Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 18655-18661 [2015-07715]

Download as PDF Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices Nominations are due on or before June 8, 2015. DATES: Submit an electronic copy of resume or curriculum vitae to Ms. Sophie Holiday, Sophie.Holiday@nrc.gov. Please ensure that the resume or curriculum vitae includes the following information, if applicable: Education; certification; professional association membership and committee membership activities; duties and responsibilities in current and previous clinical, research, and/or academic position(s). FOR FURTHER INFORMATION CONTACT: Ms. Sophie Holiday, U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards; telephone (404) 997–4691; email: Sophie.Holiday@nrc.gov. SUPPLEMENTARY INFORMATION: The ACMUI Nuclear Pharmacist provides advice on issues associated with the regulation of nuclear pharmacy applications of byproduct material. This advice includes providing input on NRC proposed rules and guidance, providing recommendations on the training and experience requirements for Authorized Nuclear Pharmacists, identifying medical events associated with these uses, evaluating non-routine uses of byproduct material, bringing key issues in the nuclear pharmacy community to the attention of NRC staff, as they relate to radiopharmaceuticals, radiation safety and NRC medical-use policy. ACMUI members are selected based on their educational background, certification(s), work experience, involvement and/or leadership in professional society activities, and other information obtained in letters or during the selection process. ACMUI members possess the medical and technical skills needed to address evolving issues. The current membership is comprised of the following professionals: (a) Nuclear medicine physician; (b) nuclear cardiologist; (c) two radiation oncologists; (d) diagnostic radiologist; (e) therapy medical physicist; (f) nuclear medicine physicist; (g) nuclear pharmacist; (h) health care administrator; (i) radiation safety officer; (j) patients’ rights advocate; (k) Food and Drug Administration representative; and (l) Agreement State representative. NRC is inviting nominations for the Nuclear Pharmacist to the ACMUI. The term of the individual currently occupying this position will end March 29, 2016. Committee members currently serve a four-year term and may be considered for reappointment to an additional term. mstockstill on DSK4VPTVN1PROD with NOTICES NOMINATION PROCESS: VerDate Sep<11>2014 17:46 Apr 06, 2015 Jkt 235001 Nominees must be U.S. citizens and be able to devote approximately 160 hours per year to Committee business. Members who are not Federal employees are compensated for their service. In addition, members are reimbursed for travel (including perdiem in lieu of subsistence) and are reimbursed secretarial and correspondence expenses. Full-time Federal employees are reimbursed travel expenses only. Security Background Check: The selected nominee will undergo a thorough security background check. Security paperwork may take the nominee several weeks to complete. Nominees will also be required to complete a financial disclosure statement to avoid conflicts of interest. Dated at Rockville, Maryland, this 1st day of April, 2015. For the U.S. Nuclear Regulatory Commission. Andrew L. Bates, Advisory Committee Management Officer. [FR Doc. 2015–07993 Filed 4–6–15; 8:45 am] BILLING CODE CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on the Medical Uses of Isotopes: Meeting Notice U.S. Nuclear Regulatory Commission. ACTION: Notice of meeting. AGENCY: The U.S. Nuclear Regulatory Commission will convene a teleconference meeting of the Advisory Committee on the Medical Uses of Isotopes (ACMUI) on June 16, 2015, to discuss the ACMUI Radioactive Seed Localization subcommittee report and to hear a presentation from Spectrum Pharmaceuticals regarding the training and experience requirements for alpha and beta emitters. Meeting information, including a copy of the agenda and handouts, will be available at https:// www.nrc.gov/reading-rm/doccollections/acmui/meetings/2015.html. The agenda and handouts may also be obtained by contacting Ms. Sophie Holiday using the information below. DATES: The teleconference meeting will be held on Tuesday, June 16, 2015, 2:00 p.m. to 5:00 p.m. Eastern Standard Time. Public Participation: Any member of the public who wishes to participate in the teleconference should contact Ms. Holiday using the contact information below. FOR FURTHER INFORMATION CONTACT: Ms. Sophie Holiday, U.S. Nuclear SUMMARY: PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 18655 Regulatory Commission, Office of Nuclear Material Safety and Safeguards; telephone: (404) 997–4691, email: sophie.holiday@nrc.gov. Conduct of the Meeting Dr. Bruce Thomadsen, ACMUI Chairman, will preside over the meeting. Dr. Thomadsen will conduct the meeting in a manner that will facilitate the orderly conduct of business. The following procedures apply to public participation in the meeting: 1. Persons who wish to provide a written statement should submit an electronic copy to Ms. Holiday at the contact information listed above. All submittals must be received by June 11, 2015, three business days prior to the meeting, and must pertain to the topic on the agenda for the meeting. 2. Questions and comments from members of the public will be permitted during the meetings, at the discretion of the Chairman. 3. The draft transcript and meeting summary will be available on ACMUI’s Web site https://www.nrc.gov/readingrm/doc-collections/acmui/meetings/ 2015.html on or about July 29, 2015. This meeting will be held in accordance with the Atomic Energy Act of 1954, as amended (primarily Section 161a); the Federal Advisory Committee Act (5 U.S.C. App); and the Commission’s regulations in Title 10 of the Code of Federal Regulations Part 7. Dated at Rockville, Maryland, this 1st day of April, 2015. For the U.S. Nuclear Regulatory Commission. Andrew L. Bates, Advisory Committee Management Officer. [FR Doc. 2015–07990 Filed 4–6–15; 8:45 am] BILLING CODE CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2015–0058] Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information Nuclear Regulatory Commission. ACTION: License amendment request; opportunity to comment, request a AGENCY: E:\FR\FM\07APN1.SGM 07APN1 18656 Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices hearing, and petition for leave to intervene; order. The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of three amendment requests. The amendment requests are for Perry Nuclear Power Plant, Unit 1; Diablo Canyon Nuclear Power Plant, Units 1 and 2; and San Onofre Nuclear Generating Station, Units 2 and 3. The NRC proposes to determine that each amendment request involves no significant hazards consideration. In addition, each amendment request contains sensitive unclassified non-safeguards information (SUNSI). DATES: Comments must be filed by May 7, 2015. A request for a hearing must be filed by June 8, 2015. Any potential party as defined in § 2.4 of Title 10 of the Code of Federal Regulations (10 CFR), who believes access to SUNSI is necessary to respond to this notice must request document access by April 17, 2015. ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject): • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2015–0058. Address questions about NRC dockets to Carol Gallagher; telephone: 301–415–3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: Cindy Bladey, Office of Administration, Mail Stop: OWFN–12–H08, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: Paula Blechman, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555–0001; telephone: 301–415–2242, email: Paula.Blechman@nrc.gov. SUPPLEMENTARY INFORMATION: mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2015– 0058 when contacting the NRC about the availability of information for this action. You may obtain publicly- VerDate Sep<11>2014 17:46 Apr 06, 2015 Jkt 235001 available information related to this action by any of the following methods: • Federal rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2015–0058. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in the SUPPLEMENTARY INFORMATION section. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. B. Submitting Comments Please include Docket ID NRC–2015– 0058, facility name, unit number(s), application date, and subject in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC posts all comment submissions at https:// www.regulations.gov as well as entering the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Background Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the NRC is publishing this notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued and grants the Commission the PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This notice includes notices of amendments containing SUNSI. III. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Combined Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The Commission has made a proposed determination that the following amendment requests involve no significant hazards consideration. Under the Commission’s regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is shown below. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that E:\FR\FM\07APN1.SGM 07APN1 Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES the need to take this action will occur very infrequently. A. Opportunity To Request a Hearing and Petition for Leave To Intervene Within 60 days after the date of publication of this notice, any person(s) whose interest may be affected by this action may file a request for a hearing and a petition to intervene with respect to issuance of the amendment to the subject facility operating license or combined license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission’s ‘‘Agency Rules of Practice and Procedure’’ in 10 CFR part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the NRC’s PDR, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first Floor), Rockville, Maryland 20852. The NRC’s regulations are accessible electronically from the NRC Library on the NRC’s Web site at https://www.nrc. gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) The name, address, and telephone number of the requestor or petitioner; (2) the nature of the requestor’s/petitioner’s right under the Act to be made a party to the proceeding; (3) the nature and extent of the requestor’s/petitioner’s property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requestor’s/petitioner’s interest. The petition must also set forth the specific contentions which the requestor/ petitioner seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases VerDate Sep<11>2014 17:46 Apr 06, 2015 Jkt 235001 for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the requestor/ petitioner to relief. A requestor/ petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of any amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2. B. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 18657 accordance with the NRC’s E-Filing rule (72 FR 49139; August 28, 2007). The EFiling process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at hearing.docket@nrc.gov, or by telephone at 301–415–1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRCissued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC’s public Web site at https://www. nrc.gov/site-help/e-submittals/gettingstarted.html. System requirements for accessing the E-Submittal server are detailed in the NRC’s ‘‘Guidance for Electronic Submission,’’ which is available on the agency’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC’s E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software. If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC’s online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC’s Web site. Further information on the Webbased submission form, including the installation of the Web browser plug-in, is available on the NRC’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. E:\FR\FM\07APN1.SGM 07APN1 mstockstill on DSK4VPTVN1PROD with NOTICES 18658 Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the documents are submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an email notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC’s Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/ petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the NRC’s adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the ‘‘Contact Us’’ link located on the NRC’s public Web site at https://www. nrc.gov/site-help/e-submittals.html, by email to MSHD.Resource@nrc.gov, or by a toll-free call at 1–866–672–7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants VerDate Sep<11>2014 18:58 Apr 06, 2015 Jkt 235001 filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in the NRC’s electronic hearing docket which is available to the public at https://ehd1. nrc.gov/ehd/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. However, a request to intervene will require including information on local residence in order to demonstrate a proximity assertion of interest in the proceeding. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. Petitions for leave to intervene must be filed no later than 60 days from the date of publication of this notice. Requests for hearing, petitions for leave to intervene, and motions for leave to file new or amended contentions that are filed after the 60-day deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i)–(iii). For further details with respect to this amendment action, see the application for amendment which is available for public inspection at the NRC’s PDR, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (First Floor), Rockville, Maryland 20852. Publicly available documents created or received at the NRC are accessible electronically through ADAMS in the NRC Library at https://www.nrc.gov/ reading-rm/adams.html. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the PDR’s Reference staff at 1–800–397–4209, 301– PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 415–4737, or by email to pdr.resource@ nrc.gov. FirstEnergy Nuclear Operating Company, Docket No. 50–440, Perry Nuclear Power Plant (PNPP), Unit 1, Perry, Ohio Date of amendment request: January 9, 2015. A publicly-available version is in ADAMS under Accession No. ML15009A265. Description of amendment request: This amendment request contains sensitive unclassified non-safeguards information (SUNSI). The proposed amendment requests revision of the operating license to extend the completion date for full implementation of the PNPP Cyber Security Plan from the beginning of July 2015 to the end of December 2017. Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed amendment extends the completion date for milestone 8 of the Cyber Security Plan (CSP) implementation schedule. Revising the full implementation date for the CSP does not involve modifications to any safety-related structures, systems, or components (SSCs). The implementation schedule provides a timeline for fully implementing the CSP. The CSP describes how the requirements of 10 CFR 73.54 are to be implemented to identify, evaluate, and mitigate cyber attacks up to and including the design basis cyber attack threat; thereby achieving high assurance that the facility’s digital computer and communications systems and networks are protected from cyber attacks. The revision of the CSP Implementation Schedule will not alter previously evaluated design basis accident analysis assumptions, add any accident initiators, modify the function of the plant safety-related SSCs, or affect how any plant safety-related SSCs are operated, maintained, tested, or inspected. As the proposed change does not directly impact SSCs, and milestones 1 through 7 provide significant protection against cyber attacks, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed change does not introduce a new mode of plant operation or involve a physical modification to the plant. New equipment is not installed with the proposed E:\FR\FM\07APN1.SGM 07APN1 Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices amendment, nor does the proposed amendment cause existing equipment to be operated in a new or different manner. The change to cyber security implementation plan milestone 8 is administrative in nature and relies on the significant protection against cyber attacks that has been gained through the implementation of CSP milestones 1 through 7. Since the proposed amendment does not involve a change to the plant design or operation, no new system interactions are created by this change. The proposed changes do not result in any new failure modes, and thus cannot initiate an accident different from those previously evaluated. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. The proposed amendment does not affect the performance of any structures, systems or components as described in the design basis analyses. The change to milestone 8 of the cyber security implementation plan is administrative in nature. The proposed change does not introduce a new mode of plant operation or involve a physical modification to the plant. The proposed amendment does not introduce changes to limits established in the accident analysis. Since there is no impact to any SSCs, or any maintenance or operational practice, there is also no reduction in any margin of safety. As the proposed change does not directly impact SSCs, and milestones 1 through 7 provide significant protection against cyber attacks, the proposed change does not involve a significant reduction in a margin of safety. mstockstill on DSK4VPTVN1PROD with NOTICES The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. Attorney for licensee: David W. Jenkins, Attorney, FirstEnergy Corporation, Mail Stop A–GO–15, 76 South Main Street, Akron, Ohio 44308. NRC Branch Chief: Travis L. Tate. Pacific Gas and Electric Company, Docket Nos. 50–275 and 50–323, Diablo Canyon Nuclear Power Plant (DCPP), Units 1 and 2, San Luis Obispo County, California Date of amendment request: October 17, 2014, as supplemented by letter dated February 19, 2015. Publiclyavailable versions are in ADAMS under Accession Nos. ML14290A603 and ML15050A437, respectively. Description of amendment request: This amendment request contains sensitive unclassified non-safeguards information (SUNSI). The proposed VerDate Sep<11>2014 18:58 Apr 06, 2015 Jkt 235001 amendment would revise the DCPP Cyber Security Plan (CSP) Milestone h full implementation schedule as set forth in the CSP implementation schedule. Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed change to the DCPP CSP Implementation Schedule is administrative in nature. This change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components (SSCs) relied upon to mitigate the consequences of a postulated accident, and has no impact on the probability or consequences of an accident previously evaluated. Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed change create the possibility of a new or different accident from any accident previously evaluated? Response: No. The proposed change to the DCPP CSP Implementation Schedule is administrative in nature. This change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the SSCs relied upon to mitigate the consequences of a postulated accident, and does not create the possibility of a new or different kind of accident from any accident previously evaluated. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated. 3. Does the proposed change involve a significant reduction in a margin of safety? Response: No. The margin of safety is associated with the confidence in the ability of the fission product barriers (i.e., fuel cladding, reactor coolant pressure boundary, and containment structure) to limit the level of radiation to the public. The proposed amendment does not alter the way any safety-related SSC functions and does not alter the way the plant is operated. The CSP provides assurance that safety-related SSCs are protected from cyber-attacks. The proposed amendment does not introduce any new PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 18659 uncertainties or change any existing uncertainties associated with any safety limit. The proposed amendment has no effect on the structural integrity of the fuel cladding, reactor coolant pressure boundary, or containment structure. Based on the above considerations, the proposed amendment does not degrade the confidence in the ability of the fission product barriers to limit the level of radiation to the public. Therefore, the proposed change does not involve a reduction in a margin of safety. The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. Attorney for licensee: Jennifer Post, Esq., Pacific Gas and Electric Company, P.O. Box 7442, San Francisco, California 94120. Acting NRC Branch Chief: Eric R. Oesterle. Southern California Edison Company, et al., Docket Nos. 50–361 and 50–362, San Onofre Nuclear Generating Station, Units 2 and 3, San Diego County, California Date of amendment request: November 12, 2014. A publiclyavailable version is in ADAMS under Accession No. ML14321A015. Description of amendment request: This amendment request contains sensitive unclassified non-safeguards information (SUNSI). The proposed amendments would revise the Cyber Security Plan Implementation Schedule Milestone No. 8 completion date and the physical protection license condition. Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed change to the San Onofre Nuclear Generating Station (SONGS) Cyber Security Plan Implementation Schedule is administrative in nature. This change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components (SSCs) relied upon to mitigate the consequences of postulated accidents, and has no impact on the E:\FR\FM\07APN1.SGM 07APN1 18660 Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices probability or consequences of an accident previously evaluated. Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed change to the SONGS Cyber Security Plan Implementation Schedule is administrative in nature. This proposed change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the SSCs relied upon to mitigate the consequences of postulated accidents, and does not create the possibility of a new or different kind of accident from any accident previously evaluated. