Bypass Limited; Bypass Limited, LLC; Notice of Transfer of Exemption, 30068 [2015-12611]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
30068
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
conjunction with the proposed variance,
the licensee proposes to provide no
more than 50 cfs to the Potter Valley
Irrigation District (PVID) through the
East Branch Russian River.
The licensee also proposes to
establish a Potter Valley Drought
Working Group, comprised of the
resource agencies and stakeholders,
which would meet twice monthly
during the variance to determine
appropriate release levels within the
framework of the proposed variance.
The licensee requests that once a flow
is established, that a 24-hour average
flow be used as the compliance criteria
for the corresponding compliance point.
Finally, the licensee proposes to file
monthly compliance reports with the
Commission, resource agencies and
stakeholders, and to provide bi-monthly
email reports to the resource agencies
and stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
VerDate Sep<11>2014
17:50 May 22, 2015
Jkt 235001
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of proposed
action. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12597 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14372–001]
Grand Coulee Project Hydroelectric
Authority; Notice of Surrender of
Preliminary Permit
near Moses Lake in Grant County,
Washington.
The preliminary permit for Project
No. 14372 will remain in effect until the
close of business, June 18, 2015. But, if
the Commission is closed on this day,
then the permit remains in effect until
the close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12617 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9070–002]
Bypass Limited; Bypass Limited, LLC;
Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Bypass Project, FERC No. 9070,
originally issued September 26, 1985,3
has been transferred to Bypass Limited,
LLC, an affiliate of Enel Green Power.
The project is located on the Main Canal
at its intersection with the Bypass Canal
in Jerome County, Idaho. The transfer of
an exemption does not require
Commission approval.
2. Bypass Limited, LLC is now the
exemptee of the Bypass Project, FERC
No. 9070. All correspondence should be
forwarded to: Bypass Limited, LLC, c/o
Enel Green Power North America, Inc.,
Attn: General Counsel, 1 Tech Drive,
Suite 220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12611 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01P
Take notice that Grand Coulee Project
Hydroelectric Authority, permittee for
the proposed Rocky Coulee Wasteway
Hydroelectric Project, has requested that
its preliminary permit be terminated.
The permit was issued on July 11, 2012,
and would have expired on June 30,
2015.1 The project would have been
located on the Rocky Coulee Wasteway
1 140
PO 00000
FERC ¶ 62,036 122 (2012).
Frm 00032
Fmt 4703
Sfmt 9990
2 18
CFR § 385.2007(a)(2) (2014).
other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 32 FERC ¶ 62,661, Order Granting Exemption
From Licensing for a Conduit Hydroelectric Project
(1985).
1 Seventeen
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30068]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12611]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9070-002]
Bypass Limited; Bypass Limited, LLC; Notice of Transfer of
Exemption
1. By letter filed April 24, 2015,\1\ William B. Conway, Jr.,
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed
the Commission that the exemption from licensing for the Bypass
Project, FERC No. 9070, originally issued September 26, 1985,\3\ has
been transferred to Bypass Limited, LLC, an affiliate of Enel Green
Power. The project is located on the Main Canal at its intersection
with the Bypass Canal in Jerome County, Idaho. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ Seventeen other exempted projects which are to be
transferred were included in the April 24, 2015 letter. These
exemptions will be handled under separate proceedings.
\2\ Enel Green Power North America, Inc. is a wholly owned
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
\3\ 32 FERC ] 62,661, Order Granting Exemption From Licensing
for a Conduit Hydroelectric Project (1985).
---------------------------------------------------------------------------
2. Bypass Limited, LLC is now the exemptee of the Bypass Project,
FERC No. 9070. All correspondence should be forwarded to: Bypass
Limited, LLC, c/o Enel Green Power North America, Inc., Attn: General
Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12611 Filed 5-22-15; 8:45 am]