Environmental Impact Statements; Notice of Availability, 24915 [2015-10218]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices
includes environmental review
provisions.
The PEIS collected and analyzed this
information as it applies to wind energy
development in the six states included
in the UGP Region. Specifically, through
the PEIS Western and the Service have:
1. Defined areas with a high potential
for wind energy development near the
UGP Region’s transmission system in
anticipation of future wind-generation
interconnection requests.
2. Defined natural and human
environment resources in areas with
high wind energy development
potential, including Native American
lands, to support analyses of the
environmental impacts and
development of wind energy projects.
3. Identified standardized
environmental evaluation procedures,
avoidance areas, best management
practices, and mitigation measures to be
used by interconnection applicants for
identifying and reducing wind energy
development impacts of their projects
on the natural and human environment.
4. Initiated a programmatic ESA
Section 7 informal consultation for
federally listed and proposed threatened
and endangered species within the
study area boundaries established for
the PEIS that may be affected by future
wind energy development.
5. Provided guidance for
interconnection applicants that includes
information about natural resources
within areas with a high potential for
wind development, requirements for
subsequent site-specific environmental
reviews, avoidance areas, and
appropriate best management practices
and mitigation measures to address
adverse environmental impacts related
to wind projects and associated
transmission system enhancements.
The Service maintains a grassland and
wetland easement program to support
and enhance waterfowl populations in
the Prairie Pothole Region. The Service
has developed a plan that will, in some
circumstances, allow partial release of
an easement for wind generation
purposes, only with defined conditions
and on a specified area, in exchange for
additional easement acreage being
conveyed to the Service. A streamlined
approach for compliance with NEPA
and ESA for future site-specific wind
development projects would result from
this PEIS, and would benefit both
agencies.
Western and the Service are engaged
in informal consultation under Section
7 of the ESA in support of the PEIS
process. A Programmatic Biological
Assessment has been prepared for listed
and candidate species occurring in the
UGP Region, and it is expected that the
VerDate Sep<11>2014
18:14 Apr 30, 2015
Jkt 235001
Service’s Ecological Services Field
Office will issue a letter of concurrence
as a result of this consultation.
Separate Records of Decision
addressing each agency’s Federal
actions will be issued by Western and
the Service not sooner than 30 days after
distribution of the Final PEIS and the
date of the Environmental Protection
Agency’s weekly Federal Register
notice listing the availability of the EIS.
Dated: April 21, 2015.
Mark A. Gabriel,
Administrator, Western Area Power
Administration.
Dated: January 28, 2015.
Matt Hogan,
Deputy Regional Director, Mountain-Prairie
Region, U.S. Fish and Wildlife Service.
[FR Doc. 2015–10237 Filed 4–30–15; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9020–7]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 04/20/2015 Through 04/24/2015
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20150117, Draft EIS, NPS, HI,
Hawaii Volcanoes National Park Draft
General Management Plan and
Wilderness Study, Comment Period
Ends: 06/30/2015, Contact: Cindy
Orlando 808–985–6026.
EIS No. 20150118, Draft Supplement,
USACE, CA, Mather Specific Plan,
Comment Period Ends: 06/15/2015,
Contact: Mary Pakenham-Walsh 916–
557–7718.
EIS No. 20150119, Final EIS, OSM, NM,
Four Corners Power Plant and Navajo
Mine Energy Project, Review Period
Ends: 06/01/2015, Contact: Mychal
Yellowman 303–293–5049.
EIS No. 20150120, Final EIS, WAPA,
USFWS, 00, PROGRAMMATIC—
Upper Great Plains Wind Energy
Project, Review Period Ends: 06/01/
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
24915
2015, Contact: Mark Wieringa 720–
962–7448.
The U.S. Department of Energy’s
Western Area Power Administration
and the U.S. Department of the Interior’s
Fish and Wildlife Service are joint lead
agencies for the above project.
EIS No. 20150121, Final EIS, BLM, WY,
TransWest Express Transmission
Project, Review Period Ends: 06/01/
2015, Contact: Sharon Knowlton 307–
775–6124.
EIS No. 20150122, Final EIS, APHIS,
OR, ADOPTION—Double-crested
Cormorant Management Plan to
Reduce Predation of Juvenile
Salmonids in the Columbia River
Estuary, Contact: Kevin Christensen
503–326–2346.
The U.S. Department of Agriculture’s
Animal and Plant Health Inspection
Service (APHIS) has adopted the U.S.
Army Corps of Engineers FEIS
#20150122, filed with the U.S. EPA on
2/25/2015. APHIS was a cooperating
agency on this project, therefore,
recirculation of the document is not
necessary under section 1506.3(c) of
CEQ Regulations.
Dated: April 28, 2015.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2015–10218 Filed 4–30–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2003–0034; FRL–9927–08–
OEI]
Proposed Information Collection
Request; Comment Request; Voluntary
Aluminum Industrial Partnership
(VAIP) (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
Voluntary Aluminum Industrial
Partnership (VAIP) (Renewal)—EPA ICR
No. 1867.05, OMB Control No. 2060–
0411—to the Office of Management and
Budget (OMB) for review and approval
in accordance with the Paperwork
Reduction Act (44 U.S.C. 3501 et seq.).
Before doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection as
described below. This is a proposed
extension of the ICR, which is currently
approved through June 30, 2015. An
agency may not conduct or sponsor and
SUMMARY:
E:\FR\FM\01MYN1.SGM
01MYN1
Agencies
[Federal Register Volume 80, Number 84 (Friday, May 1, 2015)]
[Notices]
[Page 24915]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-10218]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9020-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 04/20/2015 Through 04/24/2015
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20150117, Draft EIS, NPS, HI, Hawaii Volcanoes National Park
Draft General Management Plan and Wilderness Study, Comment Period
Ends: 06/30/2015, Contact: Cindy Orlando 808-985-6026.
EIS No. 20150118, Draft Supplement, USACE, CA, Mather Specific Plan,
Comment Period Ends: 06/15/2015, Contact: Mary Pakenham-Walsh 916-557-
7718.
EIS No. 20150119, Final EIS, OSM, NM, Four Corners Power Plant and
Navajo Mine Energy Project, Review Period Ends: 06/01/2015, Contact:
Mychal Yellowman 303-293-5049.
EIS No. 20150120, Final EIS, WAPA, USFWS, 00, PROGRAMMATIC--Upper Great
Plains Wind Energy Project, Review Period Ends: 06/01/2015, Contact:
Mark Wieringa 720-962-7448.
The U.S. Department of Energy's Western Area Power Administration
and the U.S. Department of the Interior's Fish and Wildlife Service are
joint lead agencies for the above project.
EIS No. 20150121, Final EIS, BLM, WY, TransWest Express Transmission
Project, Review Period Ends: 06/01/2015, Contact: Sharon Knowlton 307-
775-6124.
EIS No. 20150122, Final EIS, APHIS, OR, ADOPTION--Double-crested
Cormorant Management Plan to Reduce Predation of Juvenile Salmonids in
the Columbia River Estuary, Contact: Kevin Christensen 503-326-2346.
The U.S. Department of Agriculture's Animal and Plant Health
Inspection Service (APHIS) has adopted the U.S. Army Corps of Engineers
FEIS #20150122, filed with the U.S. EPA on 2/25/2015. APHIS was a
cooperating agency on this project, therefore, recirculation of the
document is not necessary under section 1506.3(c) of CEQ Regulations.
Dated: April 28, 2015.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2015-10218 Filed 4-30-15; 8:45 am]