of 10 CFR 2.101(a)(5) granted by the Commission on October 7, 2013, and published in the Federal Register on October 24, 2013 (78 FR 63501), in response to a letter from NWMI dated August 9, 2013 (ADAMS Accession No. ML13227A295), allowed for NWMI to submit its construction permit application in two parts. Specifically, the exemption allowed NWMI to submit a portion of its application for a construction permit up to six months prior to the remainder of the application regardless of whether or not an environmental impact statement or a supplement to an environmental impact statement was prepared during the review of its application. On February 5, 2015, in accordance with 10 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 CFR 2.101(a)(5), NWMI submitted the following in part one of the construction permit application (ADAMS Accession No. ML15086A261): • The description and safety assessment of the site required by 10 CFR 50.34(a)(1), • the environmental report required by 10 CFR 50.30(f), • the filing fee information required by 10 CFR 50.30(e) and 10 CFR 170.21, • the general information required by 10 CFR 50.33; and • the agreement limiting access to classified information required by 10 CFR 50.37. The NRC staff has determined that NWMI has submitted the information listed above in accordance with 10 CFR 2.101(a)(5) and that the partial application is acceptable for docketing. The docket number established for the NWMI facility is 50–609. The NRC staff will perform a detailed technical review of the partial construction permit application. Docketing of the partial construction permit application does not preclude the NRC from requesting additional information from the applicant as the review proceeds, nor does it predict whether the Commission will grant or deny the application. The NRC staff will also perform an acceptance review of the second and final part of the construction permit application when it is tendered. As stated in NWMI’s February 5, 2015, letter, the second and final part of NWMI’s application for a construction permit will contain the remainder of the preliminary safety analysis report required by 10 CFR 50.34(a) and will be submitted in accordance with the requirements of 10 CFR 2.101(a)(5). If, after completion of the acceptance review of the full construction permit application, the full construction permit application is found acceptable for docketing, the Commission or a designated Atomic Safety and Licensing Board will conduct a hearing in accordance with Subpart L, ‘‘Simplified Hearing Procedures for NRC Adjudications,’’ of 10 CFR part 2 and the Advisory Committee on Reactor Safeguards will prepare a report on the construction permit application consistent with 10 CFR 50.58, ‘‘Hearings and report of the Advisory Committee on Reactor Safeguards.’’ The Commission will announce in a future Federal Register notice, the opportunity to petition for leave to intervene in the hearing required for this application by 10 CFR 50.58, as well as the time and place of the hearing. If the Commission finds that the full construction permit application meets the applicable standards of the Atomic Energy Act and E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices the Commission’s regulations, and that required notifications to other agencies and bodies have been made, the Commission will issue a construction permit, in the form and containing conditions and limitations that the Commission finds appropriate and necessary. Pursuant to 10 CFR part 51, the NRC staff will conduct an environmental review of the construction permit before recommending Commission action on the application. The NRC staff will determine in accordance with 10 CFR 51.25, whether it will prepare an environmental impact statement or an environmental assessment to inform the decision on the construction permit application and will publish a Federal Register notice concerning its environmental review. Dated at Rockville, Maryland, this 29th day of May 2015. For the Nuclear Regulatory Commission. Alexander Adams, Jr., Chief, Research and Test Reactors Licensing Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor Regulation. [FR Doc. 2015–13937 Filed 6–5–15; 8:45 am] POSTAL SERVICE Product Change—Priority Mail Negotiated Service Agreement Postal ServiceTM. Notice. AGENCY: ACTION: The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add a domestic shipping services contract to the list of Negotiated Service Agreements in the Mail Classification Schedule’s Competitive Products List. DATES: Effective date: June 8, 2015. FOR FURTHER INFORMATION CONTACT: Elizabeth A. Reed, 202–268–3179. SUPPLEMENTARY INFORMATION: The United States Postal Service® hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3), on May 29, 2015, it filed with the Postal Regulatory