Safe Harbor Water Power Corp.; Notice of Technical Conference for Safe Harbor Project, 28262 [2015-11920]
Download as PDF
asabaliauskas on DSK5VPTVN1PROD with NOTICES
28262
Federal Register / Vol. 80, No. 95 / Monday, May 18, 2015 / Notices
regulations under the Natural Gas Act
(NGA), and Southern Star’s blanket
certificate issued in Docket No. CP82–
479–000. Southern Star seeks
authorization to relocate approximately
6,600 feet of 16-inch Pipeline EX–001
by means of horizontal directional drills
in order to relocate the pipeline off the
Platte Purchase Bridge that spans the
Missouri River between Platte County,
Missouri and Wyandotte County,
Kansas, all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should Phyllis K. Medley,
Senior Analyst, Regulatory Compliance,
Southern Star Central Gas Pipeline, Inc.,
4700 State Highway 56, Owensboro,
Kentucky 42301, or phone (270) 852–
4653, or by email phyllis.k.medley@
sscgp.com.
Relocation of Southern Star’s 6,600
foot section of 16-inch Pipeline EX–00
is needed since the Kansas Department
of Transportation and Missouri
Department of Transportation are
working to demolish the Platte Purchase
Bridge and replace it with a new bridge
system in the pipeline’s location by
December 1, 2016.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
VerDate Sep<11>2014
18:52 May 15, 2015
Jkt 235001
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: May 12, 2015.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1025–086]
Safe Harbor Water Power Corp.; Notice
of Technical Conference for Safe
Harbor Project
a. Date and Time of Meeting: Monday,
June 8, 2015, beginning at 10:00 a.m.
Frm 00044
Fmt 4703
Dated: May 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–11920 Filed 5–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[FR Doc. 2015–11918 Filed 5–15–15; 8:45 am]
PO 00000
(EDT) and concluding at 1:00 p.m.
(EDT).
b. Place: Safe Harbor Water Power
Corporation, 1 Powerhouse Road,
Conestoga, PA 17516–9651.
c. FERC Contact: Rebecca Martin at
(202) 502–6012 or email at
Rebecca.Martin@ferc.gov.
d. Purpose of Meeting: To discuss the
Commission’s March 16, 2015 Order
approving an increase in the normal
maximum water surface elevation of
Lake Clarke to 227.6 feet mean sea level
(msl) from April 15 to October 15. The
Order also approved a temporary
increase of Lake Clarke, up to elevation
228.0 feet msl, from April 15 to October
15, if the results of the Safe Harbor
annual spring mudflat surveys
demonstrate that the minimum area of
shorebird habitat can be maintained.
e. A summary of the meeting will be
prepared for the project record.
f. All local, state, and federal agencies,
Indian tribes, and other interested
parties are invited to participate. Please
call Rebecca Martin at (202) 502–6012
or send an email to rebecca.martin@
ferc.gov by May 26, 2015, to register
your attendance for the meeting.
g. FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or 202–208–8659
(TTY), or send a FAX to 202–208–2106
with the required accommodations.
Sfmt 4703
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–70–000.
Applicants: Utah Red Hills Renewable
Park, LLC.
Description: Clarification to February
6, 2015 Application for Authorization
for Disposition of Jurisdictional
Facilities and Requests for Waivers and
Confidential Treatment of Utah Red
Hills Renewable Park, LLC.
Filed Date: 5/12/15.
Accession Number: 20150512–5089.
Comments Due: 5 p.m. ET 5/22/15.
Docket Numbers: EC15–137–000.
E:\FR\FM\18MYN1.SGM
18MYN1
Agencies
[Federal Register Volume 80, Number 95 (Monday, May 18, 2015)]
[Notices]
[Page 28262]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-11920]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1025-086]
Safe Harbor Water Power Corp.; Notice of Technical Conference for
Safe Harbor Project
a. Date and Time of Meeting: Monday, June 8, 2015, beginning at
10:00 a.m. (EDT) and concluding at 1:00 p.m. (EDT).
b. Place: Safe Harbor Water Power Corporation, 1 Powerhouse Road,
Conestoga, PA 17516-9651.
c. FERC Contact: Rebecca Martin at (202) 502-6012 or email at
Rebecca.Martin@ferc.gov.
d. Purpose of Meeting: To discuss the Commission's March 16, 2015
Order approving an increase in the normal maximum water surface
elevation of Lake Clarke to 227.6 feet mean sea level (msl) from April
15 to October 15. The Order also approved a temporary increase of Lake
Clarke, up to elevation 228.0 feet msl, from April 15 to October 15, if
the results of the Safe Harbor annual spring mudflat surveys
demonstrate that the minimum area of shorebird habitat can be
maintained.
e. A summary of the meeting will be prepared for the project
record.
f. All local, state, and federal agencies, Indian tribes, and other
interested parties are invited to participate. Please call Rebecca
Martin at (202) 502-6012 or send an email to rebecca.martin@ferc.gov by
May 26, 2015, to register your attendance for the meeting.
g. FERC conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations please
send an email to accessibility@ferc.gov or call toll free (866) 208-
3372 (voice) or 202-208-8659 (TTY), or send a FAX to 202-208-2106 with
the required accommodations.
Dated: May 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-11920 Filed 5-15-15; 8:45 am]
BILLING CODE 6717-01-P