Lock 11 Hydro Partners; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 18614-18615 [2015-07926]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
18614
Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1416–000.
Applicants: PJM Interconnection,
L.L.C., The Dayton Power and Light
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Dayton Power &
Light Company submits Service
Agreement No. 4105 to be effective
4/1/2015.
Filed Date: 3/31/15.
Accession Number: 20150331–5619.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1417–000.
Applicants: New England Power Pool
Participants Committee.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): April 2015
Membership Filing to be effective
3/1/2015.
Filed Date: 3/31/15.
Accession Number: 20150331–5620.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1418–000.
Applicants: Adelanto Solar II, LLC.
Description: Baseline eTariff Filing
per 35.1: Adelanto Solar II, LLC
Application for Market-Based Rates to
be effective 5/30/2015.
Filed Date: 3/31/15.
Accession Number: 20150331–5624.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1419–000.
Applicants: Emera Maine.
Description: Compliance filing per 35:
Order No. 676–H Compliance Filing and
Request for Waiver to be effective 5/15/
2015.
Filed Date: 3/31/15.
Accession Number: 20150331–5628.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1420–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): 2015–03–
31_Cancellation of Rate Schedule 35
ORCA to be effective 4/1/2015.
Filed Date: 3/31/15.
Accession Number: 20150331–5635.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1421–000.
Applicants: Central Hudson Gas &
Electric Corporation.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Revision to FERC
Rate Schedule 202 to be effective 3/6/
2015.
Filed Date: 3/31/15.
Accession Number: 20150331–5642.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1422–000.
Applicants: Central Hudson Gas &
Electric Corporation.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Interconnection
Agreement Between the Central Hudson
Gas to be effective 3/19/2015.
VerDate Sep<11>2014
17:46 Apr 06, 2015
Jkt 235001
Filed Date: 4/1/15.
Accession Number: 20150401–5011.
Comments Due: 5 p.m. ET 4/22/15.
Docket Numbers: ER15–1423–000.
Applicants: NorthWestern
Corporation.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): SA 666 Second
Revised—NITSA with Suiza Dairy
Group to be effective 7/1/2015.
Filed Date: 4/1/15.
Accession Number: 20150401–5224.
Comments Due: 5 p.m. ET 4/22/15.
Docket Numbers: ER15–1424–000.
Applicants: NorthWestern
Corporation.
Description: Tariff Withdrawal per
35.15: Notice of Cancellation of SA 20–
SD—EPC with enXco Development
Corporation to be effective 4/2/2015.
Filed Date: 4/1/15.
Accession Number: 20150401–5229.
Comments Due: 5 p.m. ET 4/22/15.
Docket Numbers: ER15–1425–000.
Applicants: Sierra Pacific Power
Company.
Description: Application of Sierra
Pacific Power Company to terminate
Firm Point-to-Point Transmission
Service Agreements with Mt. Wheeler
Power, Inc.
Filed Date: 3/31/15.
Accession Number: 20150331–5749.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1426–000.
Applicants: Public Service Company
of New Mexico.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Modification of Real
Power Loss Factor in OATT to be
effective 6/1/2015.
Filed Date: 4/1/15.
Accession Number: 20150401–5266.
Comments Due: 5 p.m. ET 4/22/15.
Docket Numbers: ER15–1427–000.
Applicants: Calpine New Jersey
Generation, LLC.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Revised Annual
Revenue Requirement to be effective 1/
28/2015.
Filed Date: 4/1/15.
Accession Number: 20150401–5386.
Comments Due: 5 p.m. ET 4/22/15.
Docket Numbers: ER15–1428–000.
Applicants: MATL LLP.
Description: Informational Filing to
implement Distribution Mechanism for
Operational Penalties of MATL LLP.
Filed Date: 3/31/15.
Accession Number: 20150331–5764.
Comments Due: 5 p.m. ET 4/21/15.
Docket Numbers: ER15–1429–000.
Applicants: Emera Maine.
Description: Compliance filing per 35:
Emera Maine Compliance Filing to be
effective 6/1/2015.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Filed Date: 4/1/15.
Accession Number: 20150401–5474.
