Consolidated Hydro New Hampshire, Inc.; West Hopkinton Hydro, LLC; Notice of Transfer of Exemption, 29700 [2015-12474]
Download as PDF
29700
Federal Register / Vol. 80, No. 99 / Friday, May 22, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3754–006]
Copenhagen Associates, Copenhagen
Hydro, LLC; Notice of Transfer of
Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the High Falls Project, FERC No. 3754,
originally issued January 14, 1982,3 has
been transferred to Copenhagen Hydro,
LLC, an affiliate of Enel Green Power.
The project is located on the Deer River
in Lewis County, New York. The
transfer of an exemption does not
require Commission approval.
2. Copenhagen Hydro, LLC is now the
exemptee of the High Falls Project,
FERC No. 3754. All correspondence
should be forwarded to: Copenhagen
Hydro, LLC, c/o Enel Green Power
North America, Inc., Attn: General
Counsel, 1 Tech Drive, Suite 220,
Andover, MA 01810.
that the exemption from licensing for
the High Shoals Project, FERC No. 4827,
originally issued November 10, 1981,3
has been transferred to High Shoals,
LLC, an affiliate of Enel Green Power.
The project is located on the Catawba
River in Gaston County, North Carolina.
The transfer of an exemption does not
require Commission approval.
2. High Shoals, LLC is now the
exemptee of the High Shoals Project,
FERC No. 4827. All correspondence
should be forwarded to: High Shoals,
LLC, c/o Enel Green Power North
America, Inc., Attn: General Counsel, 1
Tech Drive, Suite 220, Andover, MA
01810.
Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12475 Filed 5–21–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5307–002]
Dated: May 18, 2015.
Kimberly D. Bose
Secretary.
Sweetwater Hydroelectric, Inc.;
Sweetwater Hydroelectric, LLC; Notice
of Transfer of Exemption
[FR Doc. 2015–12473 Filed 5–21–15; 8:45 am]
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Woodsville Reactivation Project,
FERC No. 5307, originally issued
February 5, 1982,3 has been transferred
to Sweetwater Hydroelectric, LLC, an
affiliate of Enel Green Power. The
project is located on the Ammonoosuc
River in Grafton County, New
Hampshire. The transfer of an
exemption does not require Commission
approval.
2. Sweetwater Hydroelectric, LLC is
now the exemptee of the Woodsville
Reactivation Project, FERC No. 5307. All
correspondence should be forwarded to:
Sweetwater Hydroelectric, LLC, c/o Enel
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4827–003]
Mill Shoals Hydro Company, Inc.; High
Shoals, LLC; Notice of Transfer of
Exemption
asabaliauskas on DSK5VPTVN1PROD with NOTICES
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 18 FERC ¶ 62,018, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 Megawatts or Less (1982).
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
VerDate Sep<11>2014
18:19 May 21, 2015
Jkt 235001
3 17 FERC ¶ 62,224, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 Megawatts or Less and Denying Application for
Preliminary Permit (1981).
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 18 FERC ¶ 62,158, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 Megawatts or Less and Denying Competing
Application for Preliminary Permit (1982).
PO 00000
Frm 00099
Fmt 4703
Sfmt 9990
Green Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Dated: May 18, 2015.
Kimberly D. Bose
Secretary.
[FR Doc. 2015–12476 Filed 5–21–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4337–007]
Consolidated Hydro New Hampshire,
Inc.; West Hopkinton Hydro, LLC;
Notice of Transfer of Exemption
1. By letter filed April 24, 2015,1
William B. Conway, Jr., Counsel for Enel
Green Power North America, Inc.
(EGPNA),2 informed the Commission
that the exemption from licensing for
the Hoague-Sprague Project, FERC No.
4337, originally issued March 11, 1982,3
has been transferred to West Hopkinton
Hydro, LLC, an affiliate of Enel Green
Power. The project is located on the
Contoocook River in Merrimack County,
New Hampshire. The transfer of an
exemption does not require Commission
approval.
2. West Hopkinton Hydro, LLC is now
the exemptee of the Hoague-Sprague
Project, FERC No. 4337. All
correspondence should be forwarded to:
West Hopkinton Hydro, LLC, c/o Enel
Green Power North America, Inc., Attn:
General Counsel, 1 Tech Drive, Suite
220, Andover, MA 01810.
Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–12474 Filed 5–21–15; 8:45 am]
BILLING CODE 6717–01–P
1 Seventeen other exempted projects which are to
be transferred were included in the April 24, 2015
letter. These exemptions will be handled under
separate proceedings.
2 Enel Green Power North America, Inc. is a
wholly owned subsidiary of Enel Green Power. Enel
Green Power is a well-capitalized publicly traded
company.
3 18 FERC ¶ 62,419, Order Granting Exemption
from Licensing for a Small Hydroelectric Project
(5 MW or Less) (1982).
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 80, Number 99 (Friday, May 22, 2015)]
[Notices]
[Page 29700]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12474]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4337-007]
Consolidated Hydro New Hampshire, Inc.; West Hopkinton Hydro,
LLC; Notice of Transfer of Exemption
1. By letter filed April 24, 2015,\1\ William B. Conway, Jr.,
Counsel for Enel Green Power North America, Inc. (EGPNA),\2\ informed
the Commission that the exemption from licensing for the Hoague-Sprague
Project, FERC No. 4337, originally issued March 11, 1982,\3\ has been
transferred to West Hopkinton Hydro, LLC, an affiliate of Enel Green
Power. The project is located on the Contoocook River in Merrimack
County, New Hampshire. The transfer of an exemption does not require
Commission approval.
---------------------------------------------------------------------------
\1\ Seventeen other exempted projects which are to be
transferred were included in the April 24, 2015 letter. These
exemptions will be handled under separate proceedings.
\2\ Enel Green Power North America, Inc. is a wholly owned
subsidiary of Enel Green Power. Enel Green Power is a well-
capitalized publicly traded company.
\3\ 18 FERC ] 62,419, Order Granting Exemption from Licensing
for a Small Hydroelectric Project (5 MW or Less) (1982).
---------------------------------------------------------------------------
2. West Hopkinton Hydro, LLC is now the exemptee of the Hoague-
Sprague Project, FERC No. 4337. All correspondence should be forwarded
to: West Hopkinton Hydro, LLC, c/o Enel Green Power North America,
Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA
01810.
Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12474 Filed 5-21-15; 8:45 am]
BILLING CODE 6717-01-P