Village of Morrisville, Vermont; Notice of Authorization for Continued Project Operation, 27945-27946 [2015-11692]
Download as PDF
Federal Register / Vol. 80, No. 94 / Friday, May 15, 2015 / Notices
contains only variable costs. Similarly,
for Zone 1, Enterprise did not classify
any costs as variable costs, even though
Enterprise booked over $509 million to
Compressor Station Equipment.
5. Commission staff has concerns
regarding the allocation of
Administrative and General (A&G)
Expenses between Enterprise’s two
delivery zones. Exhibit H–1 shows that
Enterprise allocated only 7.5 percent of
A&G Expenses to Zone 2 which seems
low considering that over 15 percent of
Operating and Maintenance (O&M)
Expenses, 15 percent of gross plant and
over 14 percent of revenues were
derived from Zone 2.
6. Enterprise proposes to include both
gathering and storage plant in rate base.
This is inconsistent with prior cases,
where Enterprise has sometimes
included gathering in rate base (see
Docket No. PR07–12–000) and also
excluded it from rate base (see Docket
No. PR10–14–000). Enterprise has
provided little to support its proposed
treatment of gathering plant. In
addition, Commission staff notes that
Enterprise has market-based rate
authority to provide storage services.
Enterprise has not provided sufficient
support to include storage plant in rate
base for the first time. Further,
Enterprise has not included any storage
related O&M expenses to operate the
plant.
7. Finally, Enterprise has requested a
weighted average cost of capital of 10.41
percent without adequate support for
either the proposed capital structure or
the individual capital cost components.
Dated: May 8, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 21, 2015.
Dated: May 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–11747 Filed 5–14–15; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2015–11736 Filed 5–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2015–11774 Filed 5–14–15; 8:45 am]
Entergy Gulf States Louisiana, L.L.C.,
Entergy Louisiana, LLC, Entergy
Louisiana Power, LLC; Notice of Filing
[Docket No. NJ15–14–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Oncor Electric Delivery Company LLC;
Notice of Filing
Take notice that on April 30, 2015,
Oncor Electric Delivery Company LLC
submitted its tariff filing per 35.28(e):
Oncor TFO Tariff Rate Changes to be
effective March 20, 2015.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
VerDate Sep<11>2014
18:20 May 14, 2015
a manner consistent with the
instructions to FERC’s Uniform System
of Accounts and guidance provided by
the Chief Accountant.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: June 1, 2015.
Dated: May 11, 2015.
Kimberly D. Bose,
Secretary.
[Docket No. AC15–117–000]
Federal Energy Regulatory
Commission
27945
Jkt 235001
Take notice that on April 24, 2015,
Entergy Services, Inc. on behalf of its
current and prospective public utility
affiliates Entergy Gulf States Louisiana,
L.L.C. (EGSL), Entergy Louisiana, LLC,
(ELL) and Entergy Louisiana Power, LLC
(ELP), (collectively, applicants)
submitted a request proposing that ELP
be allowed to account for the
intercompany receivable created on its
books following the Business
Combination in Account 190,
Accumulated Deferred Income Taxes, in
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2629–000]
Village of Morrisville, Vermont; Notice
of Authorization for Continued Project
Operation
On April 25, 2013 the Village of
Morrisville (Vermont), licensee for the
Morrisville Hydroelectric Project, filed
an Application for a New License
E:\FR\FM\15MYN1.SGM
15MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
27946
Federal Register / Vol. 80, No. 94 / Friday, May 15, 2015 / Notices
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Morrisville
Hydroelectric Project is located on
Green River, Elmore Pond Brook, and
Lamoille River in Lamoille County,
Vermont.
The license for Project No. 2629 was
issued for a period ending April 30,
2015. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2629
is issued to the licensee for a period
effective May 1, 2015 through April 30,
2016 or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before April 30, 2016, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise. If the
project is not subject to section 15 of the
FPA, notice is hereby given that the
licensee, the Village of Morrisville
(Vermont), is authorized to continue
operation of the Morrisville
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
VerDate Sep<11>2014
18:20 May 14, 2015
Jkt 235001
Dated: May 8, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–11692 Filed 5–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2290–004.
Applicants: Avista Corporation.
