Federal Register / Vol. 80, No. 73 / Thursday, April 16, 2015 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 27, 2015.
Dated: April 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–08710 Filed 4–15–15; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2015–08747 Filed 4–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Federal Energy Regulatory
Commission
[Docket No. NJ15–12–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Oncor Electric Delivery Company LLC;
Notice of Filing
Take notice that on April 6, 2015,
Oncor Electric Delivery Company LLC
submitted its tariff filing per 35.28(e):
Oncor Tex-La Tariff Rate Changes,
Effective March 20, 2015.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
VerDate Sep<11>2014
16:48 Apr 15, 2015
Jkt 235001
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–118–000.
Applicants: Rising Tree Wind Farm
LLC, Rising Tree Wind Farm II LLC.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of Rising Tree Wind
Farm LLC, et. al.
Filed Date: 4/10/15.
Accession Number: 20150410–5153.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: EC15–119–000.
Applicants: American Transmission
Company LLC.
Description: Application for
Authority to Acquire Transmission
Facilities of American Transmission
Company LLC.
Filed Date: 4/10/15.
Accession Number: 20150410–5208.
Comments Due: 5 p.m. ET 5/1/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2570–017.
Applicants: Shady Hills Power
Company, L.L.C.
Description: Amendment to December
16, 2014 Triennial Market Power
Analysis of Shady Hills Power
Company, L.L.C.
Filed Date: 4/3/15.
Accession Number: 20150403–5071.
Comments Due: 5 p.m. ET 4/24/15.
Docket Numbers: ER14–2956–006.
Applicants: Hoopeston Wind, LLC.
Description: Notice of Non-Material
Change in Status of Hoopeston Wind,
LLC.
Filed Date: 4/10/15.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Accession Number: 20150410–5121.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15–527–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing per 35:
Errata to Compliance Filing in Docket
No. ER15–527–000 to be effective 2/2/
2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5150.
Comments Due: 5 p.m. ET 5/1/15
Docket Numbers: ER15–1487–000.
Applicants: PJM Interconnection,
L.L.C., Virginia Electric and Power
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Dominion submits
revisions to OATT Att H–16A re:
prepayments to be effective 1/1/2014.
Filed Date: 4/9/15.
Accession Number: 20150409–5180.
Comments Due: 5 p.m. ET 4/30/15.
Docket Numbers: ER15–1488–000.
Applicants: PJM Interconnection,
L.L.C., PPL Electric Utilities
Corporation.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): PPL submits
revisions to OATT Attachment H–8G re
PBOP expense to be effective 6/1/2015.
Filed Date: 4/9/15.
Accession Number: 20150409–5196.
Comments Due: 5 p.m. ET 4/30/15.
Docket Numbers: ER15–1489–000.
Applicants: PacifiCorp.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): BPA Construction
Agreement (Summer Lake CB & SCADA)
to be effective 6/9/2015.
Filed Date: 4/9/15.
Accession Number: 20150409–5206.
Comments Due: 5 p.m. ET 4/30/15.
Docket Numbers: ER15–1490–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): 2015–04–10_
Attachment O Reconciliation Filing to
be effective 6/1/2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5078.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15–1491–000.
Applicants: El Paso Electric Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Concurrence of EPE
to APS Service Agreement No. 193,
Amendment 3 to be effective 2/11/2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5137.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15–1492–000.
Applicants: El Paso Electric Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Concurrence of EPE
to APS Service Agreement Nos. 190,
E:\FR\FM\16APN1.SGM
16APN1
Federal Register / Vol. 80, No. 73 / Thursday, April 16, 2015 / Notices
192, 194, and 195 to be effective 3/11/
2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5146.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15–1493–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): FAP to be effective
6/12/2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5182.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15–1494–000.
Applicants: Convergent Energy and
Power LLC.
Description: Initial rate filing per
35.12 Petition for Acceptance of Initial
Tariff, Waivers and Blanket Authority to
be effective 6/15/2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5197.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15–1495–000.
