[NRC–2015–0048]
Compliance With Phase 2 of Order EA–
13–109
Nuclear Regulatory
Commission.
ACTION: Interim staff guidance; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing its Japan
Lessons-Learned Division Interim Staff
Guidance (JLD–ISG), JLD–ISG–2015–01,
‘‘Compliance with Phase 2 of Order EA–
13–109, Order Modifying Licenses with
Regard to Reliable Hardened
Containment Vents Capable of
Operation under Severe Accident
Conditions.’’ This ISG provides
guidance and clarifies the Phase 2
requirements in the order to assist the
licensees that have Boiling Water
Reactors (BWRs) with Mark I and Mark
II Containments in the design and
implementation of either a vent path
from the containment drywell or a
strategy that makes it unlikely that
venting would be needed from the
drywell before alternate reliable
containment heat removal and pressure
control is reestablished. This ISG also
endorses, with clarifications, the
industry guidance contained in Nuclear
Energy Institute (NEI) 13–02, ‘‘Industry
Guidance for Compliance with Order
EA–13–109,’’ Revision 1.
ADDRESSES: Please refer to Docket ID
NRC–2015–0048 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document by
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0048. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:07 May 06, 2015
Jkt 235001
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it available in
ADAMS) is provided the first time that
a document is referenced. The JLD–ISG–
2015–01 is available in ADAMS under
Accession No. ML15104A118. The ISG
for complying with Phase 1
requirements of the order (JLD–ISG–
2013–02) was issued on November 14,
2013 (ADAMS Accession No.
ML13304B836). The NEI 13–02,
Revision 1 is available in ADAMS under
Accession No. ML15113B318.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• NRC’s Interim Staff Guidance Web
site: JLD–ISG documents are also
available online under the ‘‘Japan
Lessons Learned’’ heading at https://
www.nrc.gov/reading-rm/doccollections/isg/japan-lessonslearned.html.
FOR FURTHER INFORMATION CONTACT:
Rajender Auluck, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
1025; email: Rajender.Auluck@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC
developed JLD–ISG–2015–01 to provide
guidance and clarification to assist
nuclear power reactor licensees with the
identification of methods needed to
comply with Phase 2 requirements in
Order EA–13–109 (ADAMS Accession
No. ML13130A067), ‘‘Order Modifying
Licenses with Regard to Reliable
Hardened Containment Vents Capable
of Operation under Severe Accident
Conditions.’’ This ISG is not a substitute
for the requirements in Order EA–13–
109, and compliance with the ISG
would not be a requirement.
The accident at the Fukushima Daiichi nuclear power station reinforced
the importance of reliable operation of
containment vents for BWR plants with
Mark I and Mark II containments. As
part of its response to the lessons
learned from the accident, on March 12,
2012, the NRC issued Order EA–12–050
(ADAMS Accession No. ML12056A043)
requiring licensees to upgrade or install
a reliable hardened containment venting
system (HCVS) for Mark I and Mark II
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
26303
containments. While developing the
requirements for Order EA–12–050, the
NRC acknowledged that questions
remained about maintaining
containment integrity and limiting the
release of radioactive materials if
licensees used the venting systems
during severe accident conditions.
The NRC staff on November 26, 2012,
presented the Commission with options
to address these issues in SECY–12–
0157, ‘‘Consideration of Additional
Requirements for Containment Venting
Systems for Boiling Water Reactors with
Mark I and Mark II Containments’’
(ADAMS Accession No. ML12325A704).
In the staff requirements memorandum
(SRM) for SECY–12–0157, dated March
19, 2013 (ADAMS Accession No.
ML13078A017), the Commission
directed the staff to: (1) Issue a
modification to Order EA–12–050
requiring BWR licensees with Mark I
and Mark II containments to upgrade or
replace the reliable hardened vents
required by Order EA–12–050 with a
containment venting system designed
and installed to remain functional
during severe accident conditions, and
(2) develop a technical basis and
rulemaking for filtering strategies with
drywell filtration and severe accident
management of BWR Mark I and II
containments. The NRC subsequently
issued Order EA–13–109 to define
requirements and schedules for
licensees for BWRs with Mark I and
Mark II containments to install severe
accident capable containment venting
systems.
