Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices above-ground transmission line; (9) three proposed single phased transformers; and (10) appurtenant facilities. On average, the project would generate approximately 2,800 megawatthours annually. The applicant proposes to remove a non-operating sluice gate on the spillway, rehabilitate the powerhouse, and operate the project in a run-of-river mode. m. Due to the project works already existing and the limited scope of proposed rehabilitation of the project site described above, the applicant’s close coordination with federal and state agencies during the preparation of the application, completed studies during pre-filing consultation, and agency recommended preliminary terms and conditions, we intend to waive scoping and expedite the exemption process. Based on a review of the application, resource agency consultation letters including the preliminary 30(c) terms and conditions, and comments filed to date, Commission staff intends to prepare a single environmental assessment (EA). Commission staff determined that the issues that need to be addressed in its EA have been adequately identified during the pre-filing period, which included a public meeting and site visit, and no new issues are likely to be identified through additional scoping. The EA will consider assessing the potential effects of project construction and operation on aquatic, terrestrial, threatened and endangered species, recreation and land use, aesthetic, and cultural and historic resources. n. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing VerDate Sep<11>2014 18:14 Apr 30, 2015 Jkt 235001 development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ or ‘‘TERMS AND CONDITIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. p. Procedural Schedule: The application will be processed according to the following procedural schedule. Revisions to the schedule may be made as appropriate. MILESTONE: Notice of the availability of the EA. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 24911 TARGET DATE: October 1, 2015. Dated: April 23, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–10220 Filed 4–30–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14628–001] Minneapolis Leased Housing Associates IV, Limited Partnership; Notice of Application and ApplicantPrepared EA Accepted for Filing, Soliciting Motions To Intervene and Protests, and Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions Take notice that the following hydroelectric application and applicantprepared environmental assessment has been filed with the Commission and is available for public inspection. a. Type of Application: Minor License. b. Project No.: 14628–001. c. Date filed: March 20, 2015. d. Applicant: Minneapolis Leased Housing Associates IV, Limited Partnership (Minneapolis Housing Associates). e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-Mill Project). f. Location: On the Mississippi River, in the City of Minneapolis, Hennepin County, Minnesota. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150, Plymouth, MN 55441; (763) 354–5618; email ometz@dominiuminc.com. i. FERC Contact: Shana Murray at (202) 502–8333; or email at shana.murray@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, and final terms and conditions, recommendations, and prescriptions: 30 days from the issuance date of this notice; reply comments are due 45 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests, comments, and final terms and conditions, recommendations, and prescriptions using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, E:\FR\FM\01MYN1.SGM 01MYN1 mstockstill on DSK4VPTVN1PROD with NOTICES 24912 Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14628–001. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing. l. The A-Mill Project consists of: (1) Removal of an existing concrete bulkhead blocking the existing intake structure; (2) an existing headrace tunnel rehabilitated and sleeved with a new 616-foot-long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe installed in the existing downstream drop-shaft; (4) a new 600-kilowatt turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet structure at the existing downstream tailrace; and (6) appurtenant facilities. The average annual generation is estimated to be 3,400 megawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an VerDate Sep<11>2014 18:14 Apr 30, 2015 Jkt 235001 application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: April 24, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–10221 Filed 4–30–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–128–000. Applicants: American Transmission Company LLC. Description: Application for Authority to Acquire Transmission Facilities of American Transmission Company LLC. Filed Date: 4/24/15. Accession Number: 20150424–5164. Comments Due: 5 p.m. ET 5/15/15. Docket Numbers: EC15–129–000. Applicants: 8point3 Energy Partners LP, Solar Star California XIII, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of 8point3 Energy Partners LP and Solar Star California XIII, LLC. Filed Date: 4/24/15. Accession Number: 20150424–5254. Comments Due: 5 p.m. ET 5/15/15. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1739–001; ER11–2765–001; ER12–2310–003. Applicants: Bethel Wind Energy LLC, Elk Wind Energy LLC, Zephyr Wind, LLC. Description: Notice of Non-Material Change in Status of the Black Rock MBR Affiliates. Filed Date: 4/24/15. Accession Number: 20150424–5237. Comments Due: 5 p.m. ET 5/15/15. Docket Numbers: ER13–1864–002. Applicants: Southwest Power Pool, Inc. Description: Compliance filing per 35: SPP–MISO JOA Sec 8.1.2 Market-toMarket Compliance Filing in Docket ER13–1864 to be effective 3/1/2015. Filed Date: 4/24/15. Accession Number: 20150424–5263. Comments Due: 5 p.m. ET 5/15/15. E:\FR\FM\01MYN1.SGM 01MYN1

Agencies

[Federal Register Volume 80, Number 84 (Friday, May 1, 2015)]
[Notices]
[Pages 24911-24912]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-10221]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14628-001]


Minneapolis Leased Housing Associates IV, Limited Partnership; 
Notice of Application and Applicant-Prepared EA Accepted for Filing, 
Soliciting Motions To Intervene and Protests, and Soliciting Comments, 
and Final Terms and Conditions, Recommendations, and Prescriptions

    Take notice that the following hydroelectric application and 
applicant-prepared environmental assessment has been filed with the 
Commission and is available for public inspection.
    a. Type of Application: Minor License.
    b. Project No.: 14628-001.
    c. Date filed: March 20, 2015.
    d. Applicant: Minneapolis Leased Housing Associates IV, Limited 
Partnership (Minneapolis Housing Associates).
    e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-
Mill Project).
    f. Location: On the Mississippi River, in the City of Minneapolis, 
Hennepin County, Minnesota. No federal lands are occupied by the 
project works or located within the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150, 
Plymouth, MN 55441; (763) 354-5618; email ometz@dominiuminc.com.
    i. FERC Contact: Shana Murray at (202) 502-8333; or email at 
shana.murray@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
and final terms and conditions, recommendations, and prescriptions: 30 
days from the issuance date of this notice; reply comments are due 45 
days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, and final terms and 
conditions, recommendations, and prescriptions using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters,

[[Page 24912]]

without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. For assistance, please 
contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The 
first page of any filing should include docket number P-14628-001.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing.
    l. The A-Mill Project consists of: (1) Removal of an existing 
concrete bulkhead blocking the existing intake structure; (2) an 
existing headrace tunnel rehabilitated and sleeved with a new 616-foot-
long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe 
installed in the existing downstream drop-shaft; (4) a new 600-kilowatt 
turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet 
structure at the existing downstream tailrace; and (6) appurtenant 
facilities. The average annual generation is estimated to be 3,400 
megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, and .214. In determining the appropriate action to 
take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

     Dated: April 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-10221 Filed 4-30-15; 8:45 am]
 BILLING CODE 6717-01-P