Applicants: Alabama Power
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Clay Solar LGIA
Filing to be effective 3/27/2015.
Filed Date: 4/10/15.
Accession Number: 20150410–5253.
Comments Due: 5 p.m. ET 5/1/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–08748 Filed 4–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Lake Charles
Liquefaction Project
tkelley on DSK3SPTVN1PROD with NOTICES
Trunkline Gas Company, LLC .............................................................................................................................
Lake Charles LNG Company, LLC .......................................................................................................................
Lake Charles LNG Export Company, LLC ...........................................................................................................
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Lake Charles Liquefaction
Project, proposed by Trunkline Gas
Company, LLC (Trunkline), Lake
Charles LNG Company, LLC, and Lake
Charles LNG Export Company, LLC in
the above-referenced dockets. Trunkline
requests authorization to construct,
install, and operate new natural gas
pipeline and compression facilities and
meter stations; modify certain existing
pipeline facilities; modify certain
compressor and meter stations; and
abandon one compressor unit in the
states of Arkansas, Mississippi, and
Louisiana (collectively referred to as the
Non-Liquefaction Facilities). Lake
Charles LNG Company, LLC and Lake
Charles LNG Export Company, LLC
(collectively referred to as Lake Charles
LNG) jointly request authorization to
site, construct, and operate new
liquefaction facilities adjacent to an
existing liquefied natural gas (LNG)
terminal located in Calcasieu Parish,
Louisiana, and to construct and operate
certain facility modifications at the
existing LNG terminal. The new
liquefaction facilities would have a
design production capacity of 16.45
million metric tons of LNG per annum.
Lake Charles LNG Company, LLC also
requests authorization to abandon
certain terminal facilities previously
certificated under the Natural Gas Act
(NGA) section 7; abandon services
VerDate Sep<11>2014
16:48 Apr 15, 2015
Jkt 235001
provided under its existing FERC Gas
Tariff and Certificates of Public
Convenience and Necessity; cancel its
FERC Gas Tariff, including all rate
schedules therein; and convert such
certificated facilities and operation
under NGA section 3, so that the
entirety of the company’s facilities and
operations are authorized solely under
NGA section 3.
The draft EIS assesses the potential
environmental effects of construction
and operation of the Lake Charles
Liquefaction Project in accordance with
the requirements of the National
Environmental Policy Act. The FERC
staff concludes that approval of the
proposed project would have some
adverse environmental impacts;
however, most of these impacts would
be reduced to less-than-significant
levels with the implementation of Lake
Charles LNG’s and Trunkline’s
proposed mitigation and the additional
measures recommended in the draft EIS.
The U.S. Army Corps of Engineers,
U.S. Coast Guard, U.S. Department of
Energy, U.S. Fish and Wildlife Service,
and U.S. Department of Transportation
participated as cooperating agencies in
the preparation of the draft EIS.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by a
proposal and participate in the National
Environmental Policy Act analysis.
Although the cooperating agencies
provided input on the conclusions and
recommendations presented in the draft
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
20489
Docket Nos. CP14–119–000.
CP14–120–000.
CP14–122–000.
EIS, the agencies will present their own
conclusions and recommendations in
their respective records of decision or
determinations for the project.
The draft EIS addresses the potential
environmental effects of the
construction, modification, and
operation of the following project
facilities:
• Three liquefaction trains, each with
a production capacity sufficient to
produce 5.48 million metric tons per
annum of LNG for export (each train
would contain metering and gas
treatment facilities, liquefaction and
refrigerant units, safety and control
systems, and associated infrastructure);
• modifications and upgrades at the
existing LNG terminal;
• about 0.5 mile of 48-inch-diameter
feed gas line to supply natural gas to the
liquefaction facility from existing gas
transmission pipelines;
• approximately 17.9 miles of 24- and
42-inch-diameter natural gas pipeline;
• a new 98,685 horsepower (hp)
compressor station;
• abandonment of a 3,000-hp
compressor unit, installation of a
15,002-hp unit, and piping
modifications at one existing
compressor station;
• modification of station piping at
three other existing compressor stations;
• five new meter stations and
modifications and upgrades of five
existing meter stations;
• modification of certain existing
pipeline facilities; and
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 80, Number 73 (Thursday, April 16, 2015)]
[Notices]
[Pages 20488-20489]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-08748]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC15-118-000.
