Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 26022 [2015-10564]

Download as PDF 26022 Federal Register / Vol. 80, No. 87 / Wednesday, May 6, 2015 / Notices to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: April 30, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–10574 Filed 5–5–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2310–207] tkelley on DSK3SPTVN1PROD with NOTICES Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application for Temporary Variance of License Requirement. b. Project No.: 2310–207. c. Date Filed: April 24, 2015. d. Applicants: Pacific Gas and Electric Company (licensee). e. Name of Project: Drum-Spaulding Project. f. Location: South Yuba River and Bear River in Placer and Nevada counties, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Ezra Becker, License Coordinator, Pacific Gas and Electric Company, (415) 973–3082. i. FERC Contact: Mr. John Aedo, (415) 369–3335, or john.aedo@ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the issuance date of this notice by the Commission (April 29, 2015). The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 VerDate Sep<11>2014 18:43 May 05, 2015 Jkt 235001 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 2310–207) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The licensee requests a temporary variance of the minimum flow requirements at streamflow gage YB–292, located in Mormon Ravine above Newcastle Powerhouse. Specifically, the licensee requests that the instantaneous 5 cubic feet per second (cfs) minimum flow requirement be reduced to 3 cfs from May 11 to October 15, 2015. During this time the licensee would also maintain a target flow of 5 cfs, based on a 24-hour average flow at gage YB–292. The licensee states that the variance is necessary due to reduced water deliveries in the upstream canal system during the ongoing drought and the large fluctuations caused by irregular water withdrawals in the canal system made by other users. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: April 29, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–10564 Filed 5–5–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–1582–000] 65HK 8me LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of 65HK 8me LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for E:\FR\FM\06MYN1.SGM 06MYN1

Agencies

[Federal Register Volume 80, Number 87 (Wednesday, May 6, 2015)]
[Notices]
[Page 26022]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-10564]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2310-207]


Pacific Gas and Electric Company; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Temporary Variance of 
License Requirement.
    b. Project No.: 2310-207.
    c. Date Filed: April 24, 2015.
    d. Applicants: Pacific Gas and Electric Company (licensee).
    e. Name of Project: Drum-Spaulding Project.
    f. Location: South Yuba River and Bear River in Placer and Nevada 
counties, California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Ezra Becker, License Coordinator, Pacific 
Gas and Electric Company, (415) 973-3082.
    i. FERC Contact: Mr. John Aedo, (415) 369-3335, or 
john.aedo@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission (April 29, 2015). The Commission strongly encourages 
electronic filing. Please file motions to intervene, protests, 
comments, or recommendations using the Commission's eFiling system at 
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. Please include the project number 
(P-2310-207) on any comments, motions to intervene, protests, or 
recommendations filed.
    k. Description of Request: The licensee requests a temporary 
variance of the minimum flow requirements at streamflow gage YB-292, 
located in Mormon Ravine above Newcastle Powerhouse. Specifically, the 
licensee requests that the instantaneous 5 cubic feet per second (cfs) 
minimum flow requirement be reduced to 3 cfs from May 11 to October 15, 
2015. During this time the licensee would also maintain a target flow 
of 5 cfs, based on a 24-hour average flow at gage YB-292. The licensee 
states that the variance is necessary due to reduced water deliveries 
in the upstream canal system during the ongoing drought and the large 
fluctuations caused by irregular water withdrawals in the canal system 
made by other users.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208- 3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: April 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-10564 Filed 5-5-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.