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated. 3. Does the proposed change involve a significant reduction in a margin of safety? Response: No. Plant safety margins are established through limiting conditions for operation limiting safety system settings, and safety limits specified in the technical specifications. The proposed change to the SONGS Cyber Security Plan Implementation Schedule is administrative in nature. Since the proposed change is administrative in nature, there is no change to these established safety margins. Therefore the proposed change does not involve a significant reduction in a margin of safety. 1 While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC’s ‘‘E-Filing Rule,’’ the initial request to access SUNSI under these procedures should be submitted as described in this paragraph. mstockstill on DSK4VPTVN1PROD with NOTICES The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. Attorney for licensee: Walker A. Matthews, Esquire, Southern California Edison Company, 2244 Walnut Grove Avenue, Rosemead, California 91770. NRC Branch Chief: Meena K. Khanna. VerDate Sep<11>2014 17:46 Apr 06, 2015 Jkt 235001 A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing SUNSI. B. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party who believes access to SUNSI is necessary to respond to this notice may request such access. A ‘‘potential party’’ is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI submitted later than 10 days after publication of this notice will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier. C. The requester shall submit a letter requesting permission to access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, Washington, DC 20555–0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email address for the Office of the Secretary and the Office of the General Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, respectively.1 The request must include the following information: (1) A description of the licensing action with a citation to this Federal Register notice; (2) The name and address of the potential party and a description of the potential party’s particularized interest that could be harmed by the action identified in C.(1); and (3) The identity of the individual or entity requesting access to SUNSI and the requester’s basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly-available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention. D. Based on an evaluation of the information submitted under paragraph C.(3) the NRC staff will determine within 10 days of receipt of the request whether: (1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and (2) The requestor has established a legitimate need for access to SUNSI. E. If the NRC staff determines that the requestor satisfies both D.(1) and D.(2) above, the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order 2 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI. F. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI must be filed by the requestor no later than 25 days after the requestor is granted access to that information. However, if more than 25 days remain between the date the petitioner is granted access to the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. This provision does not extend the time for 2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request. Order Imposing Procedures for Access to Sensitive Unclassified NonSafeguards Information for Contention Preparation FirstEnergy Nuclear Operating Company, Docket No. 50–440, Perry Nuclear Power Plant, Unit 1, Perry, Ohio Pacific Gas and Electric Company, Docket Nos. 50–275 and 50–323, Diablo Canyon Nuclear Power Plant, Units 1 and 2, San Luis Obispo County, California Southern California Edison Company, et al., Docket Nos. 50–361 and 50–362, San Onofre Nuclear Generating Station, Units 2 and 3, San Diego County, California PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1 Federal Register / Vol. 80, No. 66 / Tuesday, April 7, 2015 / Notices filing a request for a hearing and petition to intervene, which must comply with the requirements of 10 CFR 2.309. G. Review of Denials of Access. (1) If the request for access to SUNSI is denied by the NRC staff after a determination on standing and need for access, the NRC staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial. (2) The requester may challenge the NRC staff’s adverse determination by filing a challenge within 5 days of receipt of that determination with: (a) The presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an administrative law judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) officer if that officer has been designated to rule on information access issues. H. Review of Grants of Access. A party other than the requester may challenge an NRC staff determination granting access to SUNSI whose release would harm that party’s interest independent of the proceeding. Such a challenge must be filed with the Chief Administrative Judge within 5 days of the notification by the NRC staff of its grant of access. If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311.3 I. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will 18661 consider and resolve requests for access to SUNSI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR part 2. Attachment 1 to this Order summarizes the general target schedule for processing and resolving requests under these procedures. It Is So Ordered. Dated at Rockville, Maryland, this 27th day of March, 2015. For the Nuclear Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. Attachment 1—General Target Schedule for Processing and Resolving Requests for Access to Sensitive Unclassified Non-Safeguards Information in This Proceeding Day Event/activity 0 ....................... Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests. Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information: supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding. Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply). U.S. Nuclear Regulatory Commission (NRC) staff informs the requester of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requester to file a motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access. Deadline for NRC staff reply to motions to reverse NRC staff determination(s). (Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for SUNSI. If access granted: issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff. Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order. Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. (Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI. (Answer receipt +7) Petitioner/Intervenor reply to answers. Decision on contention admission. 10 ..................... 60 ..................... 20 ..................... 25 ..................... 30 ..................... 40 ..................... A ....................... A + 3 ................. A + 28 ............... A + 53 ............... A + 60 ............... >A + 60 ............ [FR Doc. 2015–07715 Filed 4–6–15; 8:45 am] mstockstill on DSK4VPTVN1PROD with NOTICES BILLING CODE CODE 7590–01–P 3 Requesters should note that the filing requirements of the NRC’s E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals of NRC VerDate Sep<11>2014 17:46 Apr 06, 2015 Jkt 235001 staff determinations (because they must be served on a presiding officer or the Commission, as PO 00000 Frm 00076 Fmt 4703 Sfmt 9990 applicable), but not to the initial SUNSI request submitted to the NRC staff under these procedures. E:\FR\FM\07APN1.SGM 07APN1

