Download as PDF 23597 Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices NUCLEAR REGULATORY COMMISSION [Docket Nos. 52–012 and 52–013; NRC– 2008–0091] Nuclear Innovation North America LLC; South Texas Project, Units 3 and 4 Nuclear Regulatory Commission. ACTION: Combined license application; availability. AGENCY: On September 20, 2007, South Texas Project Nuclear Operating Company (STPNOC) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for combined licenses (COLs) for two additional units (Units 3 and 4) at the South Texas Project (STP) Electric Generating Station site in Matagorda County near Bay City, Texas. The NRC published a notice of receipt and availability for this COL application in the Federal Register on December 5, 2007. In a letter dated January 19, 2011, STPNOC notified the NRC that, effective January 24, 2011, Nuclear Innovation North America LLC (NINA) became the lead applicant for STP, Units 3 and 4. This notice is being published to notify the public of the availability of the COL application for STP, Units 3 and 4. DATES: The COL application is available on April 28, 2015. ADDRESSES: Please refer to Docket ID NRC–2008–0091 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this action by the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search SUMMARY: for Docket ID NRC–2008–0091. Address questions about NRC dockets to Carol Gallagher; telephone: 301–415–3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it available in ADAMS) is provided the first time that a document is referenced. For the convenience of the reader, the ADAMS accession numbers are provided in a table in the ‘‘Availability of Documents’’ section of this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Tom Tai, telephone: 301–415–8484, email: Tom.Tai@nrc.gov; or Luis Betancourt, telephone: 301–415–6145, email: Luis.Betancourt@nrc.gov. Both are staff of the Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. SUPPLEMENTARY INFORMATION: On September 20, 2007, the NRC received a COL application from STPNOC, filed pursuant to section 103 of the Atomic Energy Act of 1954, as amended, and part 52 of title 10 of the Code of Federal Regulations (10 CFR), ‘‘Licenses, Certifications, and Approvals for Nuclear Power Plants,’’ to construct and operate two additional units (Units 3 and 4) at the STP Electric Generating Station site in Matagorda County near Bay City, Texas. The additional units are based on the U.S. Advanced Boiling Water Reactor design, which is certified in 10 CFR part 52, appendix A. The NRC published a notice of receipt and availability for an application for a COL in the Federal Register on December 5, 2007 (72 FR 68597). In a letter dated January 19, 2011, STPNOC notified the NRC that, effective January 24, 2011, NINA became the lead applicant for STP, Units 3 and 4. As such, NINA assumed responsibility for the design, construction and licensing of STP, Units 3 and 4. The application is currently under review by the NRC. An applicant may seek a COL in accordance with subpart C of 10 CFR part 52. The information submitted by the applicant includes certain administrative information, such as financial qualifications submitted pursuant to 10 CFR 52.77, as well as technical information submitted pursuant to 10 CFR 52.79. This notice is being provided in accordance with the requirements in 10 CFR 50.43(a)(3). Availability of Documents The documents identified in the following table are available to interested persons through the ADAMS Public Documents collection. A copy of the COL application is also available for public inspection at the NRC’s PDR and at https://www.nrc.gov/reactors/newreactors/col.html. ADAMS Accession No. asabaliauskas on DSK5VPTVN1PROD with NOTICES Document South Texas Project, Units 3 and 4, Combined License Application, Revision 0, September 20, 2007 ..................................... South Texas Project, Units 3 and 4, Supplement to Combined License Application ‘‘Safeguards Information,’’ Part 8, Revision 0, September 26, 2007 ...................................................................................................................................................... South Texas Project, Units 3 and 4, Supplement to Combined License Application Revision 0, October 15, 2007 .................. South Texas Project, Units 3 and 4, Supplement to Combined License Application Revision 0, October 18, 2007 .................. South Texas Project, Units 3 and 4, Supplement to Combined License Application Revision 0, November 13, 2007 .............. South Texas Project, Units 3 and 4, Supplement to Combined License Application Revision 0, November 21, 2007 .............. South Texas Project, Units 3 and 4, Combined License Application, Revision 1, January 31, 2008 .......................................... South Texas Project, Units 3 and 4, Submittal of Supplement to Combined License Application ‘‘Safeguards Information,’’ Part 8, Revision 1, January 31, 2008 ........................................................................................................................................ South Texas Project, Units 3 and 4, Combined License Application, Revision 2, September 24, 2008 ..................................... South Texas Project, Units 3 and 4, Submittal of Supplement to Combined License Application ‘‘Safeguards Information,’’ Part 8, Revision 2, September 24, 2008 ................................................................................................................................... South Texas Project, Units 3 and 4, Submittal of Combined License Application, ‘‘Proprietary Information,’’ Part 10, Revision 2, December 11, 2008 ............................................................................................................................................