Combined Notice of Filings #2, 30225-30226 [2015-12697]
Download as PDF
Federal Register / Vol. 80, No. 101 / Wednesday, May 27, 2015 / Notices
of an exemption does not require
Commission approval.
2. 2C Land & Cattle Company LLC is
now the exemptee of the Meeker
Wenschhof Hydroelectric Project, FERC
No. 14230. All correspondence should
be forwarded to: Mr. Christopher P.
Collins, Manager, 2C Land & Cattle
Company LLC, 1308 Sage Ridge Road,
P.O. Box 2607, Meeker, CO 81641.
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12712 Filed 5–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6550–003]
Frank M. Biber and Steven
Spellenberg; Bidden Creek Bores
Properties, LLC; Notice of Transfer of
Exemption
1. By letter filed May 11, 2015, Steven
Spellenberg informed the Commission
that the exemption from licensing for
the Biber-Spellenberg Hydro Project,
FERC No. 6550, originally issued
February 14, 1983,1 has been transferred
to Bidden Creek Bores Properties, LLC.
The project is located on the Bidden
Creek, Trinity County, California. The
transfer of an exemption does not
require Commission approval.
2. Bidden Creek Bores Properties, LLC
is now the exemptee of the BiberSpellenberg Hydro Project, FERC No.
6550. All correspondence should be
forwarded to: Mr. Stephen Bores, 3460
Country Club Pl., Danville, CA 94506–
5827.
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12711 Filed 5–26–15; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
1 22 FERC ¶ 62,182, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 MW or Less (1983).
VerDate Sep<11>2014
16:45 May 26, 2015
Jkt 235001
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–1747–000]
Beaver Dam Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Beaver
Dam Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 9, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
30225
Dated: May 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12706 Filed 5–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–78–002.
Applicants: NRG Energy, Inc., NRG
Yield, Inc.
Description: Request for Amended
Blanket Authorization of NRG Energy,
Inc., et al.
Filed Date: 5/20/15.
Accession Number: 20150520–5133.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: EC15–143–000.
Applicants: La Paloma Generating
Company, LLC.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
an Abbreviated Comment Period and
Expedited Action of La Paloma
Generating Company, LLC.
Filed Date: 5/20/15.
Accession Number: 20150520–5128.
Comments Due: 5 p.m. ET 6/10/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–2952–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing per 35:
2015–05–20_SSR Cost Allocation
Compliance Filing to be effective 4/3/
2014.
Filed Date: 5/20/15.
Accession Number: 20150520–5167.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15–518–002.
Applicants: Duke Energy Progress,
Inc., Duke Energy Florida, Inc., Duke
Energy Carolinas, LLC.
Description: Compliance filing per 35:
Order 676–H Compliance Filing and
Waiver Request (2nd Update) to be
effective 5/15/2015.
Filed Date: 5/20/15.
Accession Number: 20150520–5176.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15–767–002.
Applicants: Midcontinent
Independent System Operator, Inc.
E:\FR\FM\27MYN1.SGM
27MYN1
30226
Federal Register / Vol. 80, No. 101 / Wednesday, May 27, 2015 / Notices
Description: Compliance filing per 35:
2015–05–20_Schedule 43I White Pine 2
Compliance Filing to be effective 1/1/
2015.
Filed Date: 5/20/15.
Accession Number: 20150520–5183.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15–1755–000.
Applicants: Arizona Public Service
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Rate Schedule No.
278, North Gila 500kV Switchyard
Interconnection Agreement to be
effective 5/21/2015.
Filed Date: 5/20/15.
Accession Number: 20150520–5200.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15–1756–000.
Applicants: Arizona Public Service
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Rate Schedule No.
279, ANPP High Voltage Switchyard
Interconnection Agreement to be
effective 5/21/2015.
Filed Date: 5/20/15.
Accession Number: 20150520–5203.