Agencies

[Federal Register Volume 80, Number 66 (Tuesday, April 7, 2015)]
[Notices]
[Pages 18655-18661]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07715]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0058]


Applications and Amendments to Facility Operating Licenses and 
Combined Licenses Involving Proposed No Significant Hazards 
Considerations and Containing Sensitive Unclassified Non-Safeguards 
Information and Order Imposing Procedures for Access to Sensitive 
Unclassified Non-Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment request; opportunity to comment, request a

[[Page 18656]]

hearing, and petition for leave to intervene; order.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is 
considering approval of three amendment requests. The amendment 
requests are for Perry Nuclear Power Plant, Unit 1; Diablo Canyon 
Nuclear Power Plant, Units 1 and 2; and San Onofre Nuclear Generating 
Station, Units 2 and 3. The NRC proposes to determine that each 
amendment request involves no significant hazards consideration. In 
addition, each amendment request contains sensitive unclassified non-
safeguards information (SUNSI).

DATES: Comments must be filed by May 7, 2015. A request for a hearing 
must be filed by June 8, 2015. Any potential party as defined in Sec.  
2.4 of Title 10 of the Code of Federal Regulations (10 CFR), who 
believes access to SUNSI is necessary to respond to this notice must 
request document access by April 17, 2015.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specific subject):
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0058. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Paula Blechman, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 
20555-0001; telephone: 301-415-2242, email: Paula.Blechman@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2015-0058 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0058.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in the 
SUPPLEMENTARY INFORMATION section.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2015-0058, facility name, unit 
number(s), application date, and subject in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Background

    Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the NRC is publishing this notice. The Act requires 
the Commission to publish notice of any amendments issued, or proposed 
to be issued and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration, 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person.
    This notice includes notices of amendments containing SUNSI.

III. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses, Proposed No Significant 
Hazards Consideration Determination, and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment requests involve no significant hazards consideration. Under 
the Commission's regulations in 10 CFR 50.92, this means that operation 
of the facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated, or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated, 
or (3) involve a significant reduction in a margin of safety. The basis 
for this proposed determination for each amendment request is shown 
below.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example, in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish a notice of issuance in 
the Federal Register. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that

[[Page 18657]]

the need to take this action will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person(s) whose interest may be affected by this action may file a 
request for a hearing and a petition to intervene with respect to 
issuance of the amendment to the subject facility operating license or 
combined license. Requests for a hearing and a petition for leave to 
intervene shall be filed in accordance with the Commission's ``Agency 
Rules of Practice and Procedure'' in 10 CFR part 2. Interested 
person(s) should consult a current copy of 10 CFR 2.309, which is 
available at the NRC's PDR, located at One White Flint North, Room O1-
F21, 11555 Rockville Pike (First Floor), Rockville, Maryland 20852. The 
NRC's regulations are accessible electronically from the NRC Library on 
the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is 
filed within 60 days, the Commission or a presiding officer designated 
by the Commission or by the Chief Administrative Judge of the Atomic 
Safety and Licensing Board Panel, will rule on the request and/or 
petition; and the Secretary or the Chief Administrative Judge of the 
Atomic Safety and Licensing Board will issue a notice of a hearing or 
an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address, and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the requestor's/petitioner's interest. The petition must 
also set forth the specific contentions which the requestor/petitioner 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
requestor/petitioner shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing. 
The requestor/petitioner must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
requestor/petitioner intends to rely to establish those facts or expert 
opinion. The petition must include sufficient information to show that 
a genuine dispute exists with the applicant on a material issue of law 
or fact. Contentions shall be limited to matters within the scope of 
the amendment under consideration. The contention must be one which, if 
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to decide when the hearing is held. If the final determination is that 
the amendment request involves no significant hazards consideration, 
the Commission may issue the amendment and make it immediately 
effective, notwithstanding the request for a hearing. Any hearing held 
would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of any amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at hearing.docket@nrc.gov, or by 
telephone at 301-415-1677, to request (1) a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the agency's public Web 
site at https://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC's 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.

