Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (Renewal), 22991-22992 [2015-09507]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 79 / Friday, April 24, 2015 / Notices Applicants: PJM Interconnection, L.L.C. Description: Annual Compliance Report Regarding Operating Penalties of PJM Interconnection, L.L.C. Filed Date: 4/17/15. Accession Number: 20150417–5387. Comments Due: 5 p.m. ET 5/8/15. Docket Numbers: ER15–1530–000. Applicants: New England Power Company. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Amendment to REMVEC II Agreement and Request for Waiver of Notice Requirement to be effective 4/30/2015. Filed Date: 4/17/15. Accession Number: 20150417–5343. Comments Due: 5 p.m. ET 5/8/15. Docket Numbers: ER15–1531–000. Applicants: Southwest Power Pool, Inc. Description: Compliance filing per 35: Distribution of Penalty Revenues for Non-Firm PTP to be effective 4/17/2015. Filed Date: 4/20/15. Accession Number: 20150420–5001. Comments Due: 5 p.m. ET 5/11/15. Docket Numbers: ER15–1532–000. Applicants: Southern California Edison Company. Description: Tariff Withdrawal per 35.15: Notices of Cancellation SGIA and Distribution Serv Agmt Greenpower Williams LLC to be effective 6/20/2015. Filed Date: 4/20/15. Accession Number: 20150420–5005. Comments Due: 5 p.m. ET 5/11/15. Docket Numbers: ER15–1533–000. Applicants: DTE Electric Company. Description: Notice of Cancellation of Electric Rate Schedule FERC No. 23 of DTE Electric Company. Filed Date: 4/17/15. Accession Number: 20150417–5355. Comments Due: 5 p.m. ET 5/8/15. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES15–17–000. Applicants: PJM Interconnection, L.L.C., PJM Settlement, Inc. Description: Application of PJM Interconnection, L.L.C. and PJM Settlement, Inc. Under Section 204 of the Federal Power Act for an Order Authorizing Issuances of Securities and Approving Guranty. Filed Date: 4/17/15. Accession Number: 20150417–5356. Comments Due: 5 p.m. ET 5/8/15. Docket Numbers: ES15–18–000. Applicants: MDU Resources Group, Inc. Description: Application to issue securities and authorization to engage in methods of issuance other than VerDate Sep<11>2014 17:30 Apr 23, 2015 Jkt 235001 competitive bidding and negotiated offers for 401(k) retirement plan of MDU Resources Group, Inc. Filed Date: 4/17/15. Accession Number: 20150417–5388. Comments Due: 5 p.m. ET 5/8/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 20, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–09551 Filed 4–23–15; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2014–0066; FRL–9925– 54–OEI] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency has submitted an information collection request (ICR), ‘‘NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (40 CFR part 63, subpart XXX)(Renewal)’’ (EPA ICR No. 1831.06, OMB Control No. 2060–0391) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through April, 30, 2015. Public comments were previously requested via the Federal Register (79 FR 30117) on May 27, 2014 during a 60-day comment period. This SUMMARY: PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 22991 notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before May 26, 2015. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2014–0066, to (1) EPA online using www.regulations.gov (our preferred method), by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460, and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564–2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit https://www.epa.gov/ dockets. Abstract: The NESHAP applies to ferroalloy production facilities that manufacture ferromanganese and silicomanganese that are major sources of hazardous air pollutants (HAPs) or are co-located at major sources of HAPs. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports. Respondents that are not required to conduct an initial performance test are required to notify the EPA E:\FR\FM\24APN1.SGM 24APN1 22992 Federal Register / Vol. 80, No. 79 / Friday, April 24, 2015 / Notices Administrator of the initial compliance status of the source. Sources are also required to monitor and maintain records of its operations including: (1) Process or control device parameters; (2) bag leak detention systems; (3) maintenance plan for air pollution control devices (e.g., capture system and venturi scrubbers); (4) certification that monitoring devices are accurate; and (5) the implementation and corrective actions taken related to the startup, shutdown and malfunction plan and the fugitive dust control plan. The types of periodic reports required by this regulation include: Opacity-related