Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 30066-30067 [2015-12603]
Download as PDF
30066
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
m. With this notice, we are
designating Erie as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and consultation pursuant to section
106 of the National Historic
Preservation Act.
n. Erie filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 (d)
of the Commission’s regulations.
o. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
p. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2837.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by March 31, 2018.
q. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12604 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff will
attend the following meeting related to
VerDate Sep<11>2014
17:50 May 22, 2015
Jkt 235001
the Midcontinent Independent System
Operator, Inc. (MISO)—PJM
Interconnection, L.L.C. (PJM) Joint and
Common Market Initiative (Docket No.
AD14–3–000):
MISO/PJM Joint Stakeholder
Meeting—May 27, 2015.
The above-referenced meeting will be
held at: MISO Headquarters, 720 City
Center Drive, Carmel, IN 46032–7574.
The above-referenced meeting is open
to the public.
Further information may be found at
www.misoenergy.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. EL13–47, FirstEnergy
Solutions Corp. and Allegheny Energy
Supply Company, LLC v. PJM
Interconnection, L.L.C.
Docket No. EL13–88, Northern Indiana
Public Service Company v.
Midcontinent Independent System
Operator, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL11–34, Midcontinent
Independent System Operator, Inc.
Docket No. EL14–21, Southwest Power
Pool, Inc. v. Midcontinent
Independent System Operator, Inc.
Docket No. EL14–30, Midcontinent
Independent System Operator, Inc. v.
Southwest Power Pool, Inc.
Docket No. ER10–1791, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–1864, Southwest
Power Pool, Inc.
Docket Nos. ER13–1923, ER13–1938,
ER13–1943, ER13–1945, Midcontinent
Independent System Operator, Inc.
Docket Nos. ER13–1924, ER13–1926,
ER13–1927, ER13–1936, ER13–1944,
ER13–1947, PJM Interconnection,
L.L.C.
Docket Nos. ER13–1937, ER13–1939,
Southwest Power Pool, Inc.
Docket No. ER14–1174, Southwest
Power Pool, Inc.
Docket No. ER14–1736, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2445, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–623, PJM
Interconnection, L.L.C.
For more information, contact Valerie
Teeter, Office of Energy Policy and
Innovation, Federal Energy Regulatory
Commission at (202) 502–8538 or
Valerie.Teeter@ferc.gov.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12602 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 175–028 and 1988–086]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of Minimum
Flow Requirements.
b. Project Nos.: 175–028 and 1988–
086.
c. Date Filed: May 12, 2015.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Projects: Balch and HaasKings River.
f. Location: North Fork Kings River in
Fresno County, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jaime
Hoffman, License Coordinator, Pacific
Gas and Electric Company, Mail Code:
N13E, P.O. Box 770000, San Francisco,
CA 94177, Phone: (415) 973–1554.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 15 days from the
issuance date of this notice by the
Commission (June 3, 2015). The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project numbers (P–
175–028 and 1988–086) on any
comments, motions to intervene,
protests, or recommendations filed.
k. Description of Request: The
licensee requests a temporary variance
of the minimum flow requirements in
Helms Creek, North Fork Kings River
E:\FR\FM\26MYN1.SGM
26MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices
and Dinkey Creek from June 1 to
December 31, 2015. The licensee
requests Commission approval to adjust
the instantaneous minimum flow
requirement to a 24-hour average flow
regime. The licensee also proposes to
maintain minimum flows, such that the
instantaneous requirement is decreased:
From 4 to 3 cfs in Helms Creek below
Courtright Dam (gage KI–17) from June
1 to November 30; from 2.5 to 2 cubic
feet per second (cfs) in Helms Creek
below Courtright Dam; from 15 to 10 cfs
in the North Fork Kings River below
Wishon Dam (gage KI–27); from 15 to 10
cfs in the Dinkey Creek Siphon at Balch
(gage KI–31); from 2.5 to 2 cfs in the
North Fork Kings River below Balch
Diversion Dam (gage KI–9); from 10 to
7 cfs in the North Fork Kings River
above Dinkey Creek (gage KI–21); and
from 25 to 17 cfs in the North Fork
Kings River below Dinkey Creek (gage
KI–22). The licensee states that the flow
reductions are necessary due to the
ongoing drought conditions and historic
low snowpack levels this year.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
VerDate Sep<11>2014
17:50 May 22, 2015
Jkt 235001
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of proposed
action. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12603 Filed 5–22–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 77–275]
Southern California Edison Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of Minimum
Flow Requirements.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
30067
b. Project No.: 77–275.
