Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 27946 Federal Register / Vol. 80, No. 94 / Friday, May 15, 2015 / Notices pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Morrisville Hydroelectric Project is located on Green River, Elmore Pond Brook, and Lamoille River in Lamoille County, Vermont. The license for Project No. 2629 was issued for a period ending April 30, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2629 is issued to the licensee for a period effective May 1, 2015 through April 30, 2016 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before April 30, 2016, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, the Village of Morrisville (Vermont), is authorized to continue operation of the Morrisville Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. VerDate Sep<11>2014 18:20 May 14, 2015 Jkt 235001 Dated: May 8, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–11692 Filed 5–14–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2290–004. Applicants: Avista Corporation. Description: Notice of Non-Material Change of Status of Avista Corporation. Filed Date: 5/8/15. Accession Number: 20150508–5039. Comments Due: 5 p.m. ET 5/29/15. Docket Numbers: ER15–885–000. Applicants: Northern States Power Company, a Minnesota corporation. Description: eTariff filing per 35.19a(b): 2015–5–8_NSP–AIM-Refund Report to be effective N/A. Filed Date: 5/8/15. Accession Number: 20150508–5132. Comments Due: 5 p.m. ET 5/29/15. Docket Numbers: ER15–964–002. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment per 35.17(b): City Utilities of Springfield Formula Rate Amended Filing to be effective 4/1/2015. Filed Date: 5/7/15. Accession Number: 20150507–5202. Comments Due: 5 p.m. ET 5/28/15. Docket Numbers: ER15–1684–000. Applicants: Southern California Edison Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Generator Interconnection Agreement to be effective 5/8/2015. Filed Date: 5/7/15. Accession Number: 20150507–5192. Comments Due: 5 p.m. ET 5/28/15. Docket Numbers: ER15–1685–000. Applicants: Town Square Energy East, LLC. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Amendment to Notice of Succession to be effective 4/2/2015. Filed Date: 5/8/15. Accession Number: 20150508–5000. Comments Due: 5 p.m. ET 5/29/15. Docket Numbers: ER15–1686–000. Applicants: Rayburn Country Electric Cooperative Inc. Description: Notice of Cancellation of Transmission and Interconnection Agreement of Rayburn Country Electric Cooperative, Inc. PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 Filed Date: 5/7/15. Accession Number: 20150507–5254. Comments Due: 5 p.m. ET 5/28/15. Docket Numbers: ER15–1687–000. Applicants: Blue Cube Operations LLC. Description: Initial rate filing per 35.12 Blue Cube Operations LLC Baseline Tariff Filing to be effective 5/9/2015. Filed Date: 5/8/15. Accession Number: 20150508–5090. Comments Due: 5 p.m. ET 5/29/15. Docket Numbers: ER15–1688–000. Applicants: Alabama Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): GCL Lincoln Power SGIA Filing to be effective 4/24/2015. Filed Date: 5/8/15. Accession Number: 20150508–5103. Comments Due: 5 p.m. ET 5/29/15. Docket Numbers: ER15–1689–000. Applicants: Midcontinent Independent System Operator, Inc., Dairyland Power Cooperative. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–05–08_DPC Incentive Rate Filing to be effective 7/1/2015. Filed Date: 5/8/15. Accession Number: 20150508–5114. Comments Due: 5 p.m. ET 5/29/15. Docket Numbers: ER15–1690–000. Applicants: Wisconsin Public Service Corporation. Description: § 205(d) rate filing per 35.13(a)(2)(iii): WPSC’s Updated FERC Form 1 References in its Formula Rates to be effective 7/7/2015. Filed Date: 5/8/15. Accession Number: 20150508–5156. Comments Due: 5 p.m. ET 5/29/15. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF15–381–000. Applicants: KTZ Hydro LLC. Description: Refund Report of KTZ Hydro LLC. Filed Date: 5/8/15. Accession Number: 20150508–5043. Comments Due: 5 p.m. ET 5/8/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. E:\FR\FM\15MYN1.SGM 15MYN1 Federal Register / Vol. 80, No. 94 / Friday, May 15, 2015 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 8, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–11734 Filed 5–14–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–296–000] mstockstill on DSK4VPTVN1PROD with NOTICES Tallgrass Interstate Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on April 29, 2015, Tallgrass Interstate Gas Transmission, LLC (Tallgrass), 4200 West 115th Street, Suite 350, Leawood, Kansas 66211–2609 filed a prior notice request pursuant to sections 157.205, 157.208 and 157.213 of the Commission’s regulations under the Natural Gas Act for authorization to convert the HS–18 observation well in its Huntsman Storage Facility, located in Cheyenne County, Nebraska to an injection and withdrawal well and to construct and operate certain appurtenant pipeline measurement facilities necessary to connect the converted well to the storage facility, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The project will have no impact on the certificated parameters of the Huntsman Storage Facility. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to David Haag, Vice President of Regulatory, Tallgrass Interstate Gas Transmission, LLC, 370 Van Gordon Street, Lakewood, Colorado 80228–1519, by phone at (303) 763–3258. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene VerDate Sep<11>2014 18:20 May 14, 2015 Jkt 235001 or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 27947 Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: May 11, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–11775 Filed 5–14–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–1687–000] Blue Cube Operations LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Blue Cube Operations LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is May 28, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, E:\FR\FM\15MYN1.SGM 15MYN1