In recognition of the relative
importance of venting capabilities from
the wetwell and drywell, a phased
approach to implementation is being
used to minimize delays in
implementing the requirements
originally imposed by Order EA–12–
050. Phase 1 involves upgrading the
venting capabilities from the
containment wetwell to provide
reliable, severe accident capable
hardened vents to assist in preventing
core damage and, if necessary, to
provide venting capability during severe
accident conditions. Phase 2 involves
providing additional protection during
severe accident conditions through
installation of a reliable, severe accident
capable drywell vent system or the
development of a reliable containment
venting strategy that makes it unlikely
that a licensee would need to vent from
the containment drywell during severe
accident conditions. For
implementation of Phase 1 order
requirements, the NRC issued JLD–ISG–
2013–02 on November 14, 2013 (78 FR
70356), which endorsed, with
exceptions and clarifications, the
E:\FR\FM\07MYN1.SGM
07MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
26304
Federal Register / Vol. 80, No. 88 / Thursday, May 7, 2015 / Notices
methodologies described in the industry
guidance document NEI 13–02, Rev. 0,
‘‘Industry Guidance for Compliance
with Order EA–13–109’’ (ADAMS
Accession No. ML13316A853). As
required by the order, licensees
submitted their site-specific overall
integrated plans (OIPs) by June 30, 2014.
The NRC staff has completed its review
of the OIPs and has issued interim staff
evaluations.
On March 10, 2015, the NRC staff
issued a Federal Register notice (80 FR
12649) to request public comments on
draft JLD–ISG–2015–01 (ADAMS
Accession No. ML15051A143). In
response, the NRC received comments
from SimplyInfo by letter dated March
11, 2015 (ADAMS Accession No.
ML15083A277), and the NEI by letter
dated April 9, 2015 (ADAMS Accession
No. ML15104A316). Several of these
comments have been previously
submitted to the NRC for staff’s
consideration. The resolution of these
comments has been documented and
publicly available (ADAMS Accession
No. ML15114A051).
The focus of this ISG is to provide
guidance for implementing Phase 2
requirements of the order. The Phase 2
portion of Order EA–13–109 builds on
the Phase 1 activities, and is intended
to be consistent with the expected
outcome of the development of a
regulatory basis for the Containment
Protection and Release Reduction
(CPRR) rulemaking. Specifically, the
industry described a containment
venting approach that includes severe
accident water addition (SAWA) and
severe accident water management
(SAWM) strategies that would preserve
the use of a wetwell vent path, in
addition to providing other benefits.
Evaluations performed in support of the
CPRR rulemaking confirmed significant
benefits to including SAWA as part of
a severe accident management strategy.
Therefore, SAWA will facilitate
implementation of Phase 2 of Order EA–
13–109 by establishing the design
conditions for a drywell vent and
supporting SAWM for licensees
choosing to pursue that option as a
strategy that makes it unlikely that a
licensee would need to vent from the
drywell.
On April 23, 2015, NEI submitted NEI
13–02, ‘‘Industry Guidance for
Compliance with Order EA–13–109,’’
Rev. 1 (ADAMS Accession No.
ML15113B318) to assist nuclear power
licensees with the identification of
measures needed to comply with the
Phase 2 requirements of Order EA–13–
109 regarding reliable hardened
containment vents capable of operation
under severe accident conditions. The
VerDate Sep<11>2014
18:07 May 06, 2015
Jkt 235001
NEI document includes guidance for
implementing order requirements for
both Phase 1 and Phase 2, including the
industry’s proposed approach to use the
SAWA and SAWM strategies to control
the water levels in the suppression pool
and maintain capabilities to address
over-pressure conditions without a
severe accident drywell vent. This ISG
endorses, with clarifications, the
methodologies described in the industry
guidance document NEI 13–02, Revision
1.