reports; performance test results reports; immediate and periodic startup, shutdown, and malfunction reports; quarterly emissions reports; capture hood inspection reports; fugitive dust operations reports; and annual compliance status reports. These notifications, reports, and records are essential in determining compliance, and are required of all sources subject to NESHAP standards. This information is collected to assure compliance with 40 CFR part 63, subpart XXX. Form Numbers: None. Respondents/affected entities: Ferroalloy production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart XXX). Estimated number of respondents: 1 (total). Frequency of response: Initially, quarterly, semiannually, and annually. Total estimated burden: 600 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $57,000 (per year), includes $0 annualized capital or operation & maintenance costs. Changes in the Estimates: There is a slight increase of 16 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This is due to the rounding of estimates. Courtney Kerwin, Acting Director, Collection Strategies Division. [FR Doc. 2015–09507 Filed 4–23–15; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY tkelley on DSK3SPTVN1PROD with NOTICES [ER–FRL–9020–6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. VerDate Sep<11>2014 17:30 Apr 23, 2015 Jkt 235001 Weekly receipt of Environmental Impact Statements Filed 04/13/2015 Through 04/17/2015 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20150107, Draft EIS, BLM, OR, Western Oregon Draft Resource Management Plan, Comment Period Ends: 06/08/15, Contact: Mark Brown, 503–808–6233. EIS No. 20150108, Draft EIS, USA, HI, Schofield Generating Station Project at United States Army Garrison, Comment Period Ends: 06/08/2015, Contact: Lisa Graham 808–656–3109. EIS No. 20150109, Draft EIS, STB, MT, Tongue River Railroad, Comment Period Ends: 06/23/2015, Contact: Ken Blodgett 1–866–622–4355. EIS No. 20150110, Final EIS, USFS, OR, Malheur National Forest Site-Specific Invasive Plants Treatment, Review Period Ends: 06/08/2015, Contact: Joseph Rausch 541–575–3141. EIS No. 20150111, Draft EIS, NRC, PA, Combined License (COL) for the Bell Bend Nuclear Power Plant, Comment Period Ends: 07/07/2015, Contact: Tomeka Terry 301–415–1488. EIS No. 20150112, Final EIS, GSA, VA, U.S. Department of State Foreign Affairs Security Training Center, Review Period Ends: 05/26/2015, Contact: Abby Low 215–446–4585. EIS No. 20150113, Final EIS, USA, AZ, PROGRAMMATIC—Yuma Proving Ground Activities and Operations, Review Period Ends: 05/26/2015, Contact: Sergio Obregon 928–328– 2015. EIS No. 20150114, Final EIS, FHWA, CA, Mid County Parkway, Review Period Ends: 05/26/2015, Contact: Tay Dam 213–894–5918. EIS No. 20150115, Final EIS, FAA, 00, ADOPTION—Powder River Training Complex, Ellsworth Air Force Base, Contact: William Burris 202–267– 8656. The U.S. Department of Transportation’s, Federal Aviation Administration (FAA) has adopted the U.S. Air Force’s FEIS #20140334, filed with the USEPA on 11/19/2014. FAA was a cooperating agency on the project and recirculation of the document is not necessary under Section 1506.3(c) of the CEQ Regulations. EIS No. 20150116, Final EIS, DOE, TX, ADOPTION—Corpus Christi Liquefied Natural Gas (LNG) Project, PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Contact: John Anderson 202–586– 0521. The U.S. Department of Energy (DOE) has adopted the Federal Energy Regulatory Commission’s FEIS #20140302, filed with the U.S. EPA on 10/08/2014. DOE was a cooperating agency on the project and recirculation of the document is not necessary under Section 1506.3(c) of the CEQ Regulations. Dated: April 21, 2015. Cliff Rader, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2015–09611 Filed 4–23–15; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2014–0034; FRL 9925–38– OEI ] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Kraft Pulp Mills (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency has submitted an information collection request (ICR), ‘‘NSPS for Kraft Pulp Mills (40 CFR part 60, subpart BB) (Renewal)’’ (EPA ICR No. 1055.11, OMB Control No. 2060–0021) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through April 30, 2015. Public comments were previously requested via the Federal Register(79 FR 30117) on May 27, 2014 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before May 26, 2015. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2014–0034, to (1) EPA online using www.regulations.gov (our preferred method), by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, SUMMARY: E:\FR\FM\24APN1.SGM 24APN1

