Sweetwater Hydroelectric, Inc.; Lower Valley, LLC; Notice of Transfer of Exemption, 30071-30072 [2015-12608]
Download as PDF
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request
(Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
mstockstill on DSK4VPTVN1PROD with NOTICES
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number CP15–144
(note: the last three digits are excluded).
Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
VerDate Sep<11>2014
17:50 May 22, 2015
Jkt 235001
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12615 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
30071
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[Docket No. ER15–1714–000]
Targray Americas Inc.; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
[FR Doc. 2015–12616 Filed 5–22–15; 8:45 am]
This is a supplemental notice in the
above-referenced proceeding of Targray
Americas Inc.’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 8, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
DEPARTMENT OF ENERGY
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Project No. 6756–008]
Sweetwater Hydroelectric, Inc.; Lower
Valley, LLC; Notice of Transfer of
Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Lower Valley Project, FERC No.
6756, originally issued November 9,
1982,3 has been transferred to Lower
Valley, LLC, an affiliate of Enel Green
Power. The project is located on the
Sugar River in Sullivan County, New
Hampshire. The transfer of an
exemption does not require Commission
approval.
2. Lower Valley, LLC is now the
exemptee of the Lower Valley Project,
FERC No. 6756. All correspondence
should be forwarded to: Lower Valley,
LLC, c/o Enel Green Power North
America, Inc., Attn: General Counsel, 1
Tech Drive, Suite 220, Andover, MA
01810.
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 21 FERC ¶ 62,216, Notice of Exemption from
Licensing (1982).
E:\FR\FM\26MYN1.SGM
26MYN1
30072
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12608 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No., 5766–008]
TKO Power, Inc., TKO Power, LLC;
Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Nichols Project, FERC No. 5766,
originally issued April 22, 1982,3 has
been transferred to TKO Power, LLC, an
affiliate of Enel Green Power. The
project is located on South Fork Bear
Creek in Shasta County, California. The
transfer of an exemption does not
require Commission approval.
2. TKO Power, LLC is now the
exemptee of the Nichols Project, FERC
No. 5766. All correspondence should be
forwarded to: TKO Power, LLC, c/o Enel
Green Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
Eastern Shore Natural Gas Company’s
(ESNG) proposed pipeline route as well
as several alternative routes filed by
ESNG on November 21, 2014 and March
6, 2015. This will assist staff in
completing its comparative evaluation
of environmental impacts of the
proposed project. Viewing of this area is
anticipated to be from public access
points and ESNG rights-of-way.
All interested parties planning to
attend must provide their own
transportation. Those attending should
meet at the following location:
• June 2, 2015 at 10:00 a.m. at Crossan
Park, located at 91 Parsons Road,
Landenberg, Pennsylvania
Please use the FERC’s free
eSubscription service to keep track of all
formal issuances and submittals in these
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to www.ferc.gov/docs-filing/
esubscription.asp.
Information about specific onsite
environmental reviews is posted on the
Commission’s calendar at https://
www.ferc.gov/EventCalendar/
EventsList.aspx. For additional
information, contact Office of External
Affairs at (866) 208–FERC.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12614 Filed 5–22–15; 8:45 am]
[FR Doc. 2015–12607 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Eastern Shore Natural Gas Company;
Notice of Onsite Environmental Review
On June 2, 2015 the Office of Energy
Projects staff will be in Chester County,
Pennsylvania to gather data related to
the environmental analysis of the
proposed White Oak Mainline
Expansion Project. Staff will examine
mstockstill on DSK4VPTVN1PROD with NOTICES
1 Seventeen
other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 19 FERC ¶ 62,111, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 MW or Less (1982).
VerDate Sep<11>2014
17:50 May 22, 2015
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[Docket No. ER15–1731–000]
[Docket No. CP15–18–000]
Jkt 235001
Celesta Energy, Inc.; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Celesta
Energy, Inc.’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 8, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2015–12601 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8961–002]
BP Hydro Associates; Lowline Rapids,
LLC; Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Pages 30071-30072]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12608]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6756-008]
Sweetwater Hydroelectric, Inc.; Lower Valley, LLC; Notice of
Transfer of Exemption
1. By letter filed April 24, 2015,\1\ William B. Conway, Jr.,
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed
the Commission that the exemption from licensing for the Lower Valley
Project, FERC No. 6756, originally issued November 9, 1982,\3\ has been
transferred to Lower Valley, LLC, an affiliate of Enel Green Power. The
project is located on the Sugar River in Sullivan County, New
Hampshire. The transfer of an exemption does not require Commission
approval.
---------------------------------------------------------------------------
\1\ Seventeen other exempted projects which are to be
transferred were included in the April 24, 2015 letter. These
exemptions will be handled under separate proceedings.
\2\ Enel Green Power North America, Inc. is a wholly owned
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
\3\ 21 FERC ] 62,216, Notice of Exemption from Licensing (1982).
---------------------------------------------------------------------------
2. Lower Valley, LLC is now the exemptee of the Lower Valley
Project, FERC No. 6756. All correspondence should be forwarded to:
Lower Valley, LLC, c/o Enel Green Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810.
[[Page 30072]]
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12608 Filed 5-22-15; 8:45 am]
BILLING CODE 6717-01-P