LaChute Hydro Company, Inc.; LaChute Hydro Company, LLC; Notice of Transfer of Exemptions, 30065 [2015-12606]

Download as PDF Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on June 8, 2015. Dated: May 18, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12598 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES [Project Nos. 5760–015 and 5762–009] LaChute Hydro Company, Inc.; LaChute Hydro Company, LLC; Notice of Transfer of Exemptions 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. VerDate Sep<11>2014 17:50 May 22, 2015 Jkt 235001 (EGPNA),2 informed the Commission that the exemptions from licensing for the Upper LaChute River Project, FERC No. 5760 and the Lower LaChute River Project, FERC No. 5762, reinstated November 15, 1984,3 have been transferred to LaChute Hydro Company, LLC, an affiliate of Enel Green Power. The projects are located on the LaChute River in Essex County, New York. The transfer of an exemption does not require Commission approval. 2. LaChute Hydro Company, LLC is now the exemptee of the Upper LaChute River Project, FERC No. 5760 and the Lower LaChute River Project, FERC No. 5762. All correspondence should be forwarded to: LaChute Hydro Company, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12606 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10164–002] SE Hazelton A, L.P.; SE Hazelton A, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission that the exemption from licensing for the Hazelton A Project, FERC No. 10164, originally issued August 11, 1987,3 has been transferred to SE Hazelton A, LLC, an affiliate of Enel Green Power. The project is located on the Northside Canal in Jerome County, Idaho. The transfer of an exemption does not require Commission approval. 2. SE Hazelton A, LLC is now the exemptee of the Hazelton A Project, 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 29 FERC ¶ 61,174, Order Reinstating Exemptions and Denying Applications for Preliminary Permit and License (1984). 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 40 FERC ¶ 62,155, Order Granting Exemption From Licensing (Conduit) (1987). PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 30065 FERC No. 10164. All correspondence should be forwarded to: SE Hazelton A, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Dated: May 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12612 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2837–032] Erie Boulevard Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 2837–032. c. Date Filed: March 20, 2015. d. Submitted By: Erie Boulevard Hydropower, L.P. e. Name of Project: Granby Hydroelectric Project. f. Location: On the Oswego River near the town of Fulton, in Oswego County, New York. The project does not affect federal lands. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations h. Applicant Contact: Steven P. Murphy, Brookfield Renewable Energy Group, 33 West 1st Street South, Fulton, New York, 13069; (315) 598–6130 or by email at Steven.Murphy@ brookfieldrenewable.com. i. FERC Contact: Allyson Conner at (202) 502–6082 or email at allyson.conner@ferc.gov. j. Erie Boulevard Hydropower, L.P. (Erie) filed its request to use the Traditional Licensing Process on March 20, 2015. Erie provided public notice of its request on March 14, 15, and 18, 2015. In a letter dated May 19, 2015, the Director of the Division of Hydropower Licensing approved Erie’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and the National Marine Fisheries Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 l. CFR, Part 402; and (b) the New York State Historic Preservation Officer, as required by section 106, National E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30065]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12606]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 5760-015 and 5762-009]


LaChute Hydro Company, Inc.; LaChute Hydro Company, LLC; Notice 
of Transfer of Exemptions

    1. By letter filed April 24, 2015,\1\ William B. Conway, Jr., 
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed 
the Commission that the exemptions from licensing for the Upper LaChute 
River Project, FERC No. 5760 and the Lower LaChute River Project, FERC 
No. 5762, reinstated November 15, 1984,\3\ have been transferred to 
LaChute Hydro Company, LLC, an affiliate of Enel Green Power. The 
projects are located on the LaChute River in Essex County, New York. 
The transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ Seventeen other exempted projects which are to be 
transferred were included in the April 24, 2015 letter. These 
exemptions will be handled under separate proceedings.
    \2\ Enel Green Power North America, Inc. is a wholly owned 
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
    \3\ 29 FERC ] 61,174, Order Reinstating Exemptions and Denying 
Applications for Preliminary Permit and License (1984).
---------------------------------------------------------------------------

    2. LaChute Hydro Company, LLC is now the exemptee of the Upper 
LaChute River Project, FERC No. 5760 and the Lower LaChute River 
Project, FERC No. 5762. All correspondence should be forwarded to: 
LaChute Hydro Company, LLC, c/o Enel Green Power North America, Inc., 
Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810.

    Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12606 Filed 5-22-15; 8:45 am]
 BILLING CODE 6717-01-P