Hydro Development Group, Inc., Hydro Development Group Acquisition, LLC; Notice of Transfer of Exemption, 30069 [2015-12605]
Download as PDF
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7141–002]
Mill Shoals Hydro Company, Inc.; Mill
Shoals Hydro Company, LLC; Notice of
Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Milstead Dam Project, FERC No.
7141, originally issued April 15, 1983,3
has been transferred to Mill Shoals
Hydro Company, LLC, an affiliate of
Enel Green Power. The project is located
on the Yellow River in Rockdale
County, Georgia. The transfer of an
exemption does not require Commission
approval.
2. Mill Shoals Hydro Company, LLC
is now the exemptee of the Milstead
Dam Project, FERC No. 7141. All
correspondence should be forwarded to:
Mill Shoals Hydro Company, LLC, c/o
Enel Green Power North America, Inc.,
Attn: General Counsel, 1 Tech Drive,
Suite 220, Andover, MA 01810.
BILLING CODE 6717–01P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5633–011]
Hydro Development Group, Inc., Hydro
Development Group Acquisition, LLC;
Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[FR Doc. 2015–12605 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Florida Gas Transmission Company,
LLC; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Jacksonville Expansion
Project, and Request for Comments On
Environmental Issues
[FR Doc. 2015–12609 Filed 5–22–15; 8:45 am]
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 23 FERC ¶ 62,045, Notice of Exemption From
Licensing (1983).
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
17:50 May 22, 2015
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[Docket No. CP15–144–000]
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
VerDate Sep<11>2014
that the exemption from licensing for
the Number 3 Mill Project, FERC No.
5633, originally issued July 14, 1982,3
has been transferred to Hydro
Development Group Acquisition, LLC,
an affiliate of Enel Green Power. The
project is located on the South Branch
Oswegatchie River in St. Lawrence
County, New York. The transfer of an
exemption does not require Commission
approval.
2. Hydro Development Group
Acquisition, LLC is now the exemptee
of the Number 3 Mill Project, FERC No.
5633. All correspondence should be
forwarded to: Hydro Development
Group Acquisition, LLC, c/o Enel Green
Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Jkt 235001
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Jacksonville Expansion Project
(Project). The Project would involve
constructing and operating interstate
natural gas transmission facilities by the
Florida Gas Transmission Company,
LLC (FGT) in Bradford, Clay, Columbia,
and Suwannee Counties, Florida.
Specifically, FGT would construct: (1)
About 3 miles of pipeline in Suwannee
and Columbia Counties; (2) about 5.7
miles of pipeline in Bradford County;
and (3) a new compressor unit and
regulation station in Bradford County.
The Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
3 20 FERC ¶ 62,054, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 Megawatts or Less (1982).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
30069
and interested agencies on the Project.
You can make a difference by providing
us with your specific comments or
concerns about the Project. Your
comments should focus on the potential
environmental impacts, reasonable
alternatives, and measures to avoid or
minimize environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before June 15,
2015.
If you sent comments on this Project
to the Commission before the opening of
this docket on March 31, 2015, you will
need to file those comments in Docket
No. CP15–144–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, an FGT representative may
contact you about the acquisition of an
easement to construct, operate, and
maintain the proposed facilities. The
company would seek to negotiate a
mutually acceptable agreement.
However, if the Commission approves
the Project, that approval conveys with
it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings where compensation would
be determined in accordance with state
law.
The ‘‘For Citizens’’ section of the
FERC Web site (www.ferc.gov) provides
more information about the FERC and
the environmental review process. This
section also includes information about
getting involved in FERC jurisdictional
projects, and a citizens’ guide entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need to Know?’’
This guide addresses a number of
frequently asked questions, including
the use of eminent domain and how to
participate in the Commission’s
proceedings.
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or efiling@ferc.gov. Please carefully
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30069]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12605]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5633-011]
Hydro Development Group, Inc., Hydro Development Group
Acquisition, LLC; Notice of Transfer of Exemption
1. By letter filed April 24, 2015,\1\ William B. Conway, Jr.,
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed
the Commission that the exemption from licensing for the Number 3 Mill
Project, FERC No. 5633, originally issued July 14, 1982,\3\ has been
transferred to Hydro Development Group Acquisition, LLC, an affiliate
of Enel Green Power. The project is located on the South Branch
Oswegatchie River in St. Lawrence County, New York. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ Seventeen other exempted projects which are to be
transferred were included in the April 24, 2015 letter. These
exemptions will be handled under separate proceedings.
\2\ Enel Green Power North America, Inc. is a wholly owned
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
\3\ 20 FERC ] 62,054, Order Granting Exemption from Licensing of
a Small Hydroelectric Project of 5 Megawatts or Less (1982).
---------------------------------------------------------------------------
2. Hydro Development Group Acquisition, LLC is now the exemptee of
the Number 3 Mill Project, FERC No. 5633. All correspondence should be
forwarded to: Hydro Development Group Acquisition, LLC, c/o Enel Green
Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12605 Filed 5-22-15; 8:45 am]
BILLING CODE 6717-01-P