Dominion Transmission, Inc.; Notice of Application, 32101-32102 [2015-13733]

Download as PDF Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices or call toll free 1–866–208–3372 (voice) or 202–502–8659 (TTY), or send a FAX to 202–208–2106 with the required accommodations. Prior to the conference, Commission staff will post conference materials on the Commission’s Web site, www.ferc.gov (navigate to Documents & Filings, then Forms, then eForms Refresh). The conference will also be webcast and transcribed. The webcast will be available through a link on the Commission’s Calendar of Events, available at https://www.ferc.gov. An email account has been created for offsite participants to submit questions for the question and answer session at the technical conference. Please email questions at any time to eForms.Refresh@ferc.gov. For more information about this conference please contact Robert Hudson (Technical Information), Office of Enforcement, at (202) 502–6620 or Robert.Hudson@ferc.gov or Sarah McKinley (Logistical Information), Office of External Affairs at (202) 502– 8368 or Sarah.McKinley@ferc.gov. Dated: May 29, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–13725 Filed 6–4–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP15–492–000] asabaliauskas on DSK5VPTVN1PROD with NOTICES Dominion Transmission, Inc.; Notice of Application Take notice that on May 15, 2015, Dominion Transmission, Inc. (DTI), filed an application pursuant to section 7(c) of the Natural Gas Act (NGA) and part 157 of the Commission’s Regulations, for a certificate of public convenience and necessity to construct and operate the Leidy South Project (the ‘‘Project’’). The various parts of the Project will be located in Clinton, Franklin, and Centre Counties, Pennsylvania; Frederick County, Maryland; and Loudoun and Fauquier Counties, Virginia. The filing may be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. VerDate Sep<11>2014 18:31 Jun 04, 2015 Jkt 235001 Any questions regarding this application should be directed to Matthew R. Bley, Director Gas Transmission Certificates, Dominion Transmission, Inc., 701 E. Cary Street, Richmond, VA 23219, call at (804) 771– 4399, or email Matthew.R.Bley@ dom.com. Specifically, DTI proposes to replace two 1,100 horsepower (hp) compressor units with one 10,915 hp unit at the Finnefrock Compressor Station in Clinton County, PA; install one suction filter/separator at the Centre Compressor Station in Centre County, PA; install one 13,220 hp unit at the Chambersburg Compressor Station in Franklin County, PA; install one 15,900 hp unit at the Myersville Compressor Station in Frederick County, MD; install one 8,000 hp unit at the Leesburg Compressor Station in Loudoun County, VA; install a new cooler and filter separator at the Quantico Compressor Station in Fauquier County, VA; and construct a new meter station at the Panda Stonewall Power Project in Loudoun County, VA. The Project will allow DTI to provide an incremental 155 MMcf per day of firm transportation service to three electric power generation facilities. The total cost of the Project will be approximately $209,657,857. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 32101 Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 5 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: 5 p.m. Eastern Time on June 17, 2015. E:\FR\FM\05JNN1.SGM 05JNN1 32102 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices Dated: May 27, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–13733 Filed 6–4–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission asabaliauskas on DSK5VPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–149–000. Applicants: American Transmission Company LLC. Description: Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC. Filed Date: 5/29/15. Accession Number: 20150529–5347. Comments Due: 5 p.m. ET 6/19/15. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–136–003; ER13–135–003; ER13–137–003; ER13– 138–003; ER13–141–003; ER13–142– 003. Applicants: Georgia-Pacific Brewton LLC. Description: Supplement to December 30, 2014 Updated Market Power Analysis in Southeast Region of the Georgia-Pacific Entities. Filed Date: 5/29/15. Accession Number: 20150529–5284. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1812–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): 2015–05–29_SA 2790 ATC-Alliant Energy Operating Agreement to be effective 7/29/2015. Filed Date: 5/29/15. Accession Number: 20150529–5245. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1813–000. Applicants: The Connecticut Light and Power Company. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Joint Market Based Tariff to be effective 5/30/2015. Filed Date: 5/29/15. Accession Number: 20150529–5294. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1814–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): 2015–05–29_SA VerDate Sep<11>2014 18:31 Jun 04, 2015 Jkt 235001 2790 Notice of Termination ATC-Alliant OA to be effective 7/29/2015. Filed Date: 5/29/15. Accession Number: 20150529–5315. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1815–000. Applicants: Public Service Company of New Hampshire. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Joint Market Based Tariff to be effective 5/30/2015. Filed Date: 5/29/15. Accession Number: 20150529–5316. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1816–000. Applicants: Western Massachusetts Electric Company. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Joint Market Based Tariff to be effective 5/30/2015. Filed Date: 5/29/15. Accession Number: 20150529–5322. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1817–000. Applicants: San Diego Gas & Electric Company. Description: Fourth Annual Informational Filing [Cycle 4] of Fourth Transmission Owner Rate Formula rate mechanism of San Diego Gas & Electric Company. Filed Date: 5/29/15. Accession Number: 20150529–5344. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1818–000. Applicants: Southern Company Services, Inc. Description: Notice of Termination of Service Agreement for Network Integration Transmission Service and Network Operating Agreement between City of Seneca, South Carolina and Southern Company Services, Inc., as agent for Southern Companies. Filed Date: 5/29/15. Accession Number: 20150529–5346. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1819–000. Applicants: CED Atwell Island West, LLC. Description: Initial rate filing per 35.12 CED Atwell West LLC Co-Tenancy Filing to be effective 5/31/2015. Filed Date: 5/29/15. Accession Number: 20150529–5359. Comments Due: 5 p.m. ET 6/19/15. Docket Numbers: ER15–1820–000. Applicants: SPS Atwell Island, LLC. Description: Initial rate filing per 35.12 Filing of Co-Tenancy and Common Facilities Agreement to be effective 5/29/2015. Filed Date: 5/29/15. Accession Number: 20150529–5424. Comments Due: 5 p.m. ET 6/19/15. Take notice that the Commission received the following electric reliability filings: PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Docket Numbers: RR15–10–000. Applicants: North American Electric Reliability Corp. Description: North American Electric Reliability Corporation’s Report of Budgeted to Actual Costs for 2014 for NERC and the Regional Entities. Filed Date: 5/29/15. Accession Number: 20150529–5246. Comments Due: 5 p.m. ET 6/19/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 29, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–13727 Filed 6–4–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–493–000] Notice of Application; El Paso Natural Gas Company, LLC Take notice that on May 19, 2015, El Paso Natural Gas Company, L.L.C. (El Paso), P.O. Box 1087, Colorado Springs, Colorado 80944, filed an application pursuant to section 3 of the Natural Gas Act (NGA) and Part 153 of the Commission’s regulations to amend its Monument 90 Presidential Permit to establish a maximum export capacity of 56.9 million cubic feet per day at its existing international border crossing from the United States into Mexico located in Cochise County, Arizona, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in E:\FR\FM\05JNN1.SGM 05JNN1

