LaChute Hydro Company, Inc.; LaChute Hydro Company, LLC; Notice of Transfer of Exemptions, 30065 [2015-12606]
Download as PDF
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 8, 2015.
Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12598 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project Nos. 5760–015 and 5762–009]
LaChute Hydro Company, Inc.;
LaChute Hydro Company, LLC; Notice
of Transfer of Exemptions
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
VerDate Sep<11>2014
17:50 May 22, 2015
Jkt 235001
(EGPNA),2 informed the Commission
that the exemptions from licensing for
the Upper LaChute River Project, FERC
No. 5760 and the Lower LaChute River
Project, FERC No. 5762, reinstated
November 15, 1984,3 have been
transferred to LaChute Hydro Company,
LLC, an affiliate of Enel Green Power.
The projects are located on the LaChute
River in Essex County, New York. The
transfer of an exemption does not
require Commission approval.
2. LaChute Hydro Company, LLC is
now the exemptee of the Upper LaChute
River Project, FERC No. 5760 and the
Lower LaChute River Project, FERC No.
5762. All correspondence should be
forwarded to: LaChute Hydro Company,
LLC, c/o Enel Green Power North
America, Inc., Attn: General Counsel, 1
Tech Drive, Suite 220, Andover, MA
01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12606 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10164–002]
SE Hazelton A, L.P.; SE Hazelton A,
LLC; Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Hazelton A Project, FERC No. 10164,
originally issued August 11, 1987,3 has
been transferred to SE Hazelton A, LLC,
an affiliate of Enel Green Power. The
project is located on the Northside
Canal in Jerome County, Idaho. The
transfer of an exemption does not
require Commission approval.
2. SE Hazelton A, LLC is now the
exemptee of the Hazelton A Project,
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 29 FERC ¶ 61,174, Order Reinstating
Exemptions and Denying Applications for
Preliminary Permit and License (1984).
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 40 FERC ¶ 62,155, Order Granting Exemption
From Licensing (Conduit) (1987).
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
30065
FERC No. 10164. All correspondence
should be forwarded to: SE Hazelton A,
LLC, c/o Enel Green Power North
America, Inc., Attn: General Counsel, 1
Tech Drive, Suite 220, Andover, MA
01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12612 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2837–032]
Erie Boulevard Hydropower, L.P.;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2837–032.
c. Date Filed: March 20, 2015.
d. Submitted By: Erie Boulevard
Hydropower, L.P.
e. Name of Project: Granby
Hydroelectric Project.
f. Location: On the Oswego River near
the town of Fulton, in Oswego County,
New York. The project does not affect
federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations
h. Applicant Contact: Steven P.
Murphy, Brookfield Renewable Energy
Group, 33 West 1st Street South, Fulton,
New York, 13069; (315) 598–6130 or by
email at Steven.Murphy@
brookfieldrenewable.com.
i. FERC Contact: Allyson Conner at
(202) 502–6082 or email at
allyson.conner@ferc.gov.
j. Erie Boulevard Hydropower, L.P.
(Erie) filed its request to use the
Traditional Licensing Process on March
20, 2015. Erie provided public notice of
its request on March 14, 15, and 18,
2015. In a letter dated May 19, 2015, the
Director of the Division of Hydropower
Licensing approved Erie’s request to use
the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and the
National Marine Fisheries Service under
section 7 of the Endangered Species Act
and the joint agency regulations
thereunder at 50
l. CFR, Part 402; and (b) the New York
State Historic Preservation Officer, as
required by section 106, National
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30065]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12606]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 5760-015 and 5762-009]
LaChute Hydro Company, Inc.; LaChute Hydro Company, LLC; Notice
of Transfer of Exemptions
1. By letter filed April 24, 2015,\1\ William B. Conway, Jr.,
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed
the Commission that the exemptions from licensing for the Upper LaChute
River Project, FERC No. 5760 and the Lower LaChute River Project, FERC
No. 5762, reinstated November 15, 1984,\3\ have been transferred to
LaChute Hydro Company, LLC, an affiliate of Enel Green Power. The
projects are located on the LaChute River in Essex County, New York.
The transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ Seventeen other exempted projects which are to be
transferred were included in the April 24, 2015 letter. These
exemptions will be handled under separate proceedings.
\2\ Enel Green Power North America, Inc. is a wholly owned
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
\3\ 29 FERC ] 61,174, Order Reinstating Exemptions and Denying
Applications for Preliminary Permit and License (1984).
---------------------------------------------------------------------------
2. LaChute Hydro Company, LLC is now the exemptee of the Upper
LaChute River Project, FERC No. 5760 and the Lower LaChute River
Project, FERC No. 5762. All correspondence should be forwarded to:
LaChute Hydro Company, LLC, c/o Enel Green Power North America, Inc.,
Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12606 Filed 5-22-15; 8:45 am]