Congdon Pond Hydro, LLC; Notice of Intent To Terminate Exemption (5 Mw or Less) and Soliciting Comments, Protests, or Motions To Intervene, 26923-26924 [2015-11283]
Download as PDF
Federal Register / Vol. 80, No. 90 / Monday, May 11, 2015 / Notices
Filed Date: 5/1/15.
Accession Number: 20150501–5267.
Comments Due: 5 p.m. ET 5/13/15.
Docket Numbers: RP15–964–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Section 4(d) rate filing
per 154.204: Neg Rage 2015–05–01
Ultra, Encana, CP to be effective
5/1/2015.
Filed Date: 5/1/15.
Accession Number: 20150501–5282.
Comments Due: 5 p.m. ET 5/13/15.
Docket Numbers: RP15–965–000.
Applicants: Southeast Supply Header,
LLC.
Description: Section 4(d) rate filing
per 154.403(d)(2): 2015 TUP/SBA
Annual Filing to be effective 6/1/2015.
Filed Date: 5/1/15.
Accession Number: 20150501–5388.
Comments Due: 5 p.m. ET 5/13/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
tkelley on DSK3SPTVN1PROD with NOTICES
Filings in Existing Proceedings
Docket Numbers: RP13–584–003.
Applicants: Columbia Gas
Transmission, LLC.
Description: Compliance filing per
154.203: Revenue Sharing Report 2015.
Filed Date: 5/1/15.
Accession Number: 20150501–5141.
Comments Due: 5 p.m. ET 5/13/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–11282 Filed 5–8–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:00 May 08, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10200–014]
Congdon Pond Hydro, LLC; Notice of
Intent To Terminate Exemption (5 Mw
or Less) and Soliciting Comments,
Protests, or Motions To Intervene
Take notice that the following
hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of
exemption by implied surrender.
b. Project No.: 10200–014.
c. Date Initiated: May 4, 2015.
d. Exemptee: Congdon Pond Hydro,
LLC.
e. Name and Location of Project: The
Congdon Dam Hydroelectric Project is
located on the Oxoboxo Brook in New
London County, Connecticut.
f. Filed Pursuant to: 18 CFR 4.106
(Standard Article 1).
g. Exemptee Contact Information: Mr.
John Morte, President and Treasurer,
Congdon Pond Hydro, LLC., 63
Hayward Street, Milford, MA (508) 333–
6743.
h. FERC Contact: Jennifer Polardino,
(202) 502–6437, Jennifer.Polardino@
ferc.gov.
i. Deadline for filing comments,
protests, or motions to intervene is 30
days from the issuance of this notice by
the Commission. Please file your
submittal electronically via the Internet
(eFiling) in lieu of paper. Please refer to
the instructions on the Commission’s
Web site under https://www.ferc.gov/
docs-filing/efiling.asp and filing
instructions in the Commission’s
Regulations at 18 CFR
385.2001(a)(1)(iii). To assist you with
eFilings you should refer to the
submission guidelines document at
https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
certain filing requirements have
statutory or regulatory formatting and
other instructions. You should refer to
a list of these ‘‘qualified documents’’ at
https://www.ferc.gov/docs-filing/efiling/
filing.pdf. You must include your name
and contact information at the end of
your comments. Please include the
project number (P–10200–014) on any
documents or motions filed. The
Commission strongly encourages
electronic filings; otherwise, you should
submit an original and seven copies of
any submittal to the following address:
The Secretary, Federal Energy
Regulatory Commission, Mail Code:
DHAC, PJ–12, 888 First Street NE.,
Washington, DC 20426.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
26923
j. Description of Project Facilities: (1)
A 35-foot-high by 170-foot-long dam,
with 7-inch-high flashboards; (2) a 6.5acre reservoir with a storage capacity of
130 acre-feet; (3) two outlet works with
an overall length of 23 feet; (4) a 5-footdiameter by 70-foot-long penstock; (5) a
powerhouse containing one 60-kilowatts
generating unit; (6) a tailrace; and (7)
appurtenant facilities.
k. Description of Proceeding: The
exemptee is in violation of Standard
Article 1 of its exemption, which was
granted on December 9, 1987 (41 FERC
¶ 62,224). Article 1 provides, among
other things, that the Commission may
terminate an exemption if any term or
condition of the exemption is violated.
Commission records show that
Congdon Dam Hydroelectric Project has
been non-operational since May 2002.