c. Date Filed: May 13, 2015.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Potter Valley
Project.
f. Location: Eel River and East Fork
Russian River in Lake and Mendocino
Counties, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Neva
Geldard, License Coordinator, Pacific
Gas and Electric Company, Mail Code:
N13E, P.O. Box 770000, San Francisco,
CA 94177, Phone: (415) 973–3076.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 15 days from the
issuance date of this notice by the
Commission (June 2, 2015). The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number
(P–77–275) on any comments, motions
to intervene, protests, or
recommendations filed.
k. Description of Request: The
licensee requests a temporary variance
of the minimum flow requirements in
the Eel River below Cape Horn Dam, the
Eel River below Scott Dam, and the East
Branch of the Russian River. The
licensee explains that due to current
drought conditions and earlier flood
season constraints, the storage in the
project Lake Pillsbury is approximately
57 percent full. The licensee also states
that despite the low reservoir storage
level, flows at several compliance points
have necessitated that the project
operate under a normal water year
classification. Therefore, in order to
conserve water at the project and avoid
reservoir bank sloughing and water
turbidity, the licensee requests
Commission approval to operate under
the dry year summer flow requirements
from through December 1, 2015. In
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Pages 30066-30067]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12603]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 175-028 and 1988-086]
Pacific Gas and Electric Company; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application for Temporary Variance of
Minimum Flow Requirements.
b. Project Nos.: 175-028 and 1988-086.
c. Date Filed: May 12, 2015.
d. Applicant: Pacific Gas and Electric Company (licensee).
e. Name of Projects: Balch and Haas-Kings River.
f. Location: North Fork Kings River in Fresno County, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Jaime Hoffman, License Coordinator,
Pacific Gas and Electric Company, Mail Code: N13E, P.O. Box 770000, San
Francisco, CA 94177, Phone: (415) 973-1554.
i. FERC Contact: Mr. John Aedo, (415) 369-3335, or
john.aedo@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 15 days from the issuance date of this notice by
the Commission (June 3, 2015). The Commission strongly encourages
electronic filing. Please file motions to intervene, protests,
comments, or recommendations using the Commission's eFiling system at
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. Please include the project numbers
(P-175-028 and 1988-086) on any comments, motions to intervene,
protests, or recommendations filed.
k. Description of Request: The licensee requests a temporary
variance of the minimum flow requirements in Helms Creek, North Fork
Kings River
[[Page 30067]]
and Dinkey Creek from June 1 to December 31, 2015. The licensee
requests Commission approval to adjust the instantaneous minimum flow
requirement to a 24-hour average flow regime. The licensee also
proposes to maintain minimum flows, such that the instantaneous
requirement is decreased: From 4 to 3 cfs in Helms Creek below
Courtright Dam (gage KI-17) from June 1 to November 30; from 2.5 to 2
cubic feet per second (cfs) in Helms Creek below Courtright Dam; from
15 to 10 cfs in the North Fork Kings River below Wishon Dam (gage KI-
27); from 15 to 10 cfs in the Dinkey Creek Siphon at Balch (gage KI-
31); from 2.5 to 2 cfs in the North Fork Kings River below Balch
Diversion Dam (gage KI-9); from 10 to 7 cfs in the North Fork Kings
River above Dinkey Creek (gage KI-21); and from 25 to 17 cfs in the
North Fork Kings River below Dinkey Creek (gage KI-22). The licensee
states that the flow reductions are necessary due to the ongoing
drought conditions and historic low snowpack levels this year.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of proposed action. Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12603 Filed 5-22-15; 8:45 am]