Dated at Rockville, Maryland, this 29th day
of April 2015.
For the Nuclear Regulatory Commission.
Jack R. Davis,
Director, Japan Lessons-Learned Division,
Office of Nuclear Reactor Regulation.
[FR Doc. 2015–11036 Filed 5–6–15; 8:45 am]
BILLING CODE 7590–01–P
II. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
In its filing with the Commission, the
Exchange included statements
concerning the purpose of and basis for
the proposed rule change and discussed
any comments it received on the
proposed rule change. The text of these
statements may be examined at the
places specified in Item IV below. The
Exchange has prepared summaries, set
forth in sections A, B, and C below, of
the most significant aspects of such
statements.
A. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
1. Purpose
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–74856; File No. SR–MIAX–
2015–31]
Self-Regulatory Organizations; Miami
International Securities Exchange LLC;
Notice of Filing and Immediate
Effectiveness of a Proposed Rule
Change To Amend Its Fee Schedule
May 1, 2015.
Pursuant to the provisions of section
19(b)(1) of the Securities Exchange Act
of 1934 (‘‘Act’’) 1 and Rule 19b–4
thereunder,2 notice is hereby given that
on April 29, 2015, Miami International
Securities Exchange LLC (‘‘MIAX’’ or
‘‘Exchange’’) filed with the Securities
and Exchange Commission
(‘‘Commission’’) a proposed rule change
as described in Items I, II, and III below,
which Items have been prepared by the
Exchange. The Commission is
publishing this notice to solicit
comments on the proposed rule change
from interested persons.
I. Self-Regulatory Organization’s
Statement of the Terms of Substance of
the Proposed Rule Change
The Exchange is filing a proposal to
modify the Market Maker Trading
Permit Fee.
The text of the proposed rule change
is available on the Exchange’s Web site
at https://www.miaxoptions.com/filter/
wotitle/rule_filing, at MIAX’s principal
office, and at the Commission’s Public
Reference Room.
1 15
2 17
PO 00000
U.S.C. 78s(b)(1).
CFR 240.19b–4.
Frm 00089
Fmt 4703
Sfmt 4703
The Exchange proposes to modify the
monthly Trading Permit fees that apply
to Market Makers (‘‘MMs’’). Specifically,
the Exchange proposes to adopt the
following fees: (i) $7,000 for MM
Assignments in up to 10 option classes
or up to 20% of option classes by
volume; (ii) $12,000 for MM
Assignments in up to 40 option classes
or up to 35% of option classes by
volume; (iii) $17,000 for MM
Assignments in up to 100 option classes
or up to 50% of option classes by
volume; and (iv) $22,000.00 for MM
Assignments in over 100 option classes
or over 50% of option classes up to all
option classes listed on MIAX.
The Exchange issues Trading Permits
that confer the ability to transact on the
Exchange.3 Currently, all MMs, whether
they are a RMM, LMM or PLMM, are
assessed $15,000 per month for a
Trading Permit for an assignment in up
to 250 option classes, or $22,000 per
month for a Trading Permit for an
assignment in over 250 option classes
up to all option classes listed on the
Exchange.4 The Exchange notes that the
3 There is no limit on the number of Trading
Permits that may be issued by the Exchange;
however the Exchange has the authority to limit or
decrease the number of Trading Permits it has
determined to issue provided it complies with the
provisions set forth in Rule 200(a) and section
6(c)(4) of the Exchange Act. See 15 U.S.C.
78(f)(c)(4). For a complete description of MIAX
Trading Permits, see MIAX Rule 200.
4 The monthly Trading Permit Fee is in addition
to the one-time application fee for MIAX
Membership. The Exchange charges a one-time
application fee based upon the applicant’s status as
either an Electronic Exchange Member (‘‘EEM’’) or
as a Market Maker. Applicants for MIAX
Membership as an EEM are assessed a one-time
Application Fee of $2,500.00. Applicants for MIAX
Membership as a Market Maker are assessed a onetime Application Fee of $3,000.00. The difference
in the fee charged to EEMs and Market Makers
E:\FR\FM\07MYN1.SGM
07MYN1
Agencies
[Federal Register Volume 80, Number 88 (Thursday, May 7, 2015)]
[Notices]
[Pages 26303-26304]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-11036]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2015-0048]
Compliance With Phase 2 of Order EA-13-109
AGENCY: Nuclear Regulatory Commission.