Commission a Request of the United States Postal Service to Add Priority Mail Contract 123 to Competitive Product List. Documents are available at www.prc.gov, Docket Nos. MC2015–52, CP2015–80. SUMMARY: Stanley F. Mires, Attorney, Federal Compliance. BILLING CODE 7590–01–P [FR Doc. 2015–13877 Filed 6–5–15; 8:45 am] BILLING CODE 7710–12–P POSTAL SERVICE PRESIDIO TRUST Product Change—Priority Mail Negotiated Service Agreement Notice of Public Meeting of Presidio Institute Advisory Council Postal ServiceTM. ACTION: Notice. AGENCY: The Presidio Trust. Notice of public meeting of Presidio Institute Advisory Council. AGENCY: ACTION: The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add a domestic shipping services contract to the list of Negotiated Service Agreements in the Mail Classification Schedule’s Competitive Products List. DATES: Effective date: June 8, 2015. FOR FURTHER INFORMATION CONTACT: Elizabeth A. Reed, 202–268–3179. SUPPLEMENTARY INFORMATION: The United States Postal Service® hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3), on May 29, 2015, it filed with the Postal Regulatory Commission a Request of the United States Postal Service to Add Priority Mail Contract 124 to Competitive Product List. Documents are available at www.prc.gov, Docket Nos. MC2015–53, CP2015–81. mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: Stanley F. Mires, Attorney, Federal Compliance. [FR Doc. 2015–13879 Filed 6–5–15; 8:45 am] BILLING CODE 7710–12–P VerDate Sep<11>2014 17:09 Jun 05, 2015 Jkt 235001 Pursuant to the Federal Advisory Committee Act, as amended (5 U.S.C. Appendix 2), notice is hereby given that a public meeting of the Presidio Institute Advisory Council (Council) will be held from 9:00 a.m. to 12:00 p.m. on Tuesday, June 30, 2015. The meeting is open to the public, and oral public comment will be received at the meeting. The Council was formed to advise the Executive Director of the Presidio Trust (Trust) on matters pertaining to the rehabilitation and reuse of Fort Winfield Scott as a new national center focused on service and leadership development. SUPPLEMENTARY INFORMATION: The Trust’s Executive Director, in consultation with the Chair of the Board of Directors, has determined that the Council is in the public interest and supports the Trust in performing its duties and responsibilities under the Presidio Trust Act, 16 U.S.C. 460bb appendix. SUMMARY: PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 32419 The Council will advise on the establishment of a new national center (Presidio Institute) focused on service and leadership development, with specific emphasis on: (a) Assessing the role and key opportunities of a national center dedicated to service and leadership at Fort Scott in the Presidio of San Francisco; (b) providing recommendations related to the Presidio Institute’s programmatic goals, target audiences, content, implementation and evaluation; (c) providing guidance on a phased development approach that leverages a combination of funding sources including philanthropy; and (d) making recommendations on how to structure the Presidio Institute’s business model to best achieve the Presidio Institute’s mission and ensure long-term financial self-sufficiency. Meeting Agenda: This meeting of the Council will feature a presentation by Fellows from the Presidio Institute Cross Sector Leaders Fellowship program. Updates will be provided on programs and input will be sought on potential audiences and program participants. The period from 11:30 a.m. to 12:00 p.m. will be reserved for public comments. Public Comment: Individuals who would like to offer comments are invited to sign-up at the meeting and speaking times will be assigned on a first-come, first-served basis. Written comments may be submitted on cards that will be provided at the meeting, via mail to Aimee Vincent, Presidio Institute, 1201 Ralston Avenue, San Francisco, CA 94129–0052, or via email to institute@presidiotrust.gov. If individuals submitting written comments request that their address or other contact information be withheld from public disclosure, it will be honored to the extent allowable by law. Such requests must be stated prominently at the beginning of the comments. The Trust will make available for public inspection all submissions from organizations or businesses and from persons identifying themselves as representatives or officials of organizations and businesses. Time: The meeting will be held from 9:00 a.m. to 12:00 p.m. on Tuesday, June 30, 2015. Location: The meeting will be held at the Presidio Institute, Building 1202 Ralston Avenue, San Francisco, CA 94129. FOR FURTHER INFORMATION CONTACT: Additional information is available online at https://www.presidio.gov/ explore/Pages/fort-scott-council.aspx. E:\FR\FM\08JNN1.SGM 08JNN1

