BP Hydro Associates; Lowline Rapids, LLC; Notice of Transfer of Exemption, 30072-30073 [2015-12610]
Download as PDF
30072
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12608 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No., 5766–008]
TKO Power, Inc., TKO Power, LLC;
Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Nichols Project, FERC No. 5766,
originally issued April 22, 1982,3 has
been transferred to TKO Power, LLC, an
affiliate of Enel Green Power. The
project is located on South Fork Bear
Creek in Shasta County, California. The
transfer of an exemption does not
require Commission approval.
2. TKO Power, LLC is now the
exemptee of the Nichols Project, FERC
No. 5766. All correspondence should be
forwarded to: TKO Power, LLC, c/o Enel
Green Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
Eastern Shore Natural Gas Company’s
(ESNG) proposed pipeline route as well
as several alternative routes filed by
ESNG on November 21, 2014 and March
6, 2015. This will assist staff in
completing its comparative evaluation
of environmental impacts of the
proposed project. Viewing of this area is
anticipated to be from public access
points and ESNG rights-of-way.
All interested parties planning to
attend must provide their own
transportation. Those attending should
meet at the following location:
• June 2, 2015 at 10:00 a.m. at Crossan
Park, located at 91 Parsons Road,
Landenberg, Pennsylvania
Please use the FERC’s free
eSubscription service to keep track of all
formal issuances and submittals in these
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to www.ferc.gov/docs-filing/
esubscription.asp.
Information about specific onsite
environmental reviews is posted on the
Commission’s calendar at https://
www.ferc.gov/EventCalendar/
EventsList.aspx. For additional
information, contact Office of External
Affairs at (866) 208–FERC.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12614 Filed 5–22–15; 8:45 am]
[FR Doc. 2015–12607 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Eastern Shore Natural Gas Company;
Notice of Onsite Environmental Review
On June 2, 2015 the Office of Energy
Projects staff will be in Chester County,
Pennsylvania to gather data related to
the environmental analysis of the
proposed White Oak Mainline
Expansion Project. Staff will examine
mstockstill on DSK4VPTVN1PROD with NOTICES
1 Seventeen
other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 19 FERC ¶ 62,111, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 MW or Less (1982).
VerDate Sep<11>2014
17:50 May 22, 2015
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[Docket No. ER15–1731–000]
[Docket No. CP15–18–000]
Jkt 235001
Celesta Energy, Inc.; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Celesta
Energy, Inc.’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 8, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2015–12601 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8961–002]
BP Hydro Associates; Lowline Rapids,
LLC; Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
E:\FR\FM\26MYN1.SGM
26MYN1
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Lower Low Line Project, FERC No.
8961, originally issued April 16, 1986,3
has been transferred to Lowline Rapids,
LLC, an affiliate of Enel Green Power.
The project is located on the Low Line
Canal in Twin Falls County, Idaho. The
transfer of an exemption does not
require Commission approval.
2. Lowline Rapids, LLC is now the
exemptee of the Lower Low Line
Project, FERC No. 8961. All
correspondence should be forwarded to:
Lowline Rapids, LLC, c/o Enel Green
Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12610 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11945–033]
mstockstill on DSK4VPTVN1PROD with NOTICES
Dorena Hydro, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application to
amend license.
b. Project No.: 11945–033.
c. Date Filed: April 14, 2015.
d. Applicant: Dorena Hydro, LLC.
e. Name of Project: Dorena Lake Dam
Hydroelectric Project.
f. Location: The project is located on
the U.S. Army Corps of Engineers’
Dorena Lake Dam on the Row River in
Lane County, Oregon.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Peter Clermont,
President, Dorena Hydro, LLC, 1498 E.
Main Street, Suite 103348, Cottage
Grove, OR 97424, (647) 291–7416.
i. FERC Contact: Mr. Steven Sachs,
(202) 502–8666, or steven.sachs@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
2 Enel
Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 35 FERC ¶ 62,104, Order Granting Exemption
From Licensing (Conduit) (1986).
VerDate Sep<11>2014
17:50 May 22, 2015
Jkt 235001
recommendations is 30 days from the
date of issuance of this notice. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
11945–033) on any comments, motions
to intervene, protests, or
recommendations filed.
k. Description of Request: The
licensee requests the license be
amended to incorporate significant
changes made to the project during
construction that were not authorized in
the license. The modified facilities
consist of: (1) A 433-foot-long, 10-foot
diameter steel penstock; (2) a 38-footwide, 42-foot-long siphon house; (3) a
62-foot-wide, 67-foot-long powerhouse;
(4) a 6.1-megawatt (MW) vertical Kaplan
turbine and a 1.4–MW horizontal
Francis turbine; and (5) a 115-foot-long,
34-foot-wide concrete lined tailrace.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
PO 00000
Frm 00037
Fmt 4703
Sfmt 9990
30073
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading,
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12613 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Pages 30072-30073]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12610]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8961-002]
BP Hydro Associates; Lowline Rapids, LLC; Notice of Transfer of
Exemption
1. By letter filed April 24, 2015,\1\ William B. Conway, Jr.,
Counsel for Enel Green Power North America, Inc.
[[Page 30073]]
(EGPNA),\2\ informed the Commission that the exemption from licensing
for the Lower Low Line Project, FERC No. 8961, originally issued April
16, 1986,\3\ has been transferred to Lowline Rapids, LLC, an affiliate
of Enel Green Power. The project is located on the Low Line Canal in
Twin Falls County, Idaho. The transfer of an exemption does not require
Commission approval.
---------------------------------------------------------------------------
\1\ Seventeen other exempted projects which are to be
transferred were included in the April 24, 2015 letter. These
exemptions will be handled under separate proceedings.
\2\ Enel Green Power North America, Inc. is a wholly owned
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
\3\ 35 FERC ] 62,104, Order Granting Exemption From Licensing
(Conduit) (1986).
---------------------------------------------------------------------------
2. Lowline Rapids, LLC is now the exemptee of the Lower Low Line
Project, FERC No. 8961. All correspondence should be forwarded to:
Lowline Rapids, LLC, c/o Enel Green Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12610 Filed 5-22-15; 8:45 am]
BILLING CODE 6717-01-P