Agencies

[Federal Register Volume 80, Number 108 (Friday, June 5, 2015)]
[Notices]
[Pages 32101-32102]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13733]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP15-492-000]


Dominion Transmission, Inc.; Notice of Application

    Take notice that on May 15, 2015, Dominion Transmission, Inc. 
(DTI), filed an application pursuant to section 7(c) of the Natural Gas 
Act (NGA) and part 157 of the Commission's Regulations, for a 
certificate of public convenience and necessity to construct and 
operate the Leidy South Project (the ``Project''). The various parts of 
the Project will be located in Clinton, Franklin, and Centre Counties, 
Pennsylvania; Frederick County, Maryland; and Loudoun and Fauquier 
Counties, Virginia. The filing may be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Matthew R. Bley, Director Gas Transmission Certificates, Dominion 
Transmission, Inc., 701 E. Cary Street, Richmond, VA 23219, call at 
(804) 771-4399, or email Matthew.R.Bley@dom.com.
    Specifically, DTI proposes to replace two 1,100 horsepower (hp) 
compressor units with one 10,915 hp unit at the Finnefrock Compressor 
Station in Clinton County, PA; install one suction filter/separator at 
the Centre Compressor Station in Centre County, PA; install one 13,220 
hp unit at the Chambersburg Compressor Station in Franklin County, PA; 
install one 15,900 hp unit at the Myersville Compressor Station in 
Frederick County, MD; install one 8,000 hp unit at the Leesburg 
Compressor Station in Loudoun County, VA; install a new cooler and 
filter separator at the Quantico Compressor Station in Fauquier County, 
VA; and construct a new meter station at the Panda Stonewall Power 
Project in Loudoun County, VA. The Project will allow DTI to provide an 
incremental 155 MMcf per day of firm transportation service to three 
electric power generation facilities. The total cost of the Project 
will be approximately $209,657,857.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: 5 p.m. Eastern Time on June 17, 2015.


[[Page 32102]]


    Dated: May 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-13733 Filed 6-4-15; 8:45 am]
BILLING CODE 6717-01-P