Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (Renewal), 22991-22992 [2015-09507]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 79 / Friday, April 24, 2015 / Notices
Applicants: PJM Interconnection,
L.L.C.
Description: Annual Compliance
Report Regarding Operating Penalties of
PJM Interconnection, L.L.C.
Filed Date: 4/17/15.
Accession Number: 20150417–5387.
Comments Due: 5 p.m. ET 5/8/15.
Docket Numbers: ER15–1530–000.
Applicants: New England Power
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Amendment to
REMVEC II Agreement and Request for
Waiver of Notice Requirement to be
effective 4/30/2015.
Filed Date: 4/17/15.
Accession Number: 20150417–5343.
Comments Due: 5 p.m. ET 5/8/15.
Docket Numbers: ER15–1531–000.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing per 35:
Distribution of Penalty Revenues for
Non-Firm PTP to be effective 4/17/2015.
Filed Date: 4/20/15.
Accession Number: 20150420–5001.
Comments Due: 5 p.m. ET 5/11/15.
Docket Numbers: ER15–1532–000.
Applicants: Southern California
Edison Company.
Description: Tariff Withdrawal per
35.15: Notices of Cancellation SGIA and
Distribution Serv Agmt Greenpower
Williams LLC to be effective 6/20/2015.
Filed Date: 4/20/15.
Accession Number: 20150420–5005.
Comments Due: 5 p.m. ET 5/11/15.
Docket Numbers: ER15–1533–000.
Applicants: DTE Electric Company.
Description: Notice of Cancellation of
Electric Rate Schedule FERC No. 23 of
DTE Electric Company.
Filed Date: 4/17/15.
Accession Number: 20150417–5355.
Comments Due: 5 p.m. ET 5/8/15.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES15–17–000.
Applicants: PJM Interconnection,
L.L.C., PJM Settlement, Inc.
Description: Application of PJM
Interconnection, L.L.C. and PJM
Settlement, Inc. Under Section 204 of
the Federal Power Act for an Order
Authorizing Issuances of Securities and
Approving Guranty.
Filed Date: 4/17/15.
Accession Number: 20150417–5356.
Comments Due: 5 p.m. ET 5/8/15.
Docket Numbers: ES15–18–000.
Applicants: MDU Resources Group,
Inc.
Description: Application to issue
securities and authorization to engage in
methods of issuance other than
VerDate Sep<11>2014
17:30 Apr 23, 2015
Jkt 235001
competitive bidding and negotiated
offers for 401(k) retirement plan of MDU
Resources Group, Inc.
Filed Date: 4/17/15.
Accession Number: 20150417–5388.
Comments Due: 5 p.m. ET 5/8/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 20, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–09551 Filed 4–23–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0066; FRL–9925–
54–OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Ferroalloys Production:
Ferromanganese and Silicomanganese
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), ‘‘NESHAP for
Ferroalloys Production: Ferromanganese
and Silicomanganese (40 CFR part 63,
subpart XXX)(Renewal)’’ (EPA ICR No.
1831.06, OMB Control No. 2060–0391)
to the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act (44 U.S.C. 3501 et seq.).
This is a proposed extension of the ICR,
which is currently approved through
April, 30, 2015. Public comments were
previously requested via the Federal
Register (79 FR 30117) on May 27, 2014
during a 60-day comment period. This
SUMMARY:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
22991
notice allows for an additional 30 days
for public comments. A fuller
description of the ICR is given below,
including its estimated burden and cost
to the public. An Agency may not
conduct or sponsor and a person is not
required to respond to a collection of
information unless it displays a
currently valid OMB control number.
DATES: Additional comments may be
submitted on or before May 26, 2015.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0066, to (1) EPA
online using www.regulations.gov (our
preferred method), by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW.,
Washington, DC 20460, and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460; telephone number: (202)
564–2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
EPA West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Abstract: The NESHAP applies to
ferroalloy production facilities that
manufacture ferromanganese and
silicomanganese that are major sources
of hazardous air pollutants (HAPs) or
are co-located at major sources of HAPs.
In general, all NESHAP standards
require initial notifications,
performance tests, and periodic reports.
