Sweetwater Hydroelectric, Inc.; Lower Valley, LLC; Notice of Transfer of Exemption, 30071-30072 [2015-12608]

Download as PDF Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies of the EA will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (Appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. mstockstill on DSK4VPTVN1PROD with NOTICES Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number CP15–144 (note: the last three digits are excluded). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the VerDate Sep<11>2014 17:50 May 22, 2015 Jkt 235001 documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12615 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 30071 The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [Docket No. ER15–1714–000] Targray Americas Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2015–12616 Filed 5–22–15; 8:45 am] This is a supplemental notice in the above-referenced proceeding of Targray Americas Inc.’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is June 8, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. DEPARTMENT OF ENERGY PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Project No. 6756–008] Sweetwater Hydroelectric, Inc.; Lower Valley, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission that the exemption from licensing for the Lower Valley Project, FERC No. 6756, originally issued November 9, 1982,3 has been transferred to Lower Valley, LLC, an affiliate of Enel Green Power. The project is located on the Sugar River in Sullivan County, New Hampshire. The transfer of an exemption does not require Commission approval. 2. Lower Valley, LLC is now the exemptee of the Lower Valley Project, FERC No. 6756. All correspondence should be forwarded to: Lower Valley, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 21 FERC ¶ 62,216, Notice of Exemption from Licensing (1982). E:\FR\FM\26MYN1.SGM 26MYN1 30072 Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12608 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 5766–008] TKO Power, Inc., TKO Power, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission that the exemption from licensing for the Nichols Project, FERC No. 5766, originally issued April 22, 1982,3 has been transferred to TKO Power, LLC, an affiliate of Enel Green Power. The project is located on South Fork Bear Creek in Shasta County, California. The transfer of an exemption does not require Commission approval. 2. TKO Power, LLC is now the exemptee of the Nichols Project, FERC No. 5766. All correspondence should be forwarded to: TKO Power, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Dated: May 19, 2015. Kimberly D. Bose, Secretary. Eastern Shore Natural Gas Company’s (ESNG) proposed pipeline route as well as several alternative routes filed by ESNG on November 21, 2014 and March 6, 2015. This will assist staff in completing its comparative evaluation of environmental impacts of the proposed project. Viewing of this area is anticipated to be from public access points and ESNG rights-of-way. All interested parties planning to attend must provide their own transportation. Those attending should meet at the following location: • June 2, 2015 at 10:00 a.m. at Crossan Park, located at 91 Parsons Road, Landenberg, Pennsylvania Please use the FERC’s free eSubscription service to keep track of all formal issuances and submittals in these dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. To register for this service, go to www.ferc.gov/docs-filing/ esubscription.asp. Information about specific onsite environmental reviews is posted on the Commission’s calendar at https:// www.ferc.gov/EventCalendar/ EventsList.aspx. For additional information, contact Office of External Affairs at (866) 208–FERC. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12614 Filed 5–22–15; 8:45 am] [FR Doc. 2015–12607 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Eastern Shore Natural Gas Company; Notice of Onsite Environmental Review On June 2, 2015 the Office of Energy Projects staff will be in Chester County, Pennsylvania to gather data related to the environmental analysis of the proposed White Oak Mainline Expansion Project. Staff will examine mstockstill on DSK4VPTVN1PROD with NOTICES 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 19 FERC ¶ 62,111, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 MW or Less (1982). VerDate Sep<11>2014 17:50 May 22, 2015 Dated: May 19, 2015. Kimberly D. Bose, Secretary. [Docket No. ER15–1731–000] [Docket No. CP15–18–000] Jkt 235001 Celesta Energy, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Celesta Energy, Inc.’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is June 8, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2015–12601 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8961–002] BP Hydro Associates; Lowline Rapids, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Pages 30071-30072]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12608]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6756-008]


Sweetwater Hydroelectric, Inc.; Lower Valley, LLC; Notice of 
Transfer of Exemption

    1. By letter filed April 24, 2015,\1\ William B. Conway, Jr., 
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed 
the Commission that the exemption from licensing for the Lower Valley 
Project, FERC No. 6756, originally issued November 9, 1982,\3\ has been 
transferred to Lower Valley, LLC, an affiliate of Enel Green Power. The 
project is located on the Sugar River in Sullivan County, New 
Hampshire. The transfer of an exemption does not require Commission 
approval.
---------------------------------------------------------------------------

    \1\ Seventeen other exempted projects which are to be 
transferred were included in the April 24, 2015 letter. These 
exemptions will be handled under separate proceedings.
    \2\ Enel Green Power North America, Inc. is a wholly owned 
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
    \3\ 21 FERC ] 62,216, Notice of Exemption from Licensing (1982).
---------------------------------------------------------------------------

    2. Lower Valley, LLC is now the exemptee of the Lower Valley 
Project, FERC No. 6756. All correspondence should be forwarded to: 
Lower Valley, LLC, c/o Enel Green Power North America, Inc., Attn: 
General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810.


[[Page 30072]]


    Dated: May 19, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-12608 Filed 5-22-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.