Hydro Development Group, Inc., Hydro Development Group Acquisition, LLC; Notice of Transfer of Exemption, 30069 [2015-12605]

Download as PDF Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7141–002] Mill Shoals Hydro Company, Inc.; Mill Shoals Hydro Company, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission that the exemption from licensing for the Milstead Dam Project, FERC No. 7141, originally issued April 15, 1983,3 has been transferred to Mill Shoals Hydro Company, LLC, an affiliate of Enel Green Power. The project is located on the Yellow River in Rockdale County, Georgia. The transfer of an exemption does not require Commission approval. 2. Mill Shoals Hydro Company, LLC is now the exemptee of the Milstead Dam Project, FERC No. 7141. All correspondence should be forwarded to: Mill Shoals Hydro Company, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. BILLING CODE 6717–01P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5633–011] Hydro Development Group, Inc., Hydro Development Group Acquisition, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission mstockstill on DSK4VPTVN1PROD with NOTICES [FR Doc. 2015–12605 Filed 5–22–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Florida Gas Transmission Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Jacksonville Expansion Project, and Request for Comments On Environmental Issues [FR Doc. 2015–12609 Filed 5–22–15; 8:45 am] 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 23 FERC ¶ 62,045, Notice of Exemption From Licensing (1983). 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 17:50 May 22, 2015 Dated: May 19, 2015. Kimberly D. Bose, Secretary. [Docket No. CP15–144–000] Dated: May 19, 2015. Kimberly D. Bose, Secretary. VerDate Sep<11>2014 that the exemption from licensing for the Number 3 Mill Project, FERC No. 5633, originally issued July 14, 1982,3 has been transferred to Hydro Development Group Acquisition, LLC, an affiliate of Enel Green Power. The project is located on the South Branch Oswegatchie River in St. Lawrence County, New York. The transfer of an exemption does not require Commission approval. 2. Hydro Development Group Acquisition, LLC is now the exemptee of the Number 3 Mill Project, FERC No. 5633. All correspondence should be forwarded to: Hydro Development Group Acquisition, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Jkt 235001 The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Jacksonville Expansion Project (Project). The Project would involve constructing and operating interstate natural gas transmission facilities by the Florida Gas Transmission Company, LLC (FGT) in Bradford, Clay, Columbia, and Suwannee Counties, Florida. Specifically, FGT would construct: (1) About 3 miles of pipeline in Suwannee and Columbia Counties; (2) about 5.7 miles of pipeline in Bradford County; and (3) a new compressor unit and regulation station in Bradford County. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public 3 20 FERC ¶ 62,054, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less (1982). PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 30069 and interested agencies on the Project. You can make a difference by providing us with your specific comments or concerns about the Project. Your comments should focus on the potential environmental impacts, reasonable alternatives, and measures to avoid or minimize environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before June 15, 2015. If you sent comments on this Project to the Commission before the opening of this docket on March 31, 2015, you will need to file those comments in Docket No. CP15–144–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, an FGT representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the Project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. The ‘‘For Citizens’’ section of the FERC Web site (www.ferc.gov) provides more information about the FERC and the environmental review process. This section also includes information about getting involved in FERC jurisdictional projects, and a citizens’ guide entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need to Know?’’ This guide addresses a number of frequently asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Public Participation For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. Please carefully E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30069]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12605]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 5633-011]


Hydro Development Group, Inc., Hydro Development Group 
Acquisition, LLC; Notice of Transfer of Exemption

    1. By letter filed April 24, 2015,\1\ William B. Conway, Jr., 
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed 
the Commission that the exemption from licensing for the Number 3 Mill 
Project, FERC No. 5633, originally issued July 14, 1982,\3\ has been 
transferred to Hydro Development Group Acquisition, LLC, an affiliate 
of Enel Green Power. The project is located on the South Branch 
Oswegatchie River in St. Lawrence County, New York. The transfer of an 
exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ Seventeen other exempted projects which are to be 
transferred were included in the April 24, 2015 letter. These 
exemptions will be handled under separate proceedings.
    \2\ Enel Green Power North America, Inc. is a wholly owned 
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
    \3\ 20 FERC ] 62,054, Order Granting Exemption from Licensing of 
a Small Hydroelectric Project of 5 Megawatts or Less (1982).
---------------------------------------------------------------------------

    2. Hydro Development Group Acquisition, LLC is now the exemptee of 
the Number 3 Mill Project, FERC No. 5633. All correspondence should be 
forwarded to: Hydro Development Group Acquisition, LLC, c/o Enel Green 
Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 
220, Andover, MA 01810.

    Dated: May 19, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-12605 Filed 5-22-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.