Combined Notice of Filings #1, 27943-27944 [2015-11766]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 94 / Friday, May 15, 2015 / Notices
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Susan Larson,
Tri-Dam Project, P.O. Box 1158,
Pinecrest, CA 95364–0158, (209) 785–
3838.
i. FERC Contact: Any questions on
this notice should be addressed to
Shana High at (202) 502–8674, or by
email: shana.high@ferc.gov.
j. Deadline for filing comments and/
or motions: June 11, 2015.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and four copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–2067–060) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Proposal: Tri-Dam
filed its proposed SMP pursuant to
article 411 of its license. The proposed
SMP provides an inventory of sensitive
environmental resources within the
project boundary (natural and cultural),
maps of sensitive zones that should be
afforded extra protection, strategies to
protect these areas from inappropriate
encroachment, and provisions for
informing private shoreline landowners
about the importance of protecting the
zones identified as having sensitive
environmental resources.
Private property owners hold fee title
to real property which is adjacent to,
abuts, and lies underneath portions of
VerDate Sep<11>2014
18:20 May 14, 2015
Jkt 235001
Tulloch Reservoir. Tri-Dam’s proposed
SMP affects only lands owned or
controlled by the licensee. Property
rights on privately-owned land are not
being altered by this proceeding.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–2067) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
27943
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–11772 Filed 5–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–136–000.
Applicants: BTMU Capital Leasing &
Finance, Inc.
Description: Application of BTMU
Capital Leasing & Finance, Inc. for
authorization under Section 203 of the
Federal Power Act and Request For
expedited Action.
Filed Date: 5/11/15.
Accession Number: 20150511–5054.
Comments Due: 5 p.m. ET 6/1/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2074–004;
ER10–2097–006.
Applicants: Kansas City Power &
Light Company, KCP&L Greater
Missouri Operations Company.
Description: Notice of Non-Material
Change in Status of Kansas City Power
& Light Company, et al.
Filed Date: 5/8/15.
Accession Number: 20150508–5207.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER10–2488–010.
Applicants: Oasis Power Partners,
LLC.
Description: Notice of Non-Material
Change of Status of Oasis Power
Partners, LLC.
Filed Date: 5/8/15.
Accession Number: 20150508–5240.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER11–47–005;
ER12–1540–003; ER12–1541–003;
ER12–1542–003; ER12–1544–003;
ER10–2981–005; ER14–2475–002;
ER14–2476–002; ER14–2477–002;
ER11–46–008; ER14–594–005; ER10–
2975–008; ER11–41–005; ER12–2343–
003; ER13–1896–008.
Applicants: Appalachian Power
Company, Indiana Michigan Power
Company, Kentucky Power Company,
Kingsport Power Company, Wheeling
E:\FR\FM\15MYN1.SGM
15MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
27944
Federal Register / Vol. 80, No. 94 / Friday, May 15, 2015 / Notices
Power Company, AEP Texas Central
Company, AEP Texas North Company,
Public Service Company of Oklahoma,
Southwestern Electric Power Company,
Ohio Power Company, AEP Energy
Partners, Inc., CSW Energy Services,
Inc., AEP Retail Energy Partners LLC,
AEP Energy, Inc., AEP Generation
Resources Inc.
Description: Notice of Non-Material
Change in Status of the AEP MBR
Companies.
Filed Date: 5/8/15.
Accession Number: 20150508–5246.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER12–2310–004.
Applicants: Zephyr Wind, LLC.
Description: Compliance filing per 35:
Compliance to 3 to be effective 5/9/
2015.
Filed Date: 5/11/15.
Accession Number: 20150511–5002.
Comments Due: 5 p.m. ET 6/1/15.
Docket Numbers: ER15–1691–000.
Applicants: Duke Energy Progress,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amendment to RS 200
FRPPA NCEMPA to be effective 12/10/
2014.
Filed Date: 5/11/15.
Accession Number: 20150511–5050.
Comments Due: 5 p.m. ET 6/1/15.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES15–30–000.
Applicants: The United Illuminating
Company.
Description: Application requesting
authorization to issue short-term debt
securities in an amount not to exceed
$400 million of The United Illuminating
Company.
Filed Date: 5/8/15.
Accession Number: 20150508–5243.
Comments Due: 5 p.m. ET 5/29/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
18:20 May 14, 2015
Jkt 235001
Dated: May 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–11766 Filed 5–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13570–002]
Warmsprings Irrigation District; Notice
of Effectiveness of Withdrawal of
License Application
On April 15, 2013, the Warmsprings
Irrigation District (District) filed a
license application for an original major
project—existing dam for the proposed
Warm Springs Dam Hydroelectric
Project No. 13570–002. On April 14,
2015, the District filed a letter informing
the Commission that it was withdrawing
its license application for the project
due to unforeseen costs to connect to
the grid.
No motion in opposition to the notice
of withdrawal has been filed, and the
Commission has taken no action to
disallow the withdrawal. Pursuant to
Rule 216(b) of the Commission’s Rules
of Practice and Procedure, the
withdrawal of the application became
effective April 29, 2015 and this
proceeding is hereby terminated.1
Dated: May 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–11773 Filed 5–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR15–26–000]
Enterprise Texas Pipeline LLC; Notice
of Staff Protest To Petition for Rate
Approval
1. Commission staff hereby protests
pursuant to the section 284.123(g)(4)(i)
of the Commission’s regulations,1 the
Petition for Rate Approval pursuant to
section 284.123(b)(2) filed by Enterprise
Texas Pipeline LLC (Enterprise) on
March 13, 2015, in the above referenced
docket. Pursuant to the Stipulation and
Agreement approved by the
Commission in Docket Nos. PR10–14–
1 18
1 18
PO 00000
CFR 385.216(b) (2014).