[[Page 18658]]

    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance 
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC's public 
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to 
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 
20852, Attention: Rulemaking and Adjudications Staff. Participants 
filing a document in this manner are responsible for serving the 
document on all other participants. Filing is considered complete by 
first-class mail as of the time of deposit in the mail, or by courier, 
express mail, or expedited delivery service upon depositing the 
document with the provider of the service. A presiding officer, having 
granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. 
However, a request to intervene will require including information on 
local residence in order to demonstrate a proximity assertion of 
interest in the proceeding. With respect to copyrighted works, except 
for limited excerpts that serve the purpose of the adjudicatory filings 
and would constitute a Fair Use application, participants are requested 
not to include copyrighted materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Requests for hearing, 
petitions for leave to intervene, and motions for leave to file new or 
amended contentions that are filed after the 60-day deadline will not 
be entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i)-(iii).
    For further details with respect to this amendment action, see the 
application for amendment which is available for public inspection at 
the NRC's PDR, located at One White Flint North, Room O1-F21, 11555 
Rockville Pike (First Floor), Rockville, Maryland 20852. Publicly 
available documents created or received at the NRC are accessible 
electronically through ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there 
are problems in accessing the documents located in ADAMS, contact the 
PDR's Reference staff at 1-800-397-4209, 301-415-4737, or by email to 
pdr.resource@nrc.gov.
FirstEnergy Nuclear Operating Company, Docket No. 50-440, Perry Nuclear 
Power Plant (PNPP), Unit 1, Perry, Ohio
    Date of amendment request: January 9, 2015. A publicly-available 
version is in ADAMS under Accession No. ML15009A265.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The proposed 
amendment requests revision of the operating license to extend the 
completion date for full implementation of the PNPP Cyber Security Plan 
from the beginning of July 2015 to the end of December 2017.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed amendment extends the completion date for milestone 
8 of the Cyber Security Plan (CSP) implementation schedule. Revising 
the full implementation date for the CSP does not involve 
modifications to any safety-related structures, systems, or 
components (SSCs). The implementation schedule provides a timeline 
for fully implementing the CSP. The CSP describes how the 
requirements of 10 CFR 73.54 are to be implemented to identify, 
evaluate, and mitigate cyber attacks up to and including the design 
basis cyber attack threat; thereby achieving high assurance that the 
facility's digital computer and communications systems and networks 
are protected from cyber attacks. The revision of the CSP 
Implementation Schedule will not alter previously evaluated design 
basis accident analysis assumptions, add any accident initiators, 
modify the function of the plant safety-related SSCs, or affect how 
any plant safety-related SSCs are operated, maintained, tested, or 
inspected.
    As the proposed change does not directly impact SSCs, and 
milestones 1 through 7 provide significant protection against cyber 
attacks, the proposed change does not involve a significant increase 
in the probability or consequences of an accident previously 
evaluated.
    2. Does the proposed amendment create the possibility of a new 
or different kind of accident from any accident previously 
evaluated?
    Response: No.
    The proposed change does not introduce a new mode of plant 
operation or involve a physical modification to the plant. New 
equipment is not installed with the proposed

[[Page 18659]]