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 3, September 16, 2009 ..................................... South Texas Project, Units 3 and 4, Submittal of Supplement to Combined License Application ‘‘Safeguards Information,’’ Part 8, Revision 3, July 15, 2010 .............................................................................................................................................. South Texas Project, Units 3 and 4, Combined License Application, Revision 4, October 5, 2010 ............................................ VerDate Sep<11>2014 18:18 Apr 27, 2015 Jkt 235001 PO 00000 Frm 00102 Fmt 4703 Sfmt 4703 E:\FR\FM\28APN1.SGM 28APN1 ML072830407 ML072740461 ML072960352 ML072960489 ML073200992 ML073310616 ML080700399 ML080420090 ML082830938 ML082730700 ML083530131 ML092930393 ML102010268 ML102861292 23598 Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices ADAMS Accession No. Document South Texas Project, Units 3 and 4, Submittal of Supplement to Combined License Application ‘‘Safeguards Information,’’ Part 8, Revision 4, February 3, 2011 ........................................................................................................................................ South Texas Project, Units 3 and 4, Update to Change in Lead Applicant, January 19, 2011 ................................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 5, January 26, 2011 .......................................... South Texas Project, Units 3 and 4, Submittal of Supplement to Combined License Application ‘‘Safeguards Information,’’ Part 8, Revision 5, August 30, 2011 .......................................................................................................................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 6, August 30, 2011 ........................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 7, February 1, 2012 .......................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 8, September 17, 2012 ..................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 9, April 17, 2013 ............................................... South Texas Project, Units 3 and 4, Combined License Application, Revision 10, October 29, 2013 ........................................ South Texas Project, Units 3 and 4, Combined License Application, Revision 11, October 21, 2014 ........................................ Dated at Rockville, Maryland, this 22nd day of April 2015. For the Nuclear Regulatory Commission. Samuel Lee, Chief, Licensing Branch 2, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. 2015–09904 Filed 4–27–15; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting The ACRS Subcommittee on Planning and Procedures will hold a meeting on May 6, 2015, Room T–2B3, 11545 Rockville Pike, Rockville, Maryland. The meeting will be open to public attendance with the exception of a portion that may be closed pursuant to 5 U.S.C. 552b(c)(2) and (6) to discuss organizational and personnel matters that relate solely to the internal personnel rules and practices of the ACRS, and information the release of which would constitute a clearly unwarranted invasion of personal privacy. The agenda for the subject meeting shall be as follows: asabaliauskas on DSK5VPTVN1PROD with NOTICES Wednesday, May 6, 2015—12:00 p.m. Until 1:00 p.m. The Subcommittee will discuss proposed ACRS activities and related matters. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Quynh Nguyen (Telephone 301–415–5844 or Email: Quynh.Nguyen@nrc.gov) five days prior to the meeting, if possible, so that arrangements can be made. Thirty-five VerDate Sep<11>2014 18:18 Apr 27, 2015 Jkt 235001 hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 13, 2014 (79 FR 59307). Information regarding changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with the DFO if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North Building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (240–888–9835) to be escorted to the meeting room. Dated: April 16, 2015. Mark L. Banks, Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2015–09862 Filed 4–27–15; 8:45 am] BILLING CODE 7590–01–P PO 00000 Frm 00103 Fmt 4703 Sfmt 4703 ML110400425 ML110250369 ML110340451 ML11243A171 ML11252A505 ML12048A714 ML12291A415 ML13115A094 ML13310A599 ML14307A876 NUCLEAR REGULATORY COMMISSION [NRC–2015–0104] Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Nuclear Regulatory Commission. ACTION: Biweekly notice. AGENCY: Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued from April 2, 2015, to April 14, 2015. The last biweekly notice was published on April 14, 2015. DATES: Comments must be filed by May 28, 2015. A request for a hearing must be filed by June 29, 2015. ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject): • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2015–0104. Address questions about NRC dockets to Carol Gallagher; telephone: 301–415–3463; email: Carol.Gallagher@nrc.gov. For SUMMARY: E:\FR\FM\28APN1.SGM 28APN1

