Southeast Alaska Power Agency; Notice of Availability of Environmental Assessment, 29698-29699 [2015-12468]

Download as PDF 29698 Federal Register / Vol. 80, No. 99 / Friday, May 22, 2015 / Notices Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Reliability Standard CIP–014–2. Filed Date: 5/15/15. Accession Number: 20150515–5215. Comments Due: 5 p.m. ET 6/15/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–12436 Filed 5–21–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14317–001] asabaliauskas on DSK5VPTVN1PROD with NOTICES Grand Coulee Project Hydroelectric Authority; Notice of Surrender of Preliminary Permit Take notice that Grand Coulee Project Hydroelectric Authority, permittee for the proposed Scooteney Outlet Drop Hydroelectric Project, has requested that its preliminary permit be terminated. The permit was issued on March 26, 2013, and would have expired on February 29, 2016.1 The project would have been located on the Potholes East Canal, near Othello in Franklin County, Washington. The preliminary permit for Project No. 14317 will remain in effect until the close of business, June 14, 2015. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be 1 142 2 18 FERC ¶ 62,251 (2013). CFR § 385.2007(a)(2) (2014). VerDate Sep<11>2014 19:32 May 21, 2015 Jkt 235001 submitted until after the permit surrender is effective. Dated: May 15, 2015. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2695–005] Hydro Development Group, Inc., Hydro Development Group Acquisition, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission that the exemption from licensing for the Dexter Project, FERC No. 2695, originally issued June 4, 1982,3 has been transferred to Hydro Development Group Acquisition, LLC, an affiliate of Enel Green Power. The project is located on the Black River in Jefferson County, New York. The transfer of an exemption does not require Commission approval. 2. Hydro Development Group Acquisition, LLC is now the exemptee of the Dexter Project, FERC No. 2695. All correspondence should be forwarded to: Hydro Development Group Acquisition, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Dated: May 18, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12467 Filed 5–21–15; 8:45 am] BILLING CODE 6717–01–P 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 19 FERC ¶ 61,229, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less (1982). Frm 00097 Fmt 4703 Federal Energy Regulatory Commission [Project No. 2911–039] [FR Doc. 2015–12464 Filed 5–21–15; 8:45 am] PO 00000 DEPARTMENT OF ENERGY Sfmt 4703 Southeast Alaska Power Agency; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 Code of Federal Regulations Part 380, Commission staff has reviewed the Southeast Alaska Power Agency’s application for amendment of license for the Swan Lake Hydroelectric Project (FERC Project No. 2911) and has prepared an environmental assessment (EA). The project is located on Falls Creek on Revillagigedo Island near Ketchikan, Alaska. The project occupies federal lands administered by the U.S. Forest Service within the Tongass National Forest. The EA contains Commission staff’s analysis of the potential environmental effects of adding spillway gates to the project dam, raising the maximum elevation of the project impoundment by 15 feet, inundating an additional 93 acres, and making structural modifications to the dam and intake structure. The EA concludes that authorizing the amendment, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room, or it may be viewed on the Commission’s Web site at https:// www.ferc.gov using the e-Library link. Enter the docket number (P–2911) in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll-free at 1–866–208–3676 or (202) 502–8659 (for TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubsription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. All comments must be filed within 30 days of the date of this notice and should reference project no. 2911. The Commission strongly encourages electronic filing. Please file comments using the Commission’s efiling system at https://www.ferc.gov/docs-filing/ E:\FR\FM\22MYN1.SGM 22MYN1 Federal Register / Vol. 80, No. 99 / Friday, May 22, 2015 / Notices efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For further information, contact Steven Sachs by telephone at 202–502– 8666 or by email at Steven.Sachs@ ferc.gov. Dated: May 18, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12468 Filed 5–21–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission asabaliauskas on DSK5VPTVN1PROD with NOTICES Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of ISO New England Inc. ISO New England Inc. Planning Advisory Committee Meeting. May 21, 2015, 9:30 a.m.–2:00 p.m. (Eastern Standard Time). The above-referenced meeting will be held at: Doubletree Hotel, 5400 Computer Drive, Westborough, MA 01581. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.iso-ne.com/committees/ planning/planning-advisory. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER13–193, ISO New England Inc. Docket No. ER13–196, ISO New England Inc. Docket No. ER13–1957, ISO New England Inc. et al. Docket No. ER13–1960, ISO New England Inc. et al. For more information, contact Michael Cackoski, Office of Energy VerDate Sep<11>2014 19:32 May 21, 2015 Jkt 235001 Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6169 or Michael.Cackoski@ferc.gov. Dated: May 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. 29699 Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on June 1, 2015. [FR Doc. 2015–12437 Filed 5–21–15; 8:45 am] BILLING CODE 6717–01–P Dated: May 18, 2015. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY [FR Doc. 2015–12477 Filed 5–21–15; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket No. TX14–1–000] DEPARTMENT OF ENERGY Consolidated Edison Company of New York, Inc.; Notice of Filing Federal Energy Regulatory Commission Take notice that on May 11, 2015, Consolidated Edison Company of New York, Inc. (Con Edison) filed a joint offer of settlement to amend its March 18, 2014 filed application for an order directing Cogen Technologies Linden Venture, L.P. to modify the physical connection that currently exists between its transmission facilities and those of Con Edison. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC PO 00000 Frm 00098 Fmt 4703 Sfmt 4703 [Project No. 3181–004] Hydro Development Group, Inc.; Hydro Development Group Acquisition, LLC; Notice of Transfer of Exemption 1. By letter filed April 24, 2015,1 William B. Conway, Jr., Counsel for Enel Green Power North America, Inc. (EGPNA),2 informed the Commission that the exemption from licensing for the Number 6 Mill Project, FERC No. 3181, originally issued September 17, 1981,3 has been transferred to Hydro Development Group Acquisition, LLC, an affiliate of Enel Green Power. The project is located on the Oswegatchie River in Lawrence County, New York. The transfer of an exemption does not require Commission approval. 2. Hydro Development Group Acquisition, LLC is now the exemptee of the Number 6 Mill Project, FERC No. 3181. All correspondence should be forwarded to: Hydro Development Group Acquisition, LLC, c/o Enel Green Power North America, Inc., Attn: General Counsel, 1 Tech Drive, Suite 220, Andover, MA 01810. Dated: May 18, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–12469 Filed 5–21–15; 8:45 am] BILLING CODE 6717–01–P 1 Seventeen other exempted projects which are to be transferred were included in the April 24, 2015 letter. These exemptions will be handled under separate proceedings. 2 Enel Green Power North America, Inc. is a wholly owned subsidiary of Enel Green Power. Enel Green Power is a well-capitalized publicly traded company. 3 16 FERC ¶ 62,453, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less (1981). E:\FR\FM\22MYN1.SGM 22MYN1