Agencies

[Federal Register Volume 80, Number 79 (Friday, April 24, 2015)]
[Notices]
[Pages 22991-22992]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-09507]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2014-0066; FRL-9925-54-OEI]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Ferroalloys Production: 
Ferromanganese and Silicomanganese (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency has submitted an 
information collection request (ICR), ``NESHAP for Ferroalloys 
Production: Ferromanganese and Silicomanganese (40 CFR part 63, subpart 
XXX)(Renewal)'' (EPA ICR No. 1831.06, OMB Control No. 2060-0391) to the 
Office of Management and Budget (OMB) for review and approval in 
accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). 
This is a proposed extension of the ICR, which is currently approved 
through April, 30, 2015. Public comments were previously requested via 
the Federal Register (79 FR 30117) on May 27, 2014 during a 60-day 
comment period. This notice allows for an additional 30 days for public 
comments. A fuller description of the ICR is given below, including its 
estimated burden and cost to the public. An Agency may not conduct or 
sponsor and a person is not required to respond to a collection of 
information unless it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before May 26, 2015.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2014-0066, to (1) EPA online using www.regulations.gov (our 
preferred method), by email to docket.oeca@epa.gov, or by mail to: EPA 
Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 
Pennsylvania Ave. NW., Washington, DC 20460, and (2) OMB via email to 
oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for 
EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. 
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax 
number: (202) 564-0050; email address: yellin.patrick@epa.gov.

SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at 
www.regulations.gov or in person at the EPA Docket Center, EPA West, 
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit https://www.epa.gov/dockets.
    Abstract: The NESHAP applies to ferroalloy production facilities 
that manufacture ferromanganese and silicomanganese that are major 
sources of hazardous air pollutants (HAPs) or are co-located at major 
sources of HAPs. In general, all NESHAP standards require initial 
notifications, performance tests, and periodic reports. Respondents 
that are not required to conduct an initial performance test are 
required to notify the EPA

[[Page 22992]]

Administrator of the initial compliance status of the source. Sources 
are also required to monitor and maintain records of its operations 
including: (1) Process or control device parameters; (2) bag leak 
detention systems; (3) maintenance plan for air pollution control 
devices (e.g., capture system and venturi scrubbers); (4) certification 
that monitoring devices are accurate; and (5) the implementation and 
corrective actions taken related to the startup, shutdown and 
malfunction plan and the fugitive dust control plan. The types of 
periodic reports required by this regulation include: Opacity-related 
reports; performance test results reports; immediate and periodic 
startup, shutdown, and malfunction reports; quarterly emissions 
reports; capture hood inspection reports; fugitive dust operations 
reports; and annual compliance status reports. These notifications, 
reports, and records are essential in determining compliance, and are 
required of all sources subject to NESHAP standards. This information 
is collected to assure compliance with 40 CFR part 63, subpart XXX.
    Form Numbers: None.
    Respondents/affected entities: Ferroalloy production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart XXX).
    Estimated number of respondents: 1 (total).
    Frequency of response: Initially, quarterly, semiannually, and 
annually.
    Total estimated burden: 600 hours (per year). Burden is defined at 
5 CFR 1320.3(b).
    Total estimated cost: $57,000 (per year), includes $0 annualized 
capital or operation & maintenance costs.
    Changes in the Estimates: There is a slight increase of 16 hours in 
the total estimated respondent burden compared with the ICR currently 
approved by OMB. This is due to the rounding of estimates.

Courtney Kerwin,
Acting Director, Collection Strategies Division.
[FR Doc. 2015-09507 Filed 4-23-15; 8:45 am]
 BILLING CODE 6560-50-P