Agencies

[Federal Register Volume 80, Number 81 (Tuesday, April 28, 2015)]
[Notices]
[Pages 23597-23598]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-09904]



[[Page 23597]]

=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-012 and 52-013; NRC-2008-0091]


Nuclear Innovation North America LLC; South Texas Project, Units 
3 and 4

AGENCY: Nuclear Regulatory Commission.

ACTION: Combined license application; availability.

-----------------------------------------------------------------------

SUMMARY: On September 20, 2007, South Texas Project Nuclear Operating 
Company (STPNOC) submitted to the U.S. Nuclear Regulatory Commission 
(NRC) an application for combined licenses (COLs) for two additional 
units (Units 3 and 4) at the South Texas Project (STP) Electric 
Generating Station site in Matagorda County near Bay City, Texas. The 
NRC published a notice of receipt and availability for this COL 
application in the Federal Register on December 5, 2007. In a letter 
dated January 19, 2011, STPNOC notified the NRC that, effective January 
24, 2011, Nuclear Innovation North America LLC (NINA) became the lead 
applicant for STP, Units 3 and 4. This notice is being published to 
notify the public of the availability of the COL application for STP, 
Units 3 and 4.

DATES: The COL application is available on April 28, 2015.

ADDRESSES: Please refer to Docket ID NRC-2008-0091 when contacting the 
NRC about the availability of information regarding this document. You 
may access publicly-available information related to this action by the 
following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0091. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it available in 
ADAMS) is provided the first time that a document is referenced. For 
the convenience of the reader, the ADAMS accession numbers are provided 
in a table in the ``Availability of Documents'' section of this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Tom Tai, telephone: 301-415-8484, 
email: Tom.Tai@nrc.gov; or Luis Betancourt, telephone: 301-415-6145, 
email: Luis.Betancourt@nrc.gov. Both are staff of the Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001.

SUPPLEMENTARY INFORMATION: On September 20, 2007, the NRC received a 
COL application from STPNOC, filed pursuant to section 103 of the 
Atomic Energy Act of 1954, as amended, and part 52 of title 10 of the 
Code of Federal Regulations (10 CFR), ``Licenses, Certifications, and 
Approvals for Nuclear Power Plants,'' to construct and operate two 
additional units (Units 3 and 4) at the STP Electric Generating Station 
site in Matagorda County near Bay City, Texas. The additional units are 
based on the U.S. Advanced Boiling Water Reactor design, which is 
certified in 10 CFR part 52, appendix A. The NRC published a notice of 
receipt and availability for an application for a COL in the Federal 
Register on December 5, 2007 (72 FR 68597). In a letter dated January 
19, 2011, STPNOC notified the NRC that, effective January 24, 2011, 
NINA became the lead applicant for STP, Units 3 and 4. As such, NINA 
assumed responsibility for the design, construction and licensing of 
STP, Units 3 and 4. The application is currently under review by the 
NRC.
    An applicant may seek a COL in accordance with subpart C of 10 CFR 
part 52. The information submitted by the applicant includes certain 
administrative information, such as financial qualifications submitted 
pursuant to 10 CFR 52.77, as well as technical information submitted 
pursuant to 10 CFR 52.79. This notice is being provided in accordance 
with the requirements in 10 CFR 50.43(a)(3).