Respondents that are not required to
conduct an initial performance test are
required to notify the EPA
E:\FR\FM\24APN1.SGM
24APN1
22992
Federal Register / Vol. 80, No. 79 / Friday, April 24, 2015 / Notices
Administrator of the initial compliance
status of the source. Sources are also
required to monitor and maintain
records of its operations including: (1)
Process or control device parameters; (2)
bag leak detention systems; (3)
maintenance plan for air pollution
control devices (e.g., capture system and
venturi scrubbers); (4) certification that
monitoring devices are accurate; and (5)
the implementation and corrective
actions taken related to the startup,
shutdown and malfunction plan and the
fugitive dust control plan. The types of
periodic reports required by this
regulation include: Opacity-related
reports; performance test results reports;
immediate and periodic startup,
shutdown, and malfunction reports;
quarterly emissions reports; capture
hood inspection reports; fugitive dust
operations reports; and annual
compliance status reports. These
notifications, reports, and records are
essential in determining compliance,
and are required of all sources subject
to NESHAP standards. This information
is collected to assure compliance with
40 CFR part 63, subpart XXX.
Form Numbers: None.
Respondents/affected entities:
Ferroalloy production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
XXX).
Estimated number of respondents: 1
(total).
Frequency of response: Initially,
quarterly, semiannually, and annually.
Total estimated burden: 600 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $57,000 (per
year), includes $0 annualized capital or
operation & maintenance costs.
Changes in the Estimates: There is a
slight increase of 16 hours in the total
estimated respondent burden compared
with the ICR currently approved by
OMB. This is due to the rounding of
estimates.
Courtney Kerwin,
Acting Director, Collection Strategies
Division.
[FR Doc. 2015–09507 Filed 4–23–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
tkelley on DSK3SPTVN1PROD with NOTICES
[ER–FRL–9020–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
VerDate Sep<11>2014
17:30 Apr 23, 2015
Jkt 235001
Weekly receipt of Environmental Impact
Statements
Filed 04/13/2015 Through 04/17/2015
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20150107, Draft EIS, BLM, OR,
Western Oregon Draft Resource
Management Plan, Comment Period
Ends: 06/08/15, Contact: Mark Brown,
503–808–6233.
EIS No. 20150108, Draft EIS, USA, HI,
Schofield Generating Station Project
at United States Army Garrison,
Comment Period Ends: 06/08/2015,
Contact: Lisa Graham 808–656–3109.
EIS No. 20150109, Draft EIS, STB, MT,
Tongue River Railroad, Comment
Period Ends: 06/23/2015, Contact:
Ken Blodgett 1–866–622–4355.
EIS No. 20150110, Final EIS, USFS, OR,
Malheur National Forest Site-Specific
Invasive Plants Treatment, Review
Period Ends: 06/08/2015, Contact:
Joseph Rausch 541–575–3141.
EIS No. 20150111, Draft EIS, NRC, PA,
Combined License (COL) for the Bell
Bend Nuclear Power Plant, Comment
Period Ends: 07/07/2015, Contact:
Tomeka Terry 301–415–1488.
EIS No. 20150112, Final EIS, GSA, VA,
U.S. Department of State Foreign
Affairs Security Training Center,
Review Period Ends: 05/26/2015,
Contact: Abby Low 215–446–4585.
EIS No. 20150113, Final EIS, USA, AZ,
PROGRAMMATIC—Yuma Proving
Ground Activities and Operations,
Review Period Ends: 05/26/2015,
Contact: Sergio Obregon 928–328–
2015.
EIS No. 20150114, Final EIS, FHWA,
CA, Mid County Parkway, Review
Period Ends: 05/26/2015, Contact: Tay
Dam 213–894–5918.
EIS No. 20150115, Final EIS, FAA, 00,
ADOPTION—Powder River Training
Complex, Ellsworth Air Force Base,
Contact: William Burris 202–267–
8656.
The U.S. Department of
Transportation’s, Federal Aviation
Administration (FAA) has adopted the
U.S. Air Force’s FEIS #20140334, filed
with the USEPA on 11/19/2014. FAA
was a cooperating agency on the project
and recirculation of the document is not
necessary under Section 1506.3(c) of the
CEQ Regulations.
EIS No. 20150116, Final EIS, DOE, TX,
ADOPTION—Corpus Christi
Liquefied Natural Gas (LNG) Project,
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Contact: John Anderson 202–586–
0521.
The U.S. Department of Energy (DOE)
has adopted the Federal Energy
Regulatory Commission’s FEIS
#20140302, filed with the U.S. EPA on
10/08/2014. DOE was a cooperating
agency on the project and recirculation
of the document is not necessary under
Section 1506.3(c) of the CEQ
Regulations.