CFR 284.123(g)(4)(i) (2014).
Frm 00060
Fmt 4703
Sfmt 4703
000 and PR10–14–001,2 Enterprise filed
a new petition for rate approval
pursuant to 18 CFR 284.123(b)(2)
proposing a new rate applicable to its
Natural Gas Policy Act (NGPA) section
311 service. Enterprise elected to use
the Commission’s new optional notice
procedures set forth in section
284.123(g). Enterprise proposes to
increase its firm and interruptible
transportation services for Rate Zone
1—Legacy Assets and Rate Zone 2—
Sherman Extension. Enterprise also
proposes to revise its Statement of
Operating Conditions (SOC) applicable
to its transportation services performed
pursuant to NGPA section 311, which it
states is updated solely to reflect the
new proposed rates. Enterprise states it
has not proposed any changes to the
operating terms and conditions of its
SOC.
2. Commission staff notes that
Enterprise has not adequately supported
its filing and shown that the proposed
rates are fair and equitable. For instance,
Enterprise has not provided sufficient
support for the discount adjustment
used in calculating the billing
determinants. In addition, Enterprise
has not provided adequate explanation
and support for its proposed cost of
service, rate base, cost of capital, and
cost allocation, among other issues.
3. Commission staff’s specific
concerns include, in particular,
Enterprise’s development of its discount
adjustment in designing rates. For
example, in Zone 2 the proposed rates
are significantly higher than the rates
Enterprise proposed in its prior rate
case, Docket No. PR10–14–000, even
though the cost of service for Zone 2 is
20 percent lower and the throughput is
55 percent higher using the same rate
design methodology and imputed
billing determinants from its prior case.
Similarly, using the same methodology
to design rates for Zone 1, Enterprise
proposes a rate of $0.7636 per Dth, yet
the unit cost prior to any discount
adjustment is $0.2006 per Dth.
4. Commission staff has concerns that
Enterprise has not classified any costs as
variable costs when calculating its rates.
Enterprise calculated straight-fixed
variable rates for Zone 2 but did not
classify any costs as variable cost rates.
However, since Enterprise included
$91.6 million in Account No. 368,
Compressor Station Equipment, it
follows that there should be variable
costs associated with operating and
maintaining compressors. Moreover,
Account No. 855, Other Fuel and Power
for Compressor Stations, typically
2 Enterprise Texas Pipeline LLC, Delegated Letter
Order, December 16, 2010.
E:\FR\FM\15MYN1.SGM
15MYN1
Agencies
[Federal Register Volume 80, Number 94 (Friday, May 15, 2015)]
[Notices]
[Pages 27943-27944]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-11766]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC15-136-000.
Applicants: BTMU Capital Leasing & Finance, Inc.
Description: Application of BTMU Capital Leasing & Finance, Inc.
for authorization under Section 203 of the Federal Power Act and
Request For expedited Action.
Filed Date: 5/11/15.
Accession Number: 20150511-5054.
Comments Due: 5 p.m. ET 6/1/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2074-004; ER10-2097-006.
Applicants: Kansas City Power & Light Company, KCP&L Greater
Missouri Operations Company.
Description: Notice of Non-Material Change in Status of Kansas City
Power & Light Company, et al.
Filed Date: 5/8/15.
Accession Number: 20150508-5207.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER10-2488-010.
Applicants: Oasis Power Partners, LLC.
Description: Notice of Non-Material Change of Status of Oasis Power
Partners, LLC.
Filed Date: 5/8/15.
Accession Number: 20150508-5240.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER11-47-005; ER12-1540-003; ER12-1541-003; ER12-
1542-003; ER12-1544-003; ER10-2981-005; ER14-2475-002; ER14-2476-002;
ER14-2477-002; ER11-46-008; ER14-594-005; ER10-2975-008; ER11-41-005;
ER12-2343-003; ER13-1896-008.
Applicants: Appalachian Power Company, Indiana Michigan Power
Company, Kentucky Power Company, Kingsport Power Company, Wheeling
[[Page 27944]]
Power Company, AEP Texas Central Company, AEP Texas North Company,
Public Service Company of Oklahoma, Southwestern Electric Power
Company, Ohio Power Company, AEP Energy Partners, Inc., CSW Energy
Services, Inc., AEP Retail Energy Partners LLC, AEP Energy, Inc., AEP
Generation Resources Inc.
Description: Notice of Non-Material Change in Status of the AEP MBR
Companies.
Filed Date: 5/8/15.
Accession Number: 20150508-5246.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER12-2310-004.
Applicants: Zephyr Wind, LLC.
Description: Compliance filing per 35: Compliance to 3 to be
effective 5/9/2015.
Filed Date: 5/11/15.
Accession Number: 20150511-5002.
Comments Due: 5 p.m. ET 6/1/15.
Docket Numbers: ER15-1691-000.
Applicants: Duke Energy Progress, Inc.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii):
Amendment to RS 200 FRPPA NCEMPA to be effective 12/10/2014.
Filed Date: 5/11/15.
Accession Number: 20150511-5050.
Comments Due: 5 p.m. ET 6/1/15.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES15-30-000.
Applicants: The United Illuminating Company.
Description: Application requesting authorization to issue short-
term debt securities in an amount not to exceed $400 million of The
United Illuminating Company.
Filed Date: 5/8/15.
Accession Number: 20150508-5243.
Comments Due: 5 p.m. ET 5/29/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-11766 Filed 5-14-15; 8:45 am]
BILLING CODE 6717-01-P