Agencies

[Federal Register Volume 80, Number 94 (Friday, May 15, 2015)]
[Notices]
[Pages 27946-27947]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-11734]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2290-004.
    Applicants: Avista Corporation.
    Description: Notice of Non-Material Change of Status of Avista 
Corporation.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5039.
    Comments Due: 5 p.m. ET 5/29/15.

    Docket Numbers: ER15-885-000.
    Applicants: Northern States Power Company, a Minnesota corporation.
    Description: eTariff filing per 35.19a(b): 2015-5-8_NSP-AIM-Refund 
Report to be effective N/A.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5132.
    Comments Due: 5 p.m. ET 5/29/15.

    Docket Numbers: ER15-964-002.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment per 35.17(b): City Utilities of 
Springfield Formula Rate Amended Filing to be effective 4/1/2015.
    Filed Date: 5/7/15.
    Accession Number: 20150507-5202.
    Comments Due: 5 p.m. ET 5/28/15.

    Docket Numbers: ER15-1684-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): 
Generator Interconnection Agreement to be effective 5/8/2015.
    Filed Date: 5/7/15.
    Accession Number: 20150507-5192.
    Comments Due: 5 p.m. ET 5/28/15.

    Docket Numbers: ER15-1685-000.
    Applicants: Town Square Energy East, LLC.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): 
Amendment to Notice of Succession to be effective 4/2/2015.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5000.
    Comments Due: 5 p.m. ET 5/29/15.

    Docket Numbers: ER15-1686-000.
    Applicants: Rayburn Country Electric Cooperative Inc.
    Description: Notice of Cancellation of Transmission and 
Interconnection Agreement of Rayburn Country Electric Cooperative, Inc.
    Filed Date: 5/7/15.
    Accession Number: 20150507-5254.
    Comments Due: 5 p.m. ET 5/28/15.

    Docket Numbers: ER15-1687-000.
    Applicants: Blue Cube Operations LLC.
    Description: Initial rate filing per 35.12 Blue Cube Operations LLC 
Baseline Tariff Filing to be effective 5/9/2015.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5090.
    Comments Due: 5 p.m. ET 5/29/15.

    Docket Numbers: ER15-1688-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): GCL 
Lincoln Power SGIA Filing to be effective 4/24/2015.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5103.
    Comments Due: 5 p.m. ET 5/29/15.

    Docket Numbers: ER15-1689-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Dairyland Power Cooperative.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): 2015-
05-08_DPC Incentive Rate Filing to be effective 7/1/2015.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5114.
    Comments Due: 5 p.m. ET 5/29/15.

    Docket Numbers: ER15-1690-000.
    Applicants: Wisconsin Public Service Corporation.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): WPSC's 
Updated FERC Form 1 References in its Formula Rates to be effective 7/
7/2015.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5156.
    Comments Due: 5 p.m. ET 5/29/15.

    Take notice that the Commission received the following qualifying 
facility filings:

    Docket Numbers: QF15-381-000.
    Applicants: KTZ Hydro LLC.
    Description: Refund Report of KTZ Hydro LLC.
    Filed Date: 5/8/15.
    Accession Number: 20150508-5043.
    Comments Due: 5 p.m. ET 5/8/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

[[Page 27947]]

    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 8, 2015.
Nathaniel J. Davis, Sr.,