Comments Due: 5 p.m. ET 6/10/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 20, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–12697 Filed 5–26–15; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–490–000]
Delfin LNG LLC; Notice of Application
Take notice that on May 8, 2015
Delfin LNG LLC (Delfin LNG), 1100
VerDate Sep<11>2014
16:45 May 26, 2015
Jkt 235001
Louisians Street, Houston, Texas 77002,
filed in Docket No. CP15–490–000, an
application pursuant to section 7(c) of
the Commission’s Regulations under the
Natural Gas Act and Parts 157 of the
Federal Energy Regulatory
Commission’s (Commission) regulations
requesting authorization to (1) reactivate
approximately 1.1 miles of existing 42inch pipeline formerly owned by U–T
Offshore System (UTOS), which runs
from Transcontinental Gas Pipeline
Company Station No. 44 (Transco
Station 44) to the mean highwater mark
along the Cameron Parish Coast; (2)
install 74,000 horsepower of new
compression; (3) construct 0.25 miles of
42-inch pipeline to connect the former
UTOS line to the new meter station; and
(4) construct 0.6 miles of twin 30-inch
pipelines between Transco Station 44
and the new compressor station in
Cameron Parrish, Louisiana that
comprise the onshore portion of Delfin
LNG’s proposed deepwater port (DWP),
an offshore liquefied natural gas facility
located off the coast of Louisiana in the
Gulf of Mexico, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. Additionally, Delfin
LNG requests a blanket construction
certificate under Part 17, Subpart F of
the Commission’s regulations. This
filing may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
Any questions regarding this
Application should be directed to
Daniel P. Werner, Delfin LNG LLC, 1100
Louisiana Street, Suite 3550, Houston,
Texas 77002; phone: 713–714–2278, or
J. Patrick Nevins, Hogan Lovells US
LLP, 555 Thirteenth Street NW.,
Washington, DC 20004; phone: 202–
637–6441.
Delfin LNG’s onshore facilities will
connect with the DWP facilities that are
subject to jurisdiction of the Maritime
Authority (MARAD) and the United
States Coast Guard (USCG).
Additionally, as part of Delfin LNG’s
DWP, Delfin LNG proposes to lease a
segment of pipeline from High Island
Offshore System, LLC (HIOS) that
extends from the term inus of the UTOS
pipeline offshore. Delfin LNG states in
its application that HIOS will submit a
separate application with the
Commission seeking authorization to
abandon by lease its facilities to Delfin
LNG.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Because the review of the DWP
proposal is the jurisdiction of MARAD/
USCG, the Commission acknowledges
Delfin LNG’s application in Docket No.
CP15–490–000 on May 8, 2015.
However, the Commission will not
begin processing Delfin LNG’s
application until such time that
MARAD/USCG accepts Delfin LNG’s
DWP application, and HIOS submits
abandonment application with the
Commission.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
E:\FR\FM\27MYN1.SGM
27MYN1
Agencies
[Federal Register Volume 80, Number 101 (Wednesday, May 27, 2015)]
[Notices]
[Pages 30225-30226]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12697]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC14-78-002.
Applicants: NRG Energy, Inc., NRG Yield, Inc.
Description: Request for Amended Blanket Authorization of NRG
Energy, Inc., et al.
Filed Date: 5/20/15.
Accession Number: 20150520-5133.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: EC15-143-000.
Applicants: La Paloma Generating Company, LLC.
Description: Application for Authorization for Disposition of
Jurisdictional Facilities and Request for an Abbreviated Comment Period
and Expedited Action of La Paloma Generating Company, LLC.
Filed Date: 5/20/15.
Accession Number: 20150520-5128.
Comments Due: 5 p.m. ET 6/10/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER14-2952-003.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing per 35: 2015-05-20_SSR Cost
Allocation Compliance Filing to be effective 4/3/2014.
Filed Date: 5/20/15.
Accession Number: 20150520-5167.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15-518-002.
Applicants: Duke Energy Progress, Inc., Duke Energy Florida, Inc.,
Duke Energy Carolinas, LLC.
Description: Compliance filing per 35: Order 676-H Compliance
Filing and Waiver Request (2nd Update) to be effective 5/15/2015.
Filed Date: 5/20/15.
Accession Number: 20150520-5176.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15-767-002.
Applicants: Midcontinent Independent System Operator, Inc.
[[Page 30226]]
Description: Compliance filing per 35: 2015-05-20_Schedule 43I
White Pine 2 Compliance Filing to be effective 1/1/2015.
Filed Date: 5/20/15.
Accession Number: 20150520-5183.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15-1755-000.
Applicants: Arizona Public Service Company.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Rate
Schedule No. 278, North Gila 500kV Switchyard Interconnection Agreement
to be effective 5/21/2015.
Filed Date: 5/20/15.
Accession Number: 20150520-5200.
Comments Due: 5 p.m. ET 6/10/15.
Docket Numbers: ER15-1756-000.
Applicants: Arizona Public Service Company.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Rate
Schedule No. 279, ANPP High Voltage Switchyard Interconnection
Agreement to be effective 5/21/2015.
Filed Date: 5/20/15.
Accession Number: 20150520-5203.
Comments Due: 5 p.m. ET 6/10/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 20, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-12697 Filed 5-26-15; 8:45 am]