Minneapolis Leased Housing Associates IV Limited Partnership; Notice of Application Tendered for Filing With the Commission, 18391 [2015-07797]

Download as PDF Federal Register / Vol. 80, No. 65 / Monday, April 6, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14628–001] tkelley on DSK4VPTVN1PROD with NOTICES Minneapolis Leased Housing Associates IV Limited Partnership; Notice of Application Tendered for Filing With the Commission Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Minor License. b. Project No.: 14628–001. c. Date filed: March 20, 2015. d. Applicant: Minneapolis Leased Housing Associates IV, Limited Partnership (Minneapolis Housing Associates). e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-Mill Project). f. Location: On the Mississippi River, in the City of Minneapolis, Hennepin County, Minnesota. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150, Plymouth, MN 55441; (763) 354–5618; email ometz@dominiuminc.com. i. FERC Contact: Shana Murray at (202) 502–8333; or email at shana.murray@ferc.gov. j. The application is not ready for environmental analysis at this time. k. The A-Mill Project consists of: (1) Removal of an existing concrete bulkhead blocking the existing intake structure; (2) an existing headrace tunnel rehabilitated and sleeved with a new 616-foot-long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe installed in the existing downstream drop-shaft; (4) a new 600-kilowatt turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet structure at the existing downstream tailrace; and (6) appurtenant facilities. The average annual generation is estimated to be 3,400 megawatt-hours. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ VerDate Sep<11>2014 18:14 Apr 03, 2015 Jkt 235001 esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance: April 2015. Issue notice soliciting final terms and conditions: May 2015. Commission issues EA: July 2015. Dated: March 31, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–07797 Filed 4–3–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–116–000] Southwest Gas Storage Company; Notice of Request Under Blanket Authorization Take notice that on March 18, 2015, Southwest Gas Storage Company (Southwest), 1300 Main Street, Houston, Texas 77002, filed in Docket No. CP15– 116–000 a prior notice request pursuant to sections 157.205 and 157.216(b) of the Commission’s regulations under the Natural Gas Act (NGA), as amended, requesting authorization to plug and abandon 11 wells, associated lateral pipelines, and appurtenances at its Waverly Storage Field in Morgan County, Illinois, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Specifically, Southwest proposes to plug and abandon seven inactive injection/withdrawal wells (Carr 2–9, Staton 2–15, Mosley 2–16, Rogers 1–16, Stenemeyer 2–15, Edwards 1–16, and Wheeler 2–15). Southwest further proposes to abandon the related laterals, totaling 5,362 feet of 4-, 6-, and 8-inch diameter pipeline, with appurtenances. Additionally, Southwest proposes to plug and abandon four observation PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 18391 wells (Dora Hubbs 1–33, Burnett 1–4, B.J. Stenemeyer 1–