Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY, 32312 [2015-13920]

Download as PDF 32312 Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Rules and Regulations DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2015–0401] Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Long Beach Bridge, across Reynolds Channel, mile 4.7, at Nassau, New York. This temporary deviation is necessary to facilitate the Annual Salute to Veterans and Fireworks Display. This deviation allows the bridge to remain in the closed position during this public event. DATES: This deviation is effective from 9:30 p.m. on June 27, 2015 to 12 a.m. on June 28, 2015. ADDRESSES: The docket for this deviation, [USCG–2015–0401] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140, on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC, 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, contact Ms. Judy K. LeungYee, Project Officer, First Coast Guard District, telephone (212) 514–4330, email judy.k.leung-yee@uscg.mil. If you have questions on viewing the docket, call Ms. Cheryl Collins, Program SUMMARY: Manager, Docket Operations, telephone (202) 366–9826. SUPPLEMENTARY INFORMATION: The Long Beach Bridge, mile 4.7, across Reynolds Channel has a vertical clearance in the closed position of 22 feet at mean high water and 24 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.799(g). Reynolds Channel is transited by commercial fishing and recreational vessel traffic. Nassau County Department of Public Works requested this temporary deviation from the normal operating schedule to facilitate a public event, the City of Long Beach Annual Fireworks Display. Under this temporary deviation, the Long Beach Bridge may remain in the closed position between 9:30 p.m. on June 27, 2015 and 12:00 a.m. on June 28, 2015 (rain date June 28, 2015). There is no alternate route for vessel traffic; however, vessels that can pass under the closed draws during this closure may do so at any time. The bridge will be able to open in the event of an emergency. The Coast Guard will inform the users of the waterway through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 27, 2015. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2015–13920 Filed 6–5–15; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG–2015–0362] Safety Zones; Recurring Events in Captain of the Port Boston Zone AGENCY: Coast Guard, DHS. Notice of enforcement of regulation. ACTION: The Coast Guard will enforce the safety zones in the Captain of the Port Boston Zone on the specified dates and times listed below. This action is necessary to ensure the protection of the maritime public and event participants from the hazards associated with these annual recurring events. Under the provisions in the CFR, no person or vessel, except for the safety vessels assisting with these events may enter the safety zones unless given permission from the COTP or the designated onscene representative. The Coast Guard may be assisted by other Federal, State, or local law enforcement agencies in enforcing this regulation. SUMMARY: The regulation for these safety zones described in 33 CFR 165.118 will be enforced on the dates and times listed in the table below. DATES: If you have questions on this document, call or email Mr. Mark Cutter, Coast Guard Sector Boston Waterways Management Division, telephone 617– 223–4000, email Mark.E.Cutter@ uscg.mil. FOR FURTHER INFORMATION CONTACT: The Coast Guard will enforce the safety zones listed in 33 CFR 165.118 on the specified dates and times as indicated in Table 1 below. SUPPLEMENTARY INFORMATION: TABLE 1 Surfside Fireworks .................. • • • • • 6.5 Hull Youth Football Carnival Fireworks. • • • • • wreier-aviles on DSK5TPTVN1PROD with RULES 6.3 VerDate Sep<11>2014 15:05 Jun 05, 2015 Event Type: Fireworks Display. Sponsor: Salisbury Beach Partnership and Chamber of Commerce. Date: Every Saturday from June 27, 2015 through September 5, 2015. Time: 9:00 p.m. to 11:00 p.m. Location: All waters of the Atlantic Ocean near Salisbury Beach, MA, within a 350-yard radius of the fireworks barge located at position 42°50.6′ N., 070°48.4′ W. (NAD 83). Event Type: Fireworks Display. Sponsor: Hull Youth Football. Date: June 20, 2015. Time: 9:30 p.m. to 10:30 p.m. Location: All waters within a 450-foot radius of the fireworks barge located approximately 500 feet of off Nantasket Beach, Hull MA located at position 42°16.6′ N., 070°51.7′ W. (NAD 83). Jkt 235001 PO 00000 Frm 00046 Fmt 4700 Sfmt 4700 E:\FR\FM\08JNR1.SGM 08JNR1

Agencies

[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Rules and Regulations]
[Page 32312]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13920]



[[Page 32312]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0401]


Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Long Beach Bridge, across Reynolds 
Channel, mile 4.7, at Nassau, New York. This temporary deviation is 
necessary to facilitate the Annual Salute to Veterans and Fireworks 
Display. This deviation allows the bridge to remain in the closed 
position during this public event.

DATES: This deviation is effective from 9:30 p.m. on June 27, 2015 to 
12 a.m. on June 28, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-0401] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140, on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC, 20590, between 9 a.m. and 5 p.m., Monday through 
Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, contact Ms. Judy K. Leung-Yee, Project Officer, 
First Coast Guard District, telephone (212) 514-4330, email 
judy.k.leung-yee@uscg.mil. If you have questions on viewing the docket, 
call Ms. Cheryl Collins, Program Manager, Docket Operations, telephone 
(202) 366-9826.

SUPPLEMENTARY INFORMATION: The Long Beach Bridge, mile 4.7, across 
Reynolds Channel has a vertical clearance in the closed position of 22 
feet at mean high water and 24 feet at mean low water. The existing 
bridge operating regulations are found at 33 CFR 117.799(g).
    Reynolds Channel is transited by commercial fishing and 
recreational vessel traffic.
    Nassau County Department of Public Works requested this temporary 
deviation from the normal operating schedule to facilitate a public 
event, the City of Long Beach Annual Fireworks Display.
    Under this temporary deviation, the Long Beach Bridge may remain in 
the closed position between 9:30 p.m. on June 27, 2015 and 12:00 a.m. 
on June 28, 2015 (rain date June 28, 2015).
    There is no alternate route for vessel traffic; however, vessels 
that can pass under the closed draws during this closure may do so at 
any time. The bridge will be able to open in the event of an emergency.
    The Coast Guard will inform the users of the waterway through our 
Local and Broadcast Notice to Mariners of the change in operating 
schedule for the bridge so that vessels can arrange their transits to 
minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: May 27, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2015-13920 Filed 6-5-15; 8:45 am]
 BILLING CODE 9110-04-P