65HK 8me LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 26022-26023 [2015-10561]
Download as PDF
26022
Federal Register / Vol. 80, No. 87 / Wednesday, May 6, 2015 / Notices
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: April 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–10574 Filed 5–5–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2310–207]
tkelley on DSK3SPTVN1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of License
Requirement.
b. Project No.: 2310–207.
c. Date Filed: April 24, 2015.
d. Applicants: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Drum-Spaulding
Project.
f. Location: South Yuba River and
Bear River in Placer and Nevada
counties, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Ezra
Becker, License Coordinator, Pacific Gas
and Electric Company, (415) 973–3082.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission (April 29, 2015). The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
VerDate Sep<11>2014
18:43 May 05, 2015
Jkt 235001
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
2310–207) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Description of Request: The
licensee requests a temporary variance
of the minimum flow requirements at
streamflow gage YB–292, located in
Mormon Ravine above Newcastle
Powerhouse. Specifically, the licensee
requests that the instantaneous 5 cubic
feet per second (cfs) minimum flow
requirement be reduced to 3 cfs from
May 11 to October 15, 2015. During this
time the licensee would also maintain a
target flow of 5 cfs, based on a 24-hour
average flow at gage YB–292. The
licensee states that the variance is
necessary due to reduced water
deliveries in the upstream canal system
during the ongoing drought and the
large fluctuations caused by irregular
water withdrawals in the canal system
made by other users.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: April 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–10564 Filed 5–5–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–1582–000]
65HK 8me LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of 65HK
8me LLC’s application for market-based
rate authority, with an accompanying
rate schedule, noting that such
application includes a request for
E:\FR\FM\06MYN1.SGM
06MYN1
Federal Register / Vol. 80, No. 87 / Wednesday, May 6, 2015 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
§ 385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is May 19, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–10561 Filed 5–5–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:43 May 05, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7856–027]
Willow Creek Hydro, LLC; Notice of
Termination Of License (Minor Project)
by Implied Surrender and Soliciting
Comments and Protests
Take notice that the following
hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of
license by implied surrender.
b. Project No.: 7856–027.
c. Date Initiated: April 29, 2015.
d. Licensee: Willow Creek Hydro,
LLC.
e. Name and Location of Project: The
Potosi Power Company Water Power
Project, is located on the South Willow
and Potosi Creeks, in Madison County,
Montana and occupies 0.3 acres of
federal lands within the Beaverhead
National Forest.
f. Filed Pursuant to: Standard Article
24.
g. Licensee Contact Information: Ms.
Jane Joslin, Willow Creek Hydro, LLC.,
1 South Willow Creek, Pony, Montana
59747 and Mr. Darrin Brooks, Willow
Creek Hydro, LLC., P.O. Box 267, Pony,
Montana 59747, (406) 685–3330.
h. FERC Contact: Ashish Desai, (202)
502–8370, Ashish.Desai@ferc.gov.
i. Deadline for filing comments and
protests is 30 days from the issuance
date of this notice by the Commission.
Please file your submittal electronically
via the Internet (eFiling) in lieu of
paper. Please refer to the instructions on
the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp and filing instructions in the
Commission’s Regulations at 18 CFR
385.2001(a)(1)(iii). To assist you with
eFilings you should refer to the
submission guidelines document at
https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
certain filing requirements have
statutory or regulatory formatting and
other instructions. You should refer to
a list of these ‘‘qualified documents’’ at
https://www.ferc.gov/docs-filing/efiling/
filing.pdf. You must include your name
and contact information at the end of
your comments. Please include the
project number (P–7856–027) on any
documents or motions filed. The
Commission strongly encourages
electronic filings; otherwise, you should
submit an original and seven copies of
any submittal to the following address:
The Secretary, Federal Energy
Regulatory Commission, Mail Code:
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
26023
DHAC, PJ–12, 888 First Street NE.,
Washington, DC 20426.
j. Description of Project Facilities: (1)
A 6-foot-high diversion structure; (2) a
2,300-foot-long penstock; (3) a
powerhouse containing two generating
units with a combined installed
capacity of 300 kW; (4) a 10,000-footlong underground transmission line; (5)
a 2.5-mile-long, 12.5-kV overhead
transmission line; and (6) appurtenant
facilities.
k. Description of Proceeding: The
licensee is in violation of Article 24 of
its license, which was issued October 7,
1985 (33 FERC ¶ 62,017). Article 24
states in part: If the Licensee shall
abandon or discontinue good faith
operation of the project or refuse or
neglect to comply with the terms of the
license and the lawful orders of the
Commission, the Commission will deem
it to be the intent of the Licensee to
surrender the license.
Commission records indicate that the
project has not operated since the
project penstock ruptured in 1994. After
several years of correspondence
regarding restoring project operation,
the licensee has become non-responsive.
The licensee most recently filed a plan
and schedule to restore project
operation with the Commission on
February 6, 2014. By letter dated March
6, 2014, the Commission acknowledged
the filing and required the licensee to
file progress reports January 1 and June
1 of each year to ensure the licensee’s
continued progress towards restoring
project operation. The licensee did not
file the first progress report due on June
1, 2014. By letter dated November 12,
2014, the Commission indicated the
licensee must file the overdue progress
report, failure to do so would result in
an implied surrender of the project
license. To date, the licensee has not
filed a response and the project remains
inoperable.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–7856–027)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 80, Number 87 (Wednesday, May 6, 2015)]
[Notices]
[Pages 26022-26023]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-10561]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER15-1582-000]
65HK 8me LLC; Supplemental Notice That Initial Market-Based Rate
Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding,
of 65HK 8me LLC's application for market-based rate authority, with an
accompanying rate schedule, noting that such application includes a
request for
[[Page 26023]]
blanket authorization, under 18 CFR part 34, of future issuances of
securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and Sec. 385.214).
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability is May 19, 2015.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding(s) are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: April 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-10561 Filed 5-5-15; 8:45 am]
BILLING CODE 6717-01-P