After several years of correspondence
regarding restoring project operation,
the exemptee has become nonresponsive. The exemptee most recently
filed with the Commission on
September 18, 2014 a plan and schedule
to restore project operation. In its filing,
the exemptee also requested to extend
the date to restore project operation to
October 1, 2015. By letter dated October
8, 2014, the Commission acknowledged
the filing and required the exemptee to
file a status update by January 15, 2015
to show continued progress towards
restoring project operation. The filing
should also include an application to
amend the exemption to reflect the new
transmission line alignment. The
exemptee did not do so. By letter dated
April 9, 2015, the Commission again
required the exemptee to file by April
24, 2014, a plan and schedule to restore
operational status, and an application to
amend the exemption if the exemptee
still intends to change the transmission
line alignment. The exemptee was
notified that failure to do so would
result in an implied surrender of the
project exemption. To date, the
exemptee has not filed a response and
the project remains inoperable.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–10200–014)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
E:\FR\FM\11MYN1.SGM
11MYN1
tkelley on DSK3SPTVN1PROD with NOTICES
26924
Federal Register / Vol. 80, No. 90 / Monday, May 11, 2015 / Notices
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212,
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
proceeding.
o. Filing and Service of Responsive
Documents—Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST,’’ or
‘‘MOTIONS TO INTERVENE’’, as
applicable; (2) set forth in the heading
the project number of the proceeding to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting, or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments or protests must set forth
their evidentiary basis. All comments,
protests, or motions to intervene should
relate to project works which are the
subject of the termination of exemption.
A copy of any protest or motion to
intervene must be served on each
representative of the exemptee specified
in item ‘‘f’’ above. A copy of all other
filings in reference to this notice must
be accompanied by proof of service on
all persons listed in the service list
prepared by the Commission in this
proceeding in accordance with 18 CFR
4.34(b) and 385.2010.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: May 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–11283 Filed 5–8–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:00 May 08, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP15–905–000.
Applicants: Gas Transmission
Northwest LLC.
Description: § 4(d) rate filing per
154.204: Consolidation of PS–1_AIS–1
into PAL Service to be effective
6/1/2015.
Filed Date: 4/24/15.
Accession Number: 20150424–5035.
Comments Due: 5 p.m. ET 5/6/15.
Docket Numbers: RP15–906–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) rate filing per
154.204: 2015 Pooling/Title Transfer
Tracking to be effective 5/28/2015.
Filed Date: 4/24/15.
Accession Number: 20150424–5103.
Comments Due: 5 p.m. ET 5/6/15.
Docket Numbers: RP15–907–000.
Applicants: Great Lakes Gas
Transmission Limited Par.
Description: Great Lakes Gas
Transmission’s Revenue Cap and
Revenue Sharing Mechanism True-Up
Report.
Filed Date: 4/24/15.
Accession Number: 20150424–5158.
Comments Due: 5 p.m. ET 5/6/15.
Docket Numbers: RP15–908–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) rate filing per
154.204: 2015 Interruptible Agreements
to be effective 5/28/2015.
Filed Date: 4/27/15.
Accession Number: 20150427–5409.
Comments Due: 5 p.m. ET 5/11/15.
Docket Numbers: RP15–909–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) rate filing per
154.204: Cap Rel Neg Rate Agmt (FPL
41618 to Tenaska 44540) to be effective
5/1/2015.
Filed Date: 4/27/15.
Accession Number: 20150427–5420.
Comments Due: 5 p.m. ET 5/11/15.
Docket Numbers: RP15–910–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) rate filing per
154.204: Exelon Negotiated Rate Filing
to be effective 5/1/2015.
Filed Date: 4/27/15.
Accession Number: 20150427–5429.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 5/11/15.
Docket Numbers: RP15–911–000.
Applicants: Elba Express Company,
L.L.C.
Description: Compliance filing per
154.203: Fuel Tracker Filing—2015.
Filed Date: 4/24/15.
Accession Number: 20150424–5371.
Comments Due: 5 p.m. ET 5/6/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 28, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–11323 Filed 5–8–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP15–912–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) rate filing per
154.204: Amendment to Neg Rate Agmt
(Sequent 34693–28) to be effective
4/28/2015.
Filed Date: 4/28/15.
Accession Number: 20150428–5232.
Comments Due: 5 p.m. ET 5/11/15.
Docket Numbers: RP15–913–000.
Applicants: East Cheyenne Gas
Storage, LLC.
Description: Compliance filing per
154.203: ECGS 2015 Operational
Purchase and Sales Report filing.
Filed Date: 4/28/15.
Accession Number: 20150428–5294.
