Federal Register / Vol. 80, No. 65 / Monday, April 6, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14628–001]
tkelley on DSK4VPTVN1PROD with NOTICES
Minneapolis Leased Housing
Associates IV Limited Partnership;
Notice of Application Tendered for
Filing With the Commission
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor
License.
b. Project No.: 14628–001.
c. Date filed: March 20, 2015.
d. Applicant: Minneapolis Leased
Housing Associates IV, Limited
Partnership (Minneapolis Housing
Associates).
e. Name of Project: A-Mill Artist Lofts
Hydroelectric Project (A-Mill Project).
f. Location: On the Mississippi River,
in the City of Minneapolis, Hennepin
County, Minnesota. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Owen Metz,
2905 Northwest Blvd., Suite 150,
Plymouth, MN 55441; (763) 354–5618;
email ometz@dominiuminc.com.
i. FERC Contact: Shana Murray at
(202) 502–8333; or email at
shana.murray@ferc.gov.
j. The application is not ready for
environmental analysis at this time.
k. The A-Mill Project consists of: (1)
Removal of an existing concrete
bulkhead blocking the existing intake
structure; (2) an existing headrace
tunnel rehabilitated and sleeved with a
new 616-foot-long, 5-foot-diameter steel
penstock; (3) a new vertical steel pipe
installed in the existing downstream
drop-shaft; (4) a new 600-kilowatt
turbine generator; (5) a new 6-foot-wide
by 4-foot-tall concrete outlet structure at
the existing downstream tailrace; and
(6) appurtenant facilities. The average
annual generation is estimated to be
3,400 megawatt-hours.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
VerDate Sep<11>2014
18:14 Apr 03, 2015
Jkt 235001
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
m. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance: April
2015.
Issue notice soliciting final terms and
conditions: May 2015.
Commission issues EA: July 2015.
Dated: March 31, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–07797 Filed 4–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–116–000]
Southwest Gas Storage Company;
Notice of Request Under Blanket
Authorization
Take notice that on March 18, 2015,
Southwest Gas Storage Company
(Southwest), 1300 Main Street, Houston,
Texas 77002, filed in Docket No. CP15–
116–000 a prior notice request pursuant
to sections 157.205 and 157.216(b) of
the Commission’s regulations under the
Natural Gas Act (NGA), as amended,
requesting authorization to plug and
abandon 11 wells, associated lateral
pipelines, and appurtenances at its
Waverly Storage Field in Morgan
County, Illinois, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Specifically, Southwest proposes to
plug and abandon seven inactive
injection/withdrawal wells (Carr 2–9,
Staton 2–15, Mosley 2–16, Rogers 1–16,
Stenemeyer 2–15, Edwards 1–16, and
Wheeler 2–15). Southwest further
proposes to abandon the related laterals,
totaling 5,362 feet of 4-, 6-, and 8-inch
diameter pipeline, with appurtenances.
Additionally, Southwest proposes to
plug and abandon four observation
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
18391
wells (Dora Hubbs 1–33, Burnett 1–4,
B.J. Stenemeyer 1–22, and Wheeler 1–
22). Southwest states that the working
gas at the Waverly Storage Field has
been reduced, leaving a number of wells
too far from the gas bubble to provide
useful service. Also, Southwest asserts
that there have been integrity problems
in the lateral pipelines, well site
facilities, and wellheads due to
corrosion. Southwest states that it does
not anticipate storage field operation to
change to where the subject wells would
be needed for injection/withdrawal
service. Southwest avers that the
proposed abandonment project will
have no effect on the certificated
physical parameters of the Waverly
Storage Field, including total inventory,
reservoir pressure, reservoir and buffer
boundaries, and certificated capacity.
Southwest estimates the cost of the
proposed abandonment to be
approximately $853,000.
Any questions concerning this
application may be directed to Stephen
Veatch, Sr. Director of Certificates,
Southwest Gas Storage Company, 1300
Main Street, Houston, Texas 77002, by
telephone at (713) 989–2024, by
facsimile at (713) 989–1205, or by email
at stephen_veatch@energytransfer.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 80, Number 65 (Monday, April 6, 2015)]
[Notices]
[Page 18391]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07797]
[[Page 18391]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14628-001]
Minneapolis Leased Housing Associates IV Limited Partnership;
Notice of Application Tendered for Filing With the Commission
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Minor License.
b. Project No.: 14628-001.
c. Date filed: March 20, 2015.
d. Applicant: Minneapolis Leased Housing Associates IV, Limited
Partnership (Minneapolis Housing Associates).
e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-
Mill Project).
f. Location: On the Mississippi River, in the City of Minneapolis,
Hennepin County, Minnesota. No federal lands are occupied by the
project works or located within the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150,
Plymouth, MN 55441; (763) 354-5618; email ometz@dominiuminc.com.
i. FERC Contact: Shana Murray at (202) 502-8333; or email at
shana.murray@ferc.gov.
j. The application is not ready for environmental analysis at this
time.
k. The A-Mill Project consists of: (1) Removal of an existing
concrete bulkhead blocking the existing intake structure; (2) an
existing headrace tunnel rehabilitated and sleeved with a new 616-foot-
long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe
installed in the existing downstream drop-shaft; (4) a new 600-kilowatt
turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet
structure at the existing downstream tailrace; and (6) appurtenant
facilities. The average annual generation is estimated to be 3,400
megawatt-hours.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
m. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance: April 2015.
Issue notice soliciting final terms and conditions: May 2015.
Commission issues EA: July 2015.
Dated: March 31, 2015.
Kimberly D. Bose,
Secretary.