Comments Due: 5 p.m. ET 4/22/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–07929 Filed 4–6–15; 8:45 am]
BILLING CODE CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14666–000]
Lock 11 Hydro Partners; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 4, 2015, Lock 11 Hydro
Partners filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Lock 11 Hydroelectric Station Project
(Lock 11 Project or project) to be located
at the Kentucky River Authority’s Lock
and Dam #11, on the Kentucky River,
near the town of College Hill, in Estill
and Madison Counties, Kentucky. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An existing 208-footlong, 35-foot-high concrete dam with a
52-foot-wide abandoned lock chamber;
E:\FR\FM\07APN1.SGM
07APN1
Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
(2) an existing 19.9-mile-long reservoir
having a storage capacity of 6,900-acrefeet; (3) 7 new axial flow turbinegenerators installed in the existing lock
chamber having a total capacity of 2,800
kilowatts; and (4) a new 1,000-foot-long,
12.47 kilo-Volt transmission line. The
project is estimated to generate an
average of 11,000 megawatt-hours
annually.
Applicant Contact: Mr. David Brown
Kinloch, Shaker Landing Hydro
Associates, 414 S. Wenzel Street,
Louisville, KY 40204; phone: (502) 589–
0975.
FERC Contact: Michael Spencer;
phone: (202) 502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14666–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14666) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 1, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–07926 Filed 4–6–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:46 Apr 06, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–14–001]
Texas Gas Transmission, LLC; Notice
of Filing
Take notice that on March 30, 2015,
Texas Gas Transmission, LLC (Texas
Gas) filed an amendment, pursuant to
section 7(c) of the Natural Gas Act and
Part 157 of the Commission’s
Regulations, for the Southern Indiana
Market Lateral Project extending from
Henderson County, Kentucky to Mount
Vernon, Posey County, Indiana. The
application of the Southern Indiana
Market Lateral Project was originally
filed on November 12, 2014 in Docket
No. CP15–14–000. The amended filing
may be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@gerc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to J. Kyle
Stephens, Vice President, Regulatory
Affairs & Rates, Texas Gas
Transmission, LLC, 9 Greenway Plaza,
Suite 2800, Houston, Texas 77046,
telephone (713) 479–8059, fax (866)
459–7336, and email: Kyle.Stephens@
bwpmlp.com.
Texas Gas states that one of two new
proposed industrial customers decided
to cancel its participation in the project.
To accommodate this change, Texas Gas
proposes (1) to construct and operate an
approximately 30.6-mile, 10-inchdiameter pipeline lateral with a capacity
of 53.5 MMcf/day, instead of the
originally proposed approximately 29.9
miles, 20-inch-diameter pipeline with a
capacity of 166 MMcf/day; and (2) to
remove the proposed construction of the
metering facilities designed to serve the
departing prospective customer. No new
landowners are affected by the amended
project. The cost of the amended project
is approximately $63 million instead of
$79.7 million as originally proposed.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
18615
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
5 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of any mailed environmental
documents, and will be notified of any
meetings associated with the
Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: 5:00 p.m. Eastern
Time on April 22, 2015.
E:\FR\FM\07APN1.SGM
07APN1
Agencies
[Federal Register Volume 80, Number 66 (Tuesday, April 7, 2015)]
[Notices]
[Pages 18614-18615]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07926]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14666-000]
Lock 11 Hydro Partners; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On March 4, 2015, Lock 11 Hydro Partners filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Lock 11 Hydroelectric
Station Project (Lock 11 Project or project) to be located at the
Kentucky River Authority's Lock and Dam #11, on the Kentucky River,
near the town of College Hill, in Estill and Madison Counties,
Kentucky. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) An
existing 208-foot-long, 35-foot-high concrete dam with a 52-foot-wide
abandoned lock chamber;
[[Page 18615]]
(2) an existing 19.9-mile-long reservoir having a storage capacity of
6,900-acre-feet; (3) 7 new axial flow turbine-generators installed in
the existing lock chamber having a total capacity of 2,800 kilowatts;
and (4) a new 1,000-foot-long, 12.47 kilo-Volt transmission line. The
project is estimated to generate an average of 11,000 megawatt-hours
annually.
Applicant Contact: Mr. David Brown Kinloch, Shaker Landing Hydro
Associates, 414 S. Wenzel Street, Louisville, KY 40204; phone: (502)
589-0975.
FERC Contact: Michael Spencer; phone: (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14666-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14666) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 1, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-07926 Filed 4-6-15; 8:45 am]
BILLING CODE 6717-01-P