Description: Notice of Non-Material
Change of Status of Avista Corporation.
Filed Date: 5/8/15.
Accession Number: 20150508–5039.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER15–885–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: eTariff filing per
35.19a(b): 2015–5–8_NSP–AIM-Refund
Report to be effective N/A.
Filed Date: 5/8/15.
Accession Number: 20150508–5132.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER15–964–002.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment per
35.17(b): City Utilities of Springfield
Formula Rate Amended Filing to be
effective 4/1/2015.
Filed Date: 5/7/15.
Accession Number: 20150507–5202.
Comments Due: 5 p.m. ET 5/28/15.
Docket Numbers: ER15–1684–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Generator
Interconnection Agreement to be
effective 5/8/2015.
Filed Date: 5/7/15.
Accession Number: 20150507–5192.
Comments Due: 5 p.m. ET 5/28/15.
Docket Numbers: ER15–1685–000.
Applicants: Town Square Energy East,
LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amendment to Notice of
Succession to be effective 4/2/2015.
Filed Date: 5/8/15.
Accession Number: 20150508–5000.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER15–1686–000.
Applicants: Rayburn Country Electric
Cooperative Inc.
Description: Notice of Cancellation of
Transmission and Interconnection
Agreement of Rayburn Country Electric
Cooperative, Inc.
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
Filed Date: 5/7/15.
Accession Number: 20150507–5254.
Comments Due: 5 p.m. ET 5/28/15.
Docket Numbers: ER15–1687–000.
Applicants: Blue Cube Operations
LLC.
Description: Initial rate filing per
35.12 Blue Cube Operations LLC
Baseline Tariff Filing to be effective
5/9/2015.
Filed Date: 5/8/15.
Accession Number: 20150508–5090.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER15–1688–000.
Applicants: Alabama Power
Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): GCL Lincoln Power
SGIA Filing to be effective 4/24/2015.
Filed Date: 5/8/15.
Accession Number: 20150508–5103.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER15–1689–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Dairyland Power Cooperative.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–05–08_DPC
Incentive Rate Filing to be effective
7/1/2015.
Filed Date: 5/8/15.
Accession Number: 20150508–5114.
Comments Due: 5 p.m. ET 5/29/15.
Docket Numbers: ER15–1690–000.
Applicants: Wisconsin Public Service
Corporation.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): WPSC’s Updated FERC
Form 1 References in its Formula Rates
to be effective 7/7/2015.
Filed Date: 5/8/15.
Accession Number: 20150508–5156.
Comments Due: 5 p.m. ET 5/29/15.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF15–381–000.
Applicants: KTZ Hydro LLC.
Description: Refund Report of KTZ
Hydro LLC.
Filed Date: 5/8/15.
Accession Number: 20150508–5043.
Comments Due: 5 p.m. ET 5/8/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
E:\FR\FM\15MYN1.SGM
15MYN1
Agencies
[Federal Register Volume 80, Number 94 (Friday, May 15, 2015)]
[Notices]
[Pages 27945-27946]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-11692]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2629-000]
Village of Morrisville, Vermont; Notice of Authorization for
Continued Project Operation
On April 25, 2013 the Village of Morrisville (Vermont), licensee
for the Morrisville Hydroelectric Project, filed an Application for a
New License
[[Page 27946]]
pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Morrisville Hydroelectric Project is
located on Green River, Elmore Pond Brook, and Lamoille River in
Lamoille County, Vermont.
The license for Project No. 2629 was issued for a period ending
April 30, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2629 is issued to
the licensee for a period effective May 1, 2015 through April 30, 2016
or until the issuance of a new license for the project or other
disposition under the FPA, whichever comes first. If issuance of a new
license (or other disposition) does not take place on or before April
30, 2016, notice is hereby given that, pursuant to 18 CFR 16.18(c), an
annual license under section 15(a)(1) of the FPA is renewed
automatically without further order or notice by the Commission, unless
the Commission orders otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby given that the licensee, the
Village of Morrisville (Vermont), is authorized to continue operation
of the Morrisville Hydroelectric Project, until such time as the
Commission acts on its application for a subsequent license.
Dated: May 8, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-11692 Filed 5-14-15; 8:45 am]