Agencies

[Federal Register Volume 80, Number 99 (Friday, May 22, 2015)]
[Notices]
[Pages 29698-29699]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-12468]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2911-039]


Southeast Alaska Power Agency; Notice of Availability of 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 Code of Federal Regulations Part 380, Commission staff 
has reviewed the Southeast Alaska Power Agency's application for 
amendment of license for the Swan Lake Hydroelectric Project (FERC 
Project No. 2911) and has prepared an environmental assessment (EA). 
The project is located on Falls Creek on Revillagigedo Island near 
Ketchikan, Alaska. The project occupies federal lands administered by 
the U.S. Forest Service within the Tongass National Forest.
    The EA contains Commission staff's analysis of the potential 
environmental effects of adding spillway gates to the project dam, 
raising the maximum elevation of the project impoundment by 15 feet, 
inundating an additional 93 acres, and making structural modifications 
to the dam and intake structure. The EA concludes that authorizing the 
amendment, with appropriate environmental protective measures, would 
not constitute a major federal action that would significantly affect 
the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room, or it may be viewed on the Commission's Web site 
at https://www.ferc.gov using the e-Library link. Enter the docket 
number (P-2911) in the docket number field to access the document. For 
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov 
or call toll-free at 1-866-208-3676 or (202) 502-8659 (for TTY).
    You may also register online at https://www.ferc.gov/docs-filing/esubsription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    All comments must be filed within 30 days of the date of this 
notice and should reference project no. 2911. The Commission strongly 
encourages electronic filing. Please file comments using the 
Commission's efiling system at https://www.ferc.gov/docs-filing/

[[Page 29699]]

efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support. In lieu of electronic 
filing, please send a paper copy to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    For further information, contact Steven Sachs by telephone at 202-
502-8666 or by email at Steven.Sachs@ferc.gov.

    Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12468 Filed 5-21-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.