Arkansas Electric Cooperative Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 30229-30230 [2015-12708]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 101 / Wednesday, May 27, 2015 / Notices
total capacity of 39.6 megawatts; (3) a
1,100-foot-long, 400-foot-wide tailrace;
(4) a 6.9/115 kilo-Volt (kV) substation;
and (5) a 4-mile-long, 115kV
transmission line. The proposed project
would have an estimated average annual
generation of 140,000 megawatt-hours,
and operate as directed by the Corps.
Applicant Contact: Mr. Jonathan
Oliver, Arkansas Electric Cooperative
Corporation, One Cooperative Way,
Little Rock, AR 72209; Phone: (501)
570–2488; Email: jonathan.oliver@
aecc.com.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14664–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14664) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12713 Filed 5–26–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:45 May 26, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14665–000]
Arkansas Electric Cooperative
Corporation; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 3, 2015, Arkansas Electric
Cooperative Corporation, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of a hydropower project to be
located at the U.S. Army Corps of
Engineers’ (Corps) Col. Charles D.
Maynard Lock and Dam #5 on the
Arkansas River near the town of Pine
Bluff in Jefferson County, Arkansas. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 800-foot-long, 400foot-wide intake channel; (2) a 200-footlong, 210-foot-wide powerhouse
containing four generating units with a
total capacity of 36 megawatts; (3) a
1,000-foot-long, 400-foot-wide tailrace;
(4) a 6.9/115 kilo-Volt (kV) substation;
and (5) a 4-mile-long, 115kV
transmission line. The proposed project
would have an estimated average annual
generation of 140,000 megawatt-hours,
and operate as directed by the Corps.
Applicant Contact: Mr. Jonathan
Oliver, Arkansas Electric Cooperative
Corporation, One Cooperative Way,
Little Rock, AR 72209; Phone: (501)
570–2488; Email: jonathan.oliver@
aecc.com
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
30229
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14665–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14665) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12714 Filed 5–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14663–000]
Arkansas Electric Cooperative
Corporation; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 3, 2015, Arkansas Electric
Cooperative Corporation, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of a hydropower project to be
located at the U.S. Army Corps of
Engineers’ (Corps) Joe Hardin Lock and
Dam #3 on the Arkansas River near the
towns of Pine Bluff and Grady in
Jefferson and Lincoln Counties,
Arkansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
E:\FR\FM\27MYN1.SGM
27MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
30230
Federal Register / Vol. 80, No. 101 / Wednesday, May 27, 2015 / Notices
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 800-foot-long, 400foot-wide intake channel; (2) a 200-footlong, 210-foot-wide powerhouse
containing four generating units with a
total capacity of 48 megawatts; (3) a
1,300-foot-long, 500-foot-wide tailrace;
(4) a 6.9/115 kilo-Volt (kV) substation;
and (5) a 5-mile-long, 115kV
transmission line. The proposed project
would have an estimated average annual
generation of 155,000 megawatt-hours,
and operate as directed by the Corps.
Applicant Contact: Mr. Jonathan
Oliver, Arkansas Electric Cooperative
Corporation, One Cooperative Way,
Little Rock, AR 72209; Phone: (501)
570–2488; Email:
jonathan.oliver@aecc.com.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14663–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14663) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
VerDate Sep<11>2014
16:45 May 26, 2015
Jkt 235001
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12708 Filed 5–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD14–15–000]
Commission Information Collection
Activities (FERC–922); Comment
Request
Federal Energy Regulatory
Commission, DOE.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting for reinstatement a
revised information collection FERC–
922, ‘‘Performance Metrics for ISOs,
RTOs and Regions Outside ISOs and
RTOs,’’ to the Office of Management and
Budget (OMB) for review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (79 FR 52313,
9/3/2014) requesting public comments.
The Commission also issued an errata
notice to fix an errant hyperlink in the
60-day notice (8/26/2014). The
Commission received seven comments
on the FERC–922. The Commission
addresses these comments in this notice
and in its submittal to OMB.
DATES: Comments on the collection of
information are due by June 26, 2015.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0262, should be sent via email to
the Office of Information and Regulatory
Affairs at: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at (202) 395–4718.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. AD14–15–000, by either of the
following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp, or
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
SUMMARY:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. Submissions must be in an
acceptable file format, as described at:
https://www.ferc.gov/docs-filing/elibrary/
accept-file-formats.asp. The numeric
values corresponding to all charts and
tables containing metrics must be
submitted in an accompanying file, in
one of the following formats: Microsoft
Office 2003/2007/2010: Excel (.xls or
.xlsx), or ASCII Comma Separated Value
(.csv). For user assistance contact FERC
Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–922, Performance Metrics
for ISOs, RTOs and Regions Outside of
ISOs and RTOs.
OMB Control No.: 1902–0262.
Type of Request: Reinstatement and
revision of an information collection.
Abstract: In September 2008, the
United States Government
Accountability Office (GAO) issued a
report recommending that the Chairman
of the Commission, among other
actions, work with independent system
operators (ISOs), regional transmission
organizations (RTOs), stakeholders, and
other experts to develop standardized
measures that track the performance of
ISO/RTO operations and markets and
report the performance results to
Congress and the public annually,1
while also providing interpretation of
(1) what the measures and reported
performance communicate about the
benefits of ISOs/RTOs and, where
appropriate, (2) changes that need to be
made to address any performance
concerns. The GAO Report also
suggested that performance metrics be
explored for non-ISOs/RTO regions.
In response to the GAO Report,
Commission Staff conducted outreach
with ISOs/RTOs and other stakeholders
and in October 2010 established metrics
1 The 2008 GAO Report also recognized that the
extent of the Commission’s evaluation of ISO/RTO
performance may vary from year to year.
E:\FR\FM\27MYN1.SGM
27MYN1
Agencies
[Federal Register Volume 80, Number 101 (Wednesday, May 27, 2015)]
[Notices]
[Pages 30229-30230]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12708]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14663-000]
Arkansas Electric Cooperative Corporation; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On March 3, 2015, Arkansas Electric Cooperative Corporation, filed
an application for a preliminary permit, pursuant to section 4(f) of
the Federal Power Act (FPA), proposing to study the feasibility of a
hydropower project to be located at the U.S. Army Corps of Engineers'
(Corps) Joe Hardin Lock and Dam #3 on the Arkansas River near the towns
of Pine Bluff and Grady in Jefferson and Lincoln Counties, Arkansas.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters
[[Page 30230]]
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A 800-
foot-long, 400-foot-wide intake channel; (2) a 200-foot-long, 210-foot-
wide powerhouse containing four generating units with a total capacity
of 48 megawatts; (3) a 1,300-foot-long, 500-foot-wide tailrace; (4) a
6.9/115 kilo-Volt (kV) substation; and (5) a 5-mile-long, 115kV
transmission line. The proposed project would have an estimated average
annual generation of 155,000 megawatt-hours, and operate as directed by
the Corps.
Applicant Contact: Mr. Jonathan Oliver, Arkansas Electric
Cooperative Corporation, One Cooperative Way, Little Rock, AR 72209;
Phone: (501) 570-2488; Email: jonathan.oliver@aecc.com.
FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202)
502-8577.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426. The first page of any filing should include docket number P-
14663-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14663) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12708 Filed 5-26-15; 8:45 am]