amendment, nor does the proposed amendment cause existing equipment 
to be operated in a new or different manner. The change to cyber 
security implementation plan milestone 8 is administrative in nature 
and relies on the significant protection against cyber attacks that 
has been gained through the implementation of CSP milestones 1 
through 7. Since the proposed amendment does not involve a change to 
the plant design or operation, no new system interactions are 
created by this change. The proposed changes do not result in any 
new failure modes, and thus cannot initiate an accident different 
from those previously evaluated.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any previously 
evaluated.
    3. Does the proposed amendment involve a significant reduction 
in a margin of safety?
    Response: No.
    The proposed amendment does not affect the performance of any 
structures, systems or components as described in the design basis 
analyses. The change to milestone 8 of the cyber security 
implementation plan is administrative in nature.
    The proposed change does not introduce a new mode of plant 
operation or involve a physical modification to the plant. The 
proposed amendment does not introduce changes to limits established 
in the accident analysis. Since there is no impact to any SSCs, or 
any maintenance or operational practice, there is also no reduction 
in any margin of safety.
    As the proposed change does not directly impact SSCs, and 
milestones 1 through 7 provide significant protection against cyber 
attacks, the proposed change does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    Attorney for licensee: David W. Jenkins, Attorney, FirstEnergy 
Corporation, Mail Stop A-GO-15, 76 South Main Street, Akron, Ohio 
44308.
    NRC Branch Chief: Travis L. Tate.
Pacific Gas and Electric Company, Docket Nos. 50-275 and 50-323, Diablo 
Canyon Nuclear Power Plant (DCPP), Units 1 and 2, San Luis Obispo 
County, California
    Date of amendment request: October 17, 2014, as supplemented by 
letter dated February 19, 2015. Publicly-available versions are in 
ADAMS under Accession Nos. ML14290A603 and ML15050A437, respectively.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The proposed 
amendment would revise the DCPP Cyber Security Plan (CSP) Milestone h 
full implementation schedule as set forth in the CSP implementation 
schedule.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed change to the DCPP CSP Implementation Schedule is 
administrative in nature. This change does not alter accident 
analysis assumptions, add any initiators, or affect the function of 
plant systems or the manner in which systems are operated, 
maintained, modified, tested, or inspected. The proposed change does 
not require any plant modifications which affect the performance 
capability of the structures, systems, and components (SSCs) relied 
upon to mitigate the consequences of a postulated accident, and has 
no impact on the probability or consequences of an accident 
previously evaluated.
    Therefore, the proposed changes do not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different accident from any accident previously evaluated?
    Response: No.
    The proposed change to the DCPP CSP Implementation Schedule is 
administrative in nature. This change does not alter accident 
analysis assumptions, add any initiators, or affect the function of 
plant systems or the manner in which systems are operated, 
maintained, modified, tested, or inspected. The proposed change does 
not require any plant modifications which affect the performance 
capability of the SSCs relied upon to mitigate the consequences of a 
postulated accident, and does not create the possibility of a new or 
different kind of accident from any accident previously evaluated.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any previously 
evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    The margin of safety is associated with the confidence in the 
ability of the fission product barriers (i.e., fuel cladding, 
reactor coolant pressure boundary, and containment structure) to 
limit the level of radiation to the public. The proposed amendment 
does not alter the way any safety-related SSC functions and does not 
alter the way the plant is operated. The CSP provides assurance that 
safety-related SSCs are protected from cyber-attacks. The proposed 
amendment does not introduce any new uncertainties or change any 
existing uncertainties associated with any safety limit. The 
proposed amendment has no effect on the structural integrity of the 
fuel cladding, reactor coolant pressure boundary, or containment 
structure. Based on the above considerations, the proposed amendment 
does not degrade the confidence in the ability of the fission 
product barriers to limit the level of radiation to the public.
    Therefore, the proposed change does not involve a reduction in a 
margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    Attorney for licensee: Jennifer Post, Esq., Pacific Gas and 
Electric Company, P.O. Box 7442, San Francisco, California 94120.
    Acting NRC Branch Chief: Eric R. Oesterle.
Southern California Edison Company, et al., Docket Nos. 50-361 and 50-
362, San Onofre Nuclear Generating Station, Units 2 and 3, San Diego 
County, California
    Date of amendment request: November 12, 2014. A publicly-available 
version is in ADAMS under Accession No. ML14321A015.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The proposed 
amendments would revise the Cyber Security Plan Implementation Schedule 
Milestone No. 8 completion date and the physical protection license 
condition.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed change to the San Onofre Nuclear Generating Station 
(SONGS) Cyber Security Plan Implementation Schedule is 
administrative in nature. This change does not alter accident 
analysis assumptions, add any initiators, or affect the function of 
plant systems or the manner in which systems are operated, 
maintained, modified, tested, or inspected. The proposed change does 
not require any plant modifications which affect the performance 
capability of the structures, systems, and components (SSCs) relied 
upon to mitigate the consequences of postulated accidents, and has 
no impact on the

[[Page 18660]]

probability or consequences of an accident previously evaluated.
    Therefore, the proposed changes do not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed change to the SONGS Cyber Security Plan 
Implementation Schedule is administrative in nature. This proposed 
change does not alter accident analysis assumptions, add any 
initiators, or affect the function of plant systems or the manner in 
which systems are operated, maintained, modified, tested, or 
inspected. The proposed change does not require any plant 
modifications which affect the performance capability of the SSCs 
relied upon to mitigate the consequences of postulated accidents, 
and does not create the possibility of a new or different kind of 
accident from any accident previously evaluated.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any previously 
evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    Plant safety margins are established through limiting conditions 
for operation limiting safety system settings, and safety limits 
specified in the technical specifications. The proposed change to 
the SONGS Cyber Security Plan Implementation Schedule is 
administrative in nature. Since the proposed change is 
administrative in nature, there is no change to these established 
safety margins. Therefore the proposed change does not involve a 
significant reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    Attorney for licensee: Walker A. Matthews, Esquire, Southern 
California Edison Company, 2244 Walnut Grove Avenue, Rosemead, 
California 91770.
    NRC Branch Chief: Meena K. Khanna.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

FirstEnergy Nuclear Operating Company, Docket No. 50-440, Perry Nuclear 
Power Plant, Unit 1, Perry, Ohio

