Environmental Impact Statements; Notice of Availability, 22992 [2015-09611]
Download as PDF
22992
Federal Register / Vol. 80, No. 79 / Friday, April 24, 2015 / Notices
Administrator of the initial compliance
status of the source. Sources are also
required to monitor and maintain
records of its operations including: (1)
Process or control device parameters; (2)
bag leak detention systems; (3)
maintenance plan for air pollution
control devices (e.g., capture system and
venturi scrubbers); (4) certification that
monitoring devices are accurate; and (5)
the implementation and corrective
actions taken related to the startup,
shutdown and malfunction plan and the
fugitive dust control plan. The types of
periodic reports required by this
regulation include: Opacity-related
reports; performance test results reports;
immediate and periodic startup,
shutdown, and malfunction reports;
quarterly emissions reports; capture
hood inspection reports; fugitive dust
operations reports; and annual
compliance status reports. These
notifications, reports, and records are
essential in determining compliance,
and are required of all sources subject
to NESHAP standards. This information
is collected to assure compliance with
40 CFR part 63, subpart XXX.
Form Numbers: None.
Respondents/affected entities:
Ferroalloy production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
XXX).
Estimated number of respondents: 1
(total).
Frequency of response: Initially,
quarterly, semiannually, and annually.
Total estimated burden: 600 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $57,000 (per
year), includes $0 annualized capital or
operation & maintenance costs.
Changes in the Estimates: There is a
slight increase of 16 hours in the total
estimated respondent burden compared
with the ICR currently approved by
OMB. This is due to the rounding of
estimates.
Courtney Kerwin,
Acting Director, Collection Strategies
Division.
[FR Doc. 2015–09507 Filed 4–23–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
tkelley on DSK3SPTVN1PROD with NOTICES
[ER–FRL–9020–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
VerDate Sep<11>2014
17:30 Apr 23, 2015
Jkt 235001
Weekly receipt of Environmental Impact
Statements
Filed 04/13/2015 Through 04/17/2015
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20150107, Draft EIS, BLM, OR,
Western Oregon Draft Resource
Management Plan, Comment Period
Ends: 06/08/15, Contact: Mark Brown,
503–808–6233.
EIS No. 20150108, Draft EIS, USA, HI,
Schofield Generating Station Project
at United States Army Garrison,
Comment Period Ends: 06/08/2015,
Contact: Lisa Graham 808–656–3109.
EIS No. 20150109, Draft EIS, STB, MT,
Tongue River Railroad, Comment
Period Ends: 06/23/2015, Contact:
Ken Blodgett 1–866–622–4355.
EIS No. 20150110, Final EIS, USFS, OR,
Malheur National Forest Site-Specific
Invasive Plants Treatment, Review
Period Ends: 06/08/2015, Contact:
Joseph Rausch 541–575–3141.
EIS No. 20150111, Draft EIS, NRC, PA,
Combined License (COL) for the Bell
Bend Nuclear Power Plant, Comment
Period Ends: 07/07/2015, Contact:
Tomeka Terry 301–415–1488.
EIS No. 20150112, Final EIS, GSA, VA,
U.S. Department of State Foreign
Affairs Security Training Center,
Review Period Ends: 05/26/2015,
Contact: Abby Low 215–446–4585.
EIS No. 20150113, Final EIS, USA, AZ,
PROGRAMMATIC—Yuma Proving
Ground Activities and Operations,
Review Period Ends: 05/26/2015,
Contact: Sergio Obregon 928–328–
2015.
EIS No. 20150114, Final EIS, FHWA,
CA, Mid County Parkway, Review
Period Ends: 05/26/2015, Contact: Tay
Dam 213–894–5918.
EIS No. 20150115, Final EIS, FAA, 00,
ADOPTION—Powder River Training
Complex, Ellsworth Air Force Base,
Contact: William Burris 202–267–
8656.
The U.S. Department of
Transportation’s, Federal Aviation
Administration (FAA) has adopted the
U.S. Air Force’s FEIS #20140334, filed
with the USEPA on 11/19/2014. FAA
was a cooperating agency on the project
and recirculation of the document is not
necessary under Section 1506.3(c) of the
CEQ Regulations.