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 80, Number 90 (Monday, May 11, 2015)]
[Notices]
[Pages 26923-26924]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-11283]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10200-014]
Congdon Pond Hydro, LLC; Notice of Intent To Terminate Exemption
(5 Mw or Less) and Soliciting Comments, Protests, or Motions To
Intervene
Take notice that the following hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of exemption by implied
surrender.
b. Project No.: 10200-014.
c. Date Initiated: May 4, 2015.
d. Exemptee: Congdon Pond Hydro, LLC.
e. Name and Location of Project: The Congdon Dam Hydroelectric
Project is located on the Oxoboxo Brook in New London County,
Connecticut.
f. Filed Pursuant to: 18 CFR 4.106 (Standard Article 1).
g. Exemptee Contact Information: Mr. John Morte, President and
Treasurer, Congdon Pond Hydro, LLC., 63 Hayward Street, Milford, MA
(508) 333-6743.
h. FERC Contact: Jennifer Polardino, (202) 502-6437,
Jennifer.Polardino@ferc.gov.
i. Deadline for filing comments, protests, or motions to intervene
is 30 days from the issuance of this notice by the Commission. Please
file your submittal electronically via the Internet (eFiling) in lieu
of paper. Please refer to the instructions on the Commission's Web site
under https://www.ferc.gov/docs-filing/efiling.asp and filing
instructions in the Commission's Regulations at 18 CFR
385.2001(a)(1)(iii). To assist you with eFilings you should refer to
the submission guidelines document at https://www.ferc.gov/help/submission-guide/user-guide.pdf. In addition, certain filing
requirements have statutory or regulatory formatting and other
instructions. You should refer to a list of these ``qualified
documents'' at https://www.ferc.gov/docs-filing/efiling/filing.pdf. You
must include your name and contact information at the end of your
comments. Please include the project number (P-10200-014) on any
documents or motions filed. The Commission strongly encourages
electronic filings; otherwise, you should submit an original and seven
copies of any submittal to the following address: The Secretary,
Federal Energy Regulatory Commission, Mail Code: DHAC, PJ-12, 888 First
Street NE., Washington, DC 20426.
j. Description of Project Facilities: (1) A 35-foot-high by 170-
foot-long dam, with 7-inch-high flashboards; (2) a 6.5-acre reservoir
with a storage capacity of 130 acre-feet; (3) two outlet works with an
overall length of 23 feet; (4) a 5-foot-diameter by 70-foot-long
penstock; (5) a powerhouse containing one 60-kilowatts generating unit;
(6) a tailrace; and (7) appurtenant facilities.
k. Description of Proceeding: The exemptee is in violation of
Standard Article 1 of its exemption, which was granted on December 9,
1987 (41 FERC ] 62,224). Article 1 provides, among other things, that
the Commission may terminate an exemption if any term or condition of
the exemption is violated.
Commission records show that Congdon Dam Hydroelectric Project has
been non-operational since May 2002. After several years of
correspondence regarding restoring project operation, the exemptee has
become non-responsive. The exemptee most recently filed with the
Commission on September 18, 2014 a plan and schedule to restore project
operation. In its filing, the exemptee also requested to extend the
date to restore project operation to October 1, 2015. By letter dated
October 8, 2014, the Commission acknowledged the filing and required
the exemptee to file a status update by January 15, 2015 to show
continued progress towards restoring project operation. The filing
should also include an application to amend the exemption to reflect
the new transmission line alignment. The exemptee did not do so. By
letter dated April 9, 2015, the Commission again required the exemptee
to file by April 24, 2014, a plan and schedule to restore operational
status, and an application to amend the exemption if the exemptee still
intends to change the transmission line alignment. The exemptee was
notified that failure to do so would result in an implied surrender of
the project exemption. To date, the exemptee has not filed a response
and the project remains inoperable.
l. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-10200-014) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-
[[Page 26924]]
3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.212, .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular proceeding.
o. Filing and Service of Responsive Documents--Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST,'' or
``MOTIONS TO INTERVENE'', as applicable; (2) set forth in the heading
the project number of the proceeding to which the filing responds; (3)
furnish the name, address, and telephone number of the person
commenting, protesting, or intervening; and (4) otherwise comply with
the requirements of 18 CFR 385.2001 through 385.2005. All comments or
protests must set forth their evidentiary basis. All comments,
protests, or motions to intervene should relate to project works which
are the subject of the termination of exemption. A copy of any protest
or motion to intervene must be served on each representative of the
exemptee specified in item ``f'' above. A copy of all other filings in
reference to this notice must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding in accordance with 18 CFR 4.34(b) and 385.2010.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: May 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-11283 Filed 5-8-15; 8:45 am]
BILLING CODE 6717-01-P