Availability of Documents

    The documents identified in the following table are available to 
interested persons through the ADAMS Public Documents collection. A 
copy of the COL application is also available for public inspection at 
the NRC's PDR and at https://www.nrc.gov/reactors/new-reactors/col.html.

------------------------------------------------------------------------
                                                        ADAMS  Accession
                       Document                               No.
------------------------------------------------------------------------
South Texas Project, Units 3 and 4, Combined License         ML072830407
 Application, Revision 0, September 20, 2007.........
South Texas Project, Units 3 and 4, Supplement to            ML072740461
 Combined License Application ``Safeguards
 Information,'' Part 8, Revision 0, September 26,
 2007................................................
South Texas Project, Units 3 and 4, Supplement to            ML072960352
 Combined License Application Revision 0, October 15,
 2007................................................
South Texas Project, Units 3 and 4, Supplement to            ML072960489
 Combined License Application Revision 0, October 18,
 2007................................................
South Texas Project, Units 3 and 4, Supplement to            ML073200992
 Combined License Application Revision 0, November
 13, 2007............................................
South Texas Project, Units 3 and 4, Supplement to            ML073310616
 Combined License Application Revision 0, November
 21, 2007............................................
South Texas Project, Units 3 and 4, Combined License         ML080700399
 Application, Revision 1, January 31, 2008...........
South Texas Project, Units 3 and 4, Submittal of             ML080420090
 Supplement to Combined License Application
 ``Safeguards Information,'' Part 8, Revision 1,
 January 31, 2008....................................
South Texas Project, Units 3 and 4, Combined License         ML082830938
 Application, Revision 2, September 24, 2008.........
South Texas Project, Units 3 and 4, Submittal of             ML082730700
 Supplement to Combined License Application
 ``Safeguards Information,'' Part 8, Revision 2,
 September 24, 2008..................................
South Texas Project, Units 3 and 4, Submittal of             ML083530131
 Combined License Application, ``Proprietary
 Information,'' Part 10, Revision 2, December 11,
 2008................................................
South Texas Project, Units 3 and 4, Combined License         ML092930393
 Application, Revision 3, September 16, 2009.........
South Texas Project, Units 3 and 4, Submittal of             ML102010268
 Supplement to Combined License Application
 ``Safeguards Information,'' Part 8, Revision 3, July
 15, 2010............................................
South Texas Project, Units 3 and 4, Combined License         ML102861292
 Application, Revision 4, October 5, 2010............

[[Page 23598]]

 
South Texas Project, Units 3 and 4, Submittal of             ML110400425
 Supplement to Combined License Application
 ``Safeguards Information,'' Part 8, Revision 4,
 February 3, 2011....................................
South Texas Project, Units 3 and 4, Update to Change         ML110250369
 in Lead Applicant, January 19, 2011.................
South Texas Project, Units 3 and 4, Combined License         ML110340451
 Application, Revision 5, January 26, 2011...........
South Texas Project, Units 3 and 4, Submittal of             ML11243A171
 Supplement to Combined License Application
 ``Safeguards Information,'' Part 8, Revision 5,
 August 30, 2011.....................................
South Texas Project, Units 3 and 4, Combined License         ML11252A505
 Application, Revision 6, August 30, 2011............
South Texas Project, Units 3 and 4, Combined License         ML12048A714
 Application, Revision 7, February 1, 2012...........
South Texas Project, Units 3 and 4, Combined License         ML12291A415
 Application, Revision 8, September 17, 2012.........
South Texas Project, Units 3 and 4, Combined License         ML13115A094
 Application, Revision 9, April 17, 2013.............
South Texas Project, Units 3 and 4, Combined License         ML13310A599
 Application, Revision 10, October 29, 2013..........
South Texas Project, Units 3 and 4, Combined License         ML14307A876
 Application, Revision 11, October 21, 2014..........
------------------------------------------------------------------------


    Dated at Rockville, Maryland, this 22nd day of April 2015.

    For the Nuclear Regulatory Commission.
Samuel Lee,
Chief, Licensing Branch 2, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2015-09904 Filed 4-27-15; 8:45 am]
 BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.