Applicants: Rising Tree Wind Farm LLC, Rising Tree Wind Farm II
LLC.
Description: Application for Authorization for Disposition of
Jurisdictional Facilities and Request for Expedited Action of Rising
Tree Wind Farm LLC, et. al.
Filed Date: 4/10/15.
Accession Number: 20150410-5153.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: EC15-119-000.
Applicants: American Transmission Company LLC.
Description: Application for Authority to Acquire Transmission
Facilities of American Transmission Company LLC.
Filed Date: 4/10/15.
Accession Number: 20150410-5208.
Comments Due: 5 p.m. ET 5/1/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2570-017.
Applicants: Shady Hills Power Company, L.L.C.
Description: Amendment to December 16, 2014 Triennial Market Power
Analysis of Shady Hills Power Company, L.L.C.
Filed Date: 4/3/15.
Accession Number: 20150403-5071.
Comments Due: 5 p.m. ET 4/24/15.
Docket Numbers: ER14-2956-006.
Applicants: Hoopeston Wind, LLC.
Description: Notice of Non-Material Change in Status of Hoopeston
Wind, LLC.
Filed Date: 4/10/15.
Accession Number: 20150410-5121.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15-527-001.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing per 35: Errata to Compliance Filing
in Docket No. ER15-527-000 to be effective 2/2/2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5150.
Comments Due: 5 p.m. ET 5/1/15
.Docket Numbers: ER15-1487-000.
Applicants: PJM Interconnection, L.L.C., Virginia Electric and
Power Company.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii):
Dominion submits revisions to OATT Att H-16A re: prepayments to be
effective 1/1/2014.
Filed Date: 4/9/15.
Accession Number: 20150409-5180.
Comments Due: 5 p.m. ET 4/30/15.
Docket Numbers: ER15-1488-000.
Applicants: PJM Interconnection, L.L.C., PPL Electric Utilities
Corporation.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): PPL
submits revisions to OATT Attachment H-8G re PBOP expense to be
effective 6/1/2015.
Filed Date: 4/9/15.
Accession Number: 20150409-5196.
Comments Due: 5 p.m. ET 4/30/15.
Docket Numbers: ER15-1489-000.
Applicants: PacifiCorp.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): BPA
Construction Agreement (Summer Lake CB & SCADA) to be effective 6/9/
2015.
Filed Date: 4/9/15.
Accession Number: 20150409-5206.
Comments Due: 5 p.m. ET 4/30/15.
Docket Numbers: ER15-1490-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): 2015-
04-10_Attachment O Reconciliation Filing to be effective 6/1/2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5078.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15-1491-000.
Applicants: El Paso Electric Company.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii):
Concurrence of EPE to APS Service Agreement No. 193, Amendment 3 to be
effective 2/11/2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5137.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15-1492-000.
Applicants: El Paso Electric Company.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii):
Concurrence of EPE to APS Service Agreement Nos. 190,
[[Page 20489]]
192, 194, and 195 to be effective 3/11/2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5146.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15-1493-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): FAP
to be effective 6/12/2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5182.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15-1494-000.
Applicants: Convergent Energy and Power LLC.
Description: Initial rate filing per 35.12 Petition for Acceptance
of Initial Tariff, Waivers and Blanket Authority to be effective 6/15/
2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5197.
Comments Due: 5 p.m. ET 5/1/15.
Docket Numbers: ER15-1495-000.
Applicants: Alabama Power Company.
Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Clay
Solar LGIA Filing to be effective 3/27/2015.
Filed Date: 4/10/15.
Accession Number: 20150410-5253.
Comments Due: 5 p.m. ET 5/1/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-08748 Filed 4-15-15; 8:45 am]