Agencies

[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Notices]
[Pages 32418-32419]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13937]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-609; NRC-2013-0235]


Northwest Medical Isotopes, LLC; Construction Permit Application

AGENCY: Nuclear Regulatory Commission.

ACTION: Construction permit application; docketing.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has 
determined that the partial application for a construction permit, 
submitted by Northwest Medical Isotopes, LLC (NWMI) is acceptable for 
docketing. The NWMI proposes to build a medical radioisotope production 
facility located in Columbia, Missouri.

DATES: June 8, 2015.

ADDRESSES: Please refer to Docket ID NRC-2013-0235 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0235. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Michael Balazik, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2856; email: Michael.Balazik@nrc.gov.

SUPPLEMENTARY INFORMATION: On November 7, 2014, NWMI filed with the 
NRC, pursuant to Section 103 of the Atomic Energy Act of 1954, as 
amended, and part 50 of Title 10 of the Code of Federal Regulations (10 
CFR), a portion of an application for a construction permit for a 
medical radioisotope production facility in Columbia, Missouri. By 
letter dated February 5, 2015 (ADAMS Accession No. ML15086A262), NWMI 
withdrew and resubmitted this portion of its construction permit 
application (ADAMS Accession No. ML15086A261) to include a discussion 
of connected actions in its environmental report in response to a 
January 23, 2015, letter from the NRC (ADAMS Accession No. 
ML14349A501). A notice of receipt of this application was previously 
published in the Federal Register on April 21, 2015 (80 FR 22227).
    An exemption from certain requirements of 10 CFR 2.101(a)(5) 
granted by the Commission on October 7, 2013, and published in the 
Federal Register on October 24, 2013 (78 FR 63501), in response to a 
letter from NWMI dated August 9, 2013 (ADAMS Accession No. 
ML13227A295), allowed for NWMI to submit its construction permit 
application in two parts. Specifically, the exemption allowed NWMI to 
submit a portion of its application for a construction permit up to six 
months prior to the remainder of the application regardless of whether 
or not an environmental impact statement or a supplement to an 
environmental impact statement was prepared during the review of its 
application. On February 5, 2015, in accordance with 10 CFR 
2.101(a)(5), NWMI submitted the following in part one of the 
construction permit application (ADAMS Accession No. ML15086A261):
     The description and safety assessment of the site required 
by 10 CFR 50.34(a)(1),
     the environmental report required by 10 CFR 50.30(f),
     the filing fee information required by 10 CFR 50.30(e) and 
10 CFR 170.21,
     the general information required by 10 CFR 50.33; and
     the agreement limiting access to classified information 
required by 10 CFR 50.37.
    The NRC staff has determined that NWMI has submitted the 
information listed above in accordance with 10 CFR 2.101(a)(5) and that 
the partial application is acceptable for docketing. The docket number 
established for the NWMI facility is 50-609.
    The NRC staff will perform a detailed technical review of the 
partial construction permit application. Docketing of the partial 
construction permit application does not preclude the NRC from 
requesting additional information from the applicant as the review 
proceeds, nor does it predict whether the Commission will grant or deny 
the application. The NRC staff will also perform an acceptance review 
of the second and final part of the construction permit application 
when it is tendered. As stated in NWMI's February 5, 2015, letter, the 
second and final part of NWMI's application for a construction permit 
will contain the remainder of the preliminary safety analysis report 
required by 10 CFR 50.34(a) and will be submitted in accordance with 
the requirements of 10 CFR 2.101(a)(5). If, after completion of the 
acceptance review of the full construction permit application, the full 
construction permit application is found acceptable for docketing, the 
Commission or a designated Atomic Safety and Licensing Board will 
conduct a hearing in accordance with Subpart L, ``Simplified Hearing 
Procedures for NRC Adjudications,'' of 10 CFR part 2 and the Advisory 
Committee on Reactor Safeguards will prepare a report on the 
construction permit application consistent with 10 CFR 50.58, 
``Hearings and report of the Advisory Committee on Reactor 
Safeguards.'' The Commission will announce in a future Federal Register 
notice, the opportunity to petition for leave to intervene in the 
hearing required for this application by 10 CFR 50.58, as well as the 
time and place of the hearing. If the Commission finds that the full 
construction permit application meets the applicable standards of the 
Atomic Energy Act and

[[Page 32419]]

the Commission's regulations, and that required notifications to other 
agencies and bodies have been made, the Commission will issue a 
construction permit, in the form and containing conditions and 
limitations that the Commission finds appropriate and necessary.
    Pursuant to 10 CFR part 51, the NRC staff will conduct an 
environmental review of the construction permit before recommending 
Commission action on the application. The NRC staff will determine in 
accordance with 10 CFR 51.25, whether it will prepare an environmental 
impact statement or an environmental assessment to inform the decision 
on the construction permit application and will publish a Federal 
Register notice concerning its environmental review.

    Dated at Rockville, Maryland, this 29th day of May 2015.

    For the Nuclear Regulatory Commission.

Alexander Adams, Jr.,
 Chief, Research and Test Reactors Licensing Branch, Division of Policy 
and Rulemaking, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-13937 Filed 6-5-15; 8:45 am]
 BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.