EIS No. 20150116, Final EIS, DOE, TX,
ADOPTION—Corpus Christi
Liquefied Natural Gas (LNG) Project,
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Contact: John Anderson 202–586–
0521.
The U.S. Department of Energy (DOE)
has adopted the Federal Energy
Regulatory Commission’s FEIS
#20140302, filed with the U.S. EPA on
10/08/2014. DOE was a cooperating
agency on the project and recirculation
of the document is not necessary under
Section 1506.3(c) of the CEQ
Regulations.
Dated: April 21, 2015.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2015–09611 Filed 4–23–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0034; FRL 9925–38–
OEI ]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NSPS
for Kraft Pulp Mills (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), ‘‘NSPS for Kraft
Pulp Mills (40 CFR part 60, subpart BB)
(Renewal)’’ (EPA ICR No. 1055.11, OMB
Control No. 2060–0021) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (44 U.S.C.
3501 et seq.). This is a proposed
extension of the ICR, which is currently
approved through April 30, 2015. Public
comments were previously requested
via the Federal Register(79 FR 30117)
on May 27, 2014 during a 60-day
comment period. This notice allows for
an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An Agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before May 26, 2015.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0034, to (1) EPA
online using www.regulations.gov (our
preferred method), by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
SUMMARY:
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 80, Number 79 (Friday, April 24, 2015)]
[Notices]
[Page 22992]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-09611]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9020-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 04/13/2015 Through 04/17/2015
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20150107, Draft EIS, BLM, OR, Western Oregon Draft Resource
Management Plan, Comment Period Ends: 06/08/15, Contact: Mark Brown,
503-808-6233.
EIS No. 20150108, Draft EIS, USA, HI, Schofield Generating Station
Project at United States Army Garrison, Comment Period Ends: 06/08/
2015, Contact: Lisa Graham 808-656-3109.
EIS No. 20150109, Draft EIS, STB, MT, Tongue River Railroad, Comment
Period Ends: 06/23/2015, Contact: Ken Blodgett 1-866-622-4355.
EIS No. 20150110, Final EIS, USFS, OR, Malheur National Forest Site-
Specific Invasive Plants Treatment, Review Period Ends: 06/08/2015,
Contact: Joseph Rausch 541-575-3141.
EIS No. 20150111, Draft EIS, NRC, PA, Combined License (COL) for the
Bell Bend Nuclear Power Plant, Comment Period Ends: 07/07/2015,
Contact: Tomeka Terry 301-415-1488.
EIS No. 20150112, Final EIS, GSA, VA, U.S. Department of State Foreign
Affairs Security Training Center, Review Period Ends: 05/26/2015,
Contact: Abby Low 215-446-4585.
EIS No. 20150113, Final EIS, USA, AZ, PROGRAMMATIC--Yuma Proving Ground
Activities and Operations, Review Period Ends: 05/26/2015, Contact:
Sergio Obregon 928-328-2015.
EIS No. 20150114, Final EIS, FHWA, CA, Mid County Parkway, Review
Period Ends: 05/26/2015, Contact: Tay Dam 213-894-5918.
EIS No. 20150115, Final EIS, FAA, 00, ADOPTION--Powder River Training
Complex, Ellsworth Air Force Base, Contact: William Burris 202-267-
8656.
The U.S. Department of Transportation's, Federal Aviation
Administration (FAA) has adopted the U.S. Air Force's FEIS #20140334,
filed with the USEPA on 11/19/2014. FAA was a cooperating agency on the
project and recirculation of the document is not necessary under
Section 1506.3(c) of the CEQ Regulations.
EIS No. 20150116, Final EIS, DOE, TX, ADOPTION--Corpus Christi
Liquefied Natural Gas (LNG) Project, Contact: John Anderson 202-586-
0521.
The U.S. Department of Energy (DOE) has adopted the Federal Energy
Regulatory Commission's FEIS #20140302, filed with the U.S. EPA on 10/
08/2014. DOE was a cooperating agency on the project and recirculation
of the document is not necessary under Section 1506.3(c) of the CEQ
Regulations.
Dated: April 21, 2015.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2015-09611 Filed 4-23-15; 8:45 am]
BILLING CODE 6560-50-P