Pacific Gas and Electric Company, Docket Nos. 50-275 and 50-323, Diablo 
Canyon Nuclear Power Plant, Units 1 and 2, San Luis Obispo County, 
California

Southern California Edison Company, et al., Docket Nos. 50-361 and 50-
362, San Onofre Nuclear Generating Station, Units 2 and 3, San Diego 
County, California

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing SUNSI.
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication of this notice will not 
be considered absent a showing of good cause for the late filing, 
addressing why the request could not have been filed earlier.
    C. The requester shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email 
address for the Office of the Secretary and the Office of the General 
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requester's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline. 
This provision does not extend the time for

[[Page 18661]]

filing a request for a hearing and petition to intervene, which must 
comply with the requirements of 10 CFR 2.309.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and need for access, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requester may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) officer if that officer has been 
designated to rule on information access issues.
    H. Review of Grants of Access. A party other than the requester may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requesters should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.

It Is So Ordered.

    Dated at Rockville, Maryland, this 27th day of March, 2015.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

Attachment 1--General Target Schedule for Processing and Resolving 
Requests for Access to Sensitive Unclassified Non-Safeguards 
Information in This Proceeding

------------------------------------------------------------------------
                Day                            Event/activity
------------------------------------------------------------------------
0.................................  Publication of Federal Register
                                     notice of hearing and opportunity
                                     to petition for leave to intervene,
                                     including order with instructions
                                     for access requests.
10................................  Deadline for submitting requests for
                                     access to Sensitive Unclassified
                                     Non-Safeguards Information (SUNSI)
                                     with information: supporting the
                                     standing of a potential party
                                     identified by name and address;
                                     describing the need for the
                                     information in order for the
                                     potential party to participate
                                     meaningfully in an adjudicatory
                                     proceeding.
60................................  Deadline for submitting petition for
                                     intervention containing: (i)
                                     Demonstration of standing; and (ii)
                                     all contentions whose formulation
                                     does not require access to SUNSI
                                     (+25 Answers to petition for
                                     intervention; +7 petitioner/
                                     requestor reply).
20................................  U.S. Nuclear Regulatory Commission
                                     (NRC) staff informs the requester
                                     of the staff's determination
                                     whether the request for access
                                     provides a reasonable basis to
                                     believe standing can be established
                                     and shows need for SUNSI. (NRC
                                     staff also informs any party to the
                                     proceeding whose interest
                                     independent of the proceeding would
                                     be harmed by the release of the
                                     information.) If NRC staff makes
                                     the finding of need for SUNSI and
                                     likelihood of standing, NRC staff
                                     begins document processing
                                     (preparation of redactions or
                                     review of redacted documents).
25................................  If NRC staff finds no ``need'' or no
                                     likelihood of standing, the
                                     deadline for petitioner/requester
                                     to file a motion seeking a ruling
                                     to reverse the NRC staff's denial
                                     of access; NRC staff files copy of
                                     access determination with the
                                     presiding officer (or Chief
                                     Administrative Judge or other
                                     designated officer, as
                                     appropriate). If NRC staff finds
                                     ``need'' for SUNSI, the deadline
                                     for any party to the proceeding
                                     whose interest independent of the
                                     proceeding would be harmed by the
                                     release of the information to file
                                     a motion seeking a ruling to
                                     reverse the NRC staff's grant of
                                     access.
30................................  Deadline for NRC staff reply to
                                     motions to reverse NRC staff
                                     determination(s).
40................................  (Receipt +30) If NRC staff finds
                                     standing and need for SUNSI,
                                     deadline for NRC staff to complete
                                     information processing and file
                                     motion for Protective Order and
                                     draft Non-Disclosure Affidavit.
                                     Deadline for applicant/licensee to
                                     file Non-Disclosure Agreement for
                                     SUNSI.
A.................................  If access granted: issuance of
                                     presiding officer or other
                                     designated officer decision on
                                     motion for protective order for
                                     access to sensitive information
                                     (including schedule for providing
                                     access and submission of
                                     contentions) or decision reversing
                                     a final adverse determination by
                                     the NRC staff.
A + 3.............................  Deadline for filing executed Non-
                                     Disclosure Affidavits. Access
                                     provided to SUNSI consistent with
                                     decision issuing the protective
                                     order.
A + 28............................  Deadline for submission of
                                     contentions whose development
                                     depends upon access to SUNSI.
                                     However, if more than 25 days
                                     remain between the petitioner's
                                     receipt of (or access to) the
                                     information and the deadline for
                                     filing all other contentions (as
                                     established in the notice of
                                     hearing or opportunity for
                                     hearing), the petitioner may file
                                     its SUNSI contentions by that later
                                     deadline.
A + 53............................  (Contention receipt +25) Answers to
                                     contentions whose development
                                     depends upon access to SUNSI.
A + 60............................  (Answer receipt +7) Petitioner/
                                     Intervenor reply to answers.
>A + 60...........................  Decision on contention admission.
------------------------------------------------------------------------

[FR Doc. 2015-07715 Filed 4-6-15; 8:45 am]