ACTION: Interim staff guidance; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing its
Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), JLD-
ISG-2015-01, ``Compliance with Phase 2 of Order EA-13-109, Order
Modifying Licenses with Regard to Reliable Hardened Containment Vents
Capable of Operation under Severe Accident Conditions.'' This ISG
provides guidance and clarifies the Phase 2 requirements in the order
to assist the licensees that have Boiling Water Reactors (BWRs) with
Mark I and Mark II Containments in the design and implementation of
either a vent path from the containment drywell or a strategy that
makes it unlikely that venting would be needed from the drywell before
alternate reliable containment heat removal and pressure control is
reestablished. This ISG also endorses, with clarifications, the
industry guidance contained in Nuclear Energy Institute (NEI) 13-02,
``Industry Guidance for Compliance with Order EA-13-109,'' Revision 1.
ADDRESSES: Please refer to Docket ID NRC-2015-0048 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document by
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0048. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it available in
ADAMS) is provided the first time that a document is referenced. The
JLD-ISG-2015-01 is available in ADAMS under Accession No. ML15104A118.
The ISG for complying with Phase 1 requirements of the order (JLD-ISG-
2013-02) was issued on November 14, 2013 (ADAMS Accession No.
ML13304B836). The NEI 13-02, Revision 1 is available in ADAMS under
Accession No. ML15113B318.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
NRC's Interim Staff Guidance Web site: JLD-ISG documents
are also available online under the ``Japan Lessons Learned'' heading
at https://www.nrc.gov/reading-rm/doc-collections/isg/japan-lessons-learned.html.
FOR FURTHER INFORMATION CONTACT: Rajender Auluck, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-1025; email: Rajender.Auluck@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC developed JLD-ISG-2015-01 to provide
guidance and clarification to assist nuclear power reactor licensees
with the identification of methods needed to comply with Phase 2
requirements in Order EA-13-109 (ADAMS Accession No. ML13130A067),
``Order Modifying Licenses with Regard to Reliable Hardened Containment
Vents Capable of Operation under Severe Accident Conditions.'' This ISG
is not a substitute for the requirements in Order EA-13-109, and
compliance with the ISG would not be a requirement.
The accident at the Fukushima Dai-ichi nuclear power station
reinforced the importance of reliable operation of containment vents
for BWR plants with Mark I and Mark II containments. As part of its
response to the lessons learned from the accident, on March 12, 2012,
the NRC issued Order EA-12-050 (ADAMS Accession No. ML12056A043)
requiring licensees to upgrade or install a reliable hardened
containment venting system (HCVS) for Mark I and Mark II containments.
While developing the requirements for Order EA-12-050, the NRC
acknowledged that questions remained about maintaining containment
integrity and limiting the release of radioactive materials if
licensees used the venting systems during severe accident conditions.
The NRC staff on November 26, 2012, presented the Commission with
options to address these issues in SECY-12-0157, ``Consideration of
Additional Requirements for Containment Venting Systems for Boiling
Water Reactors with Mark I and Mark II Containments'' (ADAMS Accession
No. ML12325A704). In the staff requirements memorandum (SRM) for SECY-
12-0157, dated March 19, 2013 (ADAMS Accession No. ML13078A017), the
Commission directed the staff to: (1) Issue a modification to Order EA-
12-050 requiring BWR licensees with Mark I and Mark II containments to
upgrade or replace the reliable hardened vents required by Order EA-12-
050 with a containment venting system designed and installed to remain
functional during severe accident conditions, and (2) develop a
technical basis and rulemaking for filtering strategies with drywell
filtration and severe accident management of BWR Mark I and II
containments. The NRC subsequently issued Order EA-13-109 to define
requirements and schedules for licensees for BWRs with Mark I and Mark
II containments to install severe accident capable containment venting
systems.
