Dorena Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 30073 [2015-12613]

Download as PDF Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices (EGPNA),2 informed the Commission that the exemption from licensing for the Lower Low Line Project, FERC No. 8961, originally issued April 16, 1986,3 has been transferred to Lowline Rapids, LLC, an affiliate of Enel Green Power. The project is located on the Low Line Canal in Twin Falls County, Idaho. The transfer of an exemption does not require Commission approval. 2. Lowline Rapids, LLC is now the exemptee of the Lower Low Line Project, FERC No. 8961. All correspondence should be forwarded to: Lowline Rapids, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12610 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11945–033] mstockstill on DSK4VPTVN1PROD with NOTICES Dorena Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application to amend license. b. Project No.: 11945–033. c. Date Filed: April 14, 2015. d. Applicant: Dorena Hydro, LLC. e. Name of Project: Dorena Lake Dam Hydroelectric Project. f. Location: The project is located on the U.S. Army Corps of Engineers’ Dorena Lake Dam on the Row River in Lane County, Oregon. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Peter Clermont, President, Dorena Hydro, LLC, 1498 E. Main Street, Suite 103348, Cottage Grove, OR 97424, (647) 291–7416. i. FERC Contact: Mr. Steven Sachs, (202) 502–8666, or steven.sachs@ ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 35 FERC ¶ 62,104, Order Granting Exemption From Licensing (Conduit) (1986). VerDate Sep<11>2014 17:50 May 22, 2015 Jkt 235001 recommendations is 30 days from the date of issuance of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 11945–033) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The licensee requests the license be amended to incorporate significant changes made to the project during construction that were not authorized in the license. The modified facilities consist of: (1) A 433-foot-long, 10-foot diameter steel penstock; (2) a 38-footwide, 42-foot-long siphon house; (3) a 62-foot-wide, 67-foot-long powerhouse; (4) a 6.1-megawatt (MW) vertical Kaplan turbine and a 1.4–MW horizontal Francis turbine; and (5) a 115-foot-long, 34-foot-wide concrete lined tailrace. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit PO 00000 Frm 00037 Fmt 4703 Sfmt 9990 30073 comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading, the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12613 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30073]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12613]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 11945-033]


Dorena Hydro, LLC; Notice of Application Accepted for Filing, 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application to amend license.
    b. Project No.: 11945-033.
    c. Date Filed: April 14, 2015.
    d. Applicant: Dorena Hydro, LLC.
    e. Name of Project: Dorena Lake Dam Hydroelectric Project.
    f. Location: The project is located on the U.S. Army Corps of 
Engineers' Dorena Lake Dam on the Row River in Lane County, Oregon.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Peter Clermont, President, Dorena Hydro, LLC, 
1498 E. Main Street, Suite 103348, Cottage Grove, OR 97424, (647) 291-
7416.
    i. FERC Contact: Mr. Steven Sachs, (202) 502-8666, or 
steven.sachs@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the date of issuance of this 
notice. The Commission strongly encourages electronic filing. Please 
file motions to intervene, protests, comments, or recommendations using 
the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-11945-033) 
on any comments, motions to intervene, protests, or recommendations 
filed.
    k. Description of Request: The licensee requests the license be 
amended to incorporate significant changes made to the project during 
construction that were not authorized in the license. The modified 
facilities consist of: (1) A 433-foot-long, 10-foot diameter steel 
penstock; (2) a 38-foot-wide, 42-foot-long siphon house; (3) a 62-foot-
wide, 67-foot-long powerhouse; (4) a 6.1-megawatt (MW) vertical Kaplan 
turbine and a 1.4-MW horizontal Francis turbine; and (5) a 115-foot-
long, 34-foot-wide concrete lined tailrace.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading, 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12613 Filed 5-22-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.