Dated: April 21, 2015.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2015–09611 Filed 4–23–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0034; FRL 9925–38–
OEI ]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NSPS
for Kraft Pulp Mills (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), ‘‘NSPS for Kraft
Pulp Mills (40 CFR part 60, subpart BB)
(Renewal)’’ (EPA ICR No. 1055.11, OMB
Control No. 2060–0021) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (44 U.S.C.
3501 et seq.). This is a proposed
extension of the ICR, which is currently
approved through April 30, 2015. Public
comments were previously requested
via the Federal Register(79 FR 30117)
on May 27, 2014 during a 60-day
comment period. This notice allows for
an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An Agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before May 26, 2015.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0034, to (1) EPA
online using www.regulations.gov (our
preferred method), by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
SUMMARY:
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 80, Number 79 (Friday, April 24, 2015)]
[Notices]
[Pages 22991-22992]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-09507]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OECA-2014-0066; FRL-9925-54-OEI]
Information Collection Request Submitted to OMB for Review and
Approval; Comment Request; NESHAP for Ferroalloys Production:
Ferromanganese and Silicomanganese (Renewal)
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency has submitted an
information collection request (ICR), ``NESHAP for Ferroalloys
Production: Ferromanganese and Silicomanganese (40 CFR part 63, subpart
XXX)(Renewal)'' (EPA ICR No. 1831.06, OMB Control No. 2060-0391) to the
Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).
This is a proposed extension of the ICR, which is currently approved
through April, 30, 2015. Public comments were previously requested via
the Federal Register (79 FR 30117) on May 27, 2014 during a 60-day
comment period. This notice allows for an additional 30 days for public
comments. A fuller description of the ICR is given below, including its
estimated burden and cost to the public. An Agency may not conduct or
sponsor and a person is not required to respond to a collection of
information unless it displays a currently valid OMB control number.
DATES: Additional comments may be submitted on or before May 26, 2015.
ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2014-0066, to (1) EPA online using www.regulations.gov (our
preferred method), by email to docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW., Washington, DC 20460, and (2) OMB via email to
oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for
EPA.
EPA's policy is that all comments received will be included in the
public docket without change including any personal information
provided, unless the comment includes profanity, threats, information
claimed to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute.
FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring,
Assistance, and Media Programs Division, Office of Compliance, Mail
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave.
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax
number: (202) 564-0050; email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail
the information that the EPA will be collecting are available in the
public docket for this ICR. The docket can be viewed online at
www.regulations.gov or in person at the EPA Docket Center, EPA West,
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone
number for the Docket Center is 202-566-1744. For additional
information about EPA's public docket, visit https://www.epa.gov/dockets.
Abstract: The NESHAP applies to ferroalloy production facilities
that manufacture ferromanganese and silicomanganese that are major
sources of hazardous air pollutants (HAPs) or are co-located at major
sources of HAPs. In general, all NESHAP standards require initial
notifications, performance tests, and periodic reports. Respondents
that are not required to conduct an initial performance test are
required to notify the EPA
[[Page 22992]]
Administrator of the initial compliance status of the source. Sources
are also required to monitor and maintain records of its operations
including: (1) Process or control device parameters; (2) bag leak
detention systems; (3) maintenance plan for air pollution control
devices (e.g., capture system and venturi scrubbers); (4) certification
that monitoring devices are accurate; and (5) the implementation and
corrective actions taken related to the startup, shutdown and
malfunction plan and the fugitive dust control plan. The types of
periodic reports required by this regulation include: Opacity-related
reports; performance test results reports; immediate and periodic
startup, shutdown, and malfunction reports; quarterly emissions
reports; capture hood inspection reports; fugitive dust operations
reports; and annual compliance status reports. These notifications,
reports, and records are essential in determining compliance, and are
required of all sources subject to NESHAP standards. This information
is collected to assure compliance with 40 CFR part 63, subpart XXX.
Form Numbers: None.
Respondents/affected entities: Ferroalloy production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart XXX).
Estimated number of respondents: 1 (total).
Frequency of response: Initially, quarterly, semiannually, and
annually.
Total estimated burden: 600 hours (per year). Burden is defined at
5 CFR 1320.3(b).
Total estimated cost: $57,000 (per year), includes $0 annualized
capital or operation & maintenance costs.
Changes in the Estimates: There is a slight increase of 16 hours in
the total estimated respondent burden compared with the ICR currently
approved by OMB. This is due to the rounding of estimates.
Courtney Kerwin,
Acting Director, Collection Strategies Division.
[FR Doc. 2015-09507 Filed 4-23-15; 8:45 am]
BILLING CODE 6560-50-P