In recognition of the relative importance of venting capabilities
from the wetwell and drywell, a phased approach to implementation is
being used to minimize delays in implementing the requirements
originally imposed by Order EA-12-050. Phase 1 involves upgrading the
venting capabilities from the containment wetwell to provide reliable,
severe accident capable hardened vents to assist in preventing core
damage and, if necessary, to provide venting capability during severe
accident conditions. Phase 2 involves providing additional protection
during severe accident conditions through installation of a reliable,
severe accident capable drywell vent system or the development of a
reliable containment venting strategy that makes it unlikely that a
licensee would need to vent from the containment drywell during severe
accident conditions. For implementation of Phase 1 order requirements,
the NRC issued JLD-ISG-2013-02 on November 14, 2013 (78 FR 70356),
which endorsed, with exceptions and clarifications, the
[[Page 26304]]
methodologies described in the industry guidance document NEI 13-02,
Rev. 0, ``Industry Guidance for Compliance with Order EA-13-109''
(ADAMS Accession No. ML13316A853). As required by the order, licensees
submitted their site-specific overall integrated plans (OIPs) by June
30, 2014. The NRC staff has completed its review of the OIPs and has
issued interim staff evaluations.
On March 10, 2015, the NRC staff issued a Federal Register notice
(80 FR 12649) to request public comments on draft JLD-ISG-2015-01
(ADAMS Accession No. ML15051A143). In response, the NRC received
comments from SimplyInfo by letter dated March 11, 2015 (ADAMS
Accession No. ML15083A277), and the NEI by letter dated April 9, 2015
(ADAMS Accession No. ML15104A316). Several of these comments have been
previously submitted to the NRC for staff's consideration. The
resolution of these comments has been documented and publicly available
(ADAMS Accession No. ML15114A051).
The focus of this ISG is to provide guidance for implementing Phase
2 requirements of the order. The Phase 2 portion of Order EA-13-109
builds on the Phase 1 activities, and is intended to be consistent with
the expected outcome of the development of a regulatory basis for the
Containment Protection and Release Reduction (CPRR) rulemaking.
Specifically, the industry described a containment venting approach
that includes severe accident water addition (SAWA) and severe accident
water management (SAWM) strategies that would preserve the use of a
wetwell vent path, in addition to providing other benefits. Evaluations
performed in support of the CPRR rulemaking confirmed significant
benefits to including SAWA as part of a severe accident management
strategy. Therefore, SAWA will facilitate implementation of Phase 2 of
Order EA-13-109 by establishing the design conditions for a drywell
vent and supporting SAWM for licensees choosing to pursue that option
as a strategy that makes it unlikely that a licensee would need to vent
from the drywell.
On April 23, 2015, NEI submitted NEI 13-02, ``Industry Guidance for
Compliance with Order EA-13-109,'' Rev. 1 (ADAMS Accession No.
ML15113B318) to assist nuclear power licensees with the identification
of measures needed to comply with the Phase 2 requirements of Order EA-
13-109 regarding reliable hardened containment vents capable of
operation under severe accident conditions. The NEI document includes
guidance for implementing order requirements for both Phase 1 and Phase
2, including the industry's proposed approach to use the SAWA and SAWM
strategies to control the water levels in the suppression pool and
maintain capabilities to address over-pressure conditions without a
severe accident drywell vent. This ISG endorses, with clarifications,
the methodologies described in the industry guidance document NEI 13-
02, Revision 1.
Dated at Rockville, Maryland, this 29th day of April 2015.
For the Nuclear Regulatory Commission.
Jack R. Davis,
Director, Japan Lessons-Learned Division, Office of Nuclear Reactor
Regulation.
[FR Doc. 2015-11036 Filed 5-6-15; 8:45 am]
BILLING CODE 7590-01-P