Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices
above-ground transmission line; (9)
three proposed single phased
transformers; and (10) appurtenant
facilities. On average, the project would
generate approximately 2,800 megawatthours annually. The applicant proposes
to remove a non-operating sluice gate on
the spillway, rehabilitate the
powerhouse, and operate the project in
a run-of-river mode.
m. Due to the project works already
existing and the limited scope of
proposed rehabilitation of the project
site described above, the applicant’s
close coordination with federal and
state agencies during the preparation of
the application, completed studies
during pre-filing consultation, and
agency recommended preliminary terms
and conditions, we intend to waive
scoping and expedite the exemption
process. Based on a review of the
application, resource agency
consultation letters including the
preliminary 30(c) terms and conditions,
and comments filed to date,
Commission staff intends to prepare a
single environmental assessment (EA).
Commission staff determined that the
issues that need to be addressed in its
EA have been adequately identified
during the pre-filing period, which
included a public meeting and site visit,
and no new issues are likely to be
identified through additional scoping.
The EA will consider assessing the
potential effects of project construction
and operation on aquatic, terrestrial,
threatened and endangered species,
recreation and land use, aesthetic, and
cultural and historic resources.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
VerDate Sep<11>2014
18:14 Apr 30, 2015
Jkt 235001
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ or ‘‘TERMS
AND CONDITIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
p. Procedural Schedule: The
application will be processed according
to the following procedural schedule.
Revisions to the schedule may be made
as appropriate.
MILESTONE: Notice of the
availability of the EA.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
24911
TARGET DATE: October 1, 2015.
Dated: April 23, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–10220 Filed 4–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14628–001]
Minneapolis Leased Housing
Associates IV, Limited Partnership;
Notice of Application and ApplicantPrepared EA Accepted for Filing,
Soliciting Motions To Intervene and
Protests, and Soliciting Comments,
and Final Terms and Conditions,
Recommendations, and Prescriptions
Take notice that the following
hydroelectric application and applicantprepared environmental assessment has
been filed with the Commission and is
available for public inspection.
a. Type of Application: Minor
License.
b. Project No.: 14628–001.
c. Date filed: March 20, 2015.
d. Applicant: Minneapolis Leased
Housing Associates IV, Limited
Partnership (Minneapolis Housing
Associates).
e. Name of Project: A-Mill Artist Lofts
Hydroelectric Project (A-Mill Project).
f. Location: On the Mississippi River,
in the City of Minneapolis, Hennepin
County, Minnesota. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Owen Metz,
2905 Northwest Blvd., Suite 150,
Plymouth, MN 55441; (763) 354–5618;
email ometz@dominiuminc.com.
i. FERC Contact: Shana Murray at
(202) 502–8333; or email at
shana.murray@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments, and
final terms and conditions,
recommendations, and prescriptions: 30
days from the issuance date of this
notice; reply comments are due 45 days
from the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments, and
final terms and conditions,
recommendations, and prescriptions
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
E:\FR\FM\01MYN1.SGM
01MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
24912
Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14628–001.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing.
l. The A-Mill Project consists of: (1)
Removal of an existing concrete
bulkhead blocking the existing intake
structure; (2) an existing headrace
tunnel rehabilitated and sleeved with a
new 616-foot-long, 5-foot-diameter steel
penstock; (3) a new vertical steel pipe
installed in the existing downstream
drop-shaft; (4) a new 600-kilowatt
turbine generator; (5) a new 6-foot-wide
by 4-foot-tall concrete outlet structure at
the existing downstream tailrace; and
(6) appurtenant facilities. The average
annual generation is estimated to be
3,400 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
VerDate Sep<11>2014
18:14 Apr 30, 2015
Jkt 235001
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: April 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–10221 Filed 4–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–128–000.
Applicants: American Transmission
Company LLC.
Description: Application for
Authority to Acquire Transmission
Facilities of American Transmission
Company LLC.
Filed Date: 4/24/15.
Accession Number: 20150424–5164.
Comments Due: 5 p.m. ET 5/15/15.
Docket Numbers: EC15–129–000.
Applicants: 8point3 Energy Partners
LP, Solar Star California XIII, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of 8point3 Energy
Partners LP and Solar Star California
XIII, LLC.
Filed Date: 4/24/15.
Accession Number: 20150424–5254.
Comments Due: 5 p.m. ET 5/15/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1739–001;
ER11–2765–001; ER12–2310–003.
Applicants: Bethel Wind Energy LLC,
Elk Wind Energy LLC, Zephyr Wind,
LLC.
Description: Notice of Non-Material
Change in Status of the Black Rock MBR
Affiliates.
Filed Date: 4/24/15.
Accession Number: 20150424–5237.
Comments Due: 5 p.m. ET 5/15/15.
Docket Numbers: ER13–1864–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing per 35:
SPP–MISO JOA Sec 8.1.2 Market-toMarket Compliance Filing in Docket
ER13–1864 to be effective 3/1/2015.
Filed Date: 4/24/15.
Accession Number: 20150424–5263.
Comments Due: 5 p.m. ET 5/15/15.
E:\FR\FM\01MYN1.SGM
01MYN1
Agencies
[Federal Register Volume 80, Number 84 (Friday, May 1, 2015)]
[Notices]
[Pages 24911-24912]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-10221]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14628-001]
Minneapolis Leased Housing Associates IV, Limited Partnership;
Notice of Application and Applicant-Prepared EA Accepted for Filing,
Soliciting Motions To Intervene and Protests, and Soliciting Comments,
and Final Terms and Conditions, Recommendations, and Prescriptions
Take notice that the following hydroelectric application and
applicant-prepared environmental assessment has been filed with the
Commission and is available for public inspection.
a. Type of Application: Minor License.
b. Project No.: 14628-001.
c. Date filed: March 20, 2015.
d. Applicant: Minneapolis Leased Housing Associates IV, Limited
Partnership (Minneapolis Housing Associates).
e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-
Mill Project).
f. Location: On the Mississippi River, in the City of Minneapolis,
Hennepin County, Minnesota. No federal lands are occupied by the
project works or located within the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150,
Plymouth, MN 55441; (763) 354-5618; email ometz@dominiuminc.com.
i. FERC Contact: Shana Murray at (202) 502-8333; or email at
shana.murray@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
and final terms and conditions, recommendations, and prescriptions: 30
days from the issuance date of this notice; reply comments are due 45
days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests, comments, and final terms and
conditions, recommendations, and prescriptions using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters,
[[Page 24912]]
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. For assistance, please
contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The
first page of any filing should include docket number P-14628-001.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing.
l. The A-Mill Project consists of: (1) Removal of an existing
concrete bulkhead blocking the existing intake structure; (2) an
existing headrace tunnel rehabilitated and sleeved with a new 616-foot-
long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe
installed in the existing downstream drop-shaft; (4) a new 600-kilowatt
turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet
structure at the existing downstream tailrace; and (6) appurtenant
facilities. The average annual generation is estimated to be 3,400
megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit comments, a protest, or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, and .214. In determining the appropriate action to
take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,''
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. A copy of any protest or motion to intervene must
be served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: April 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-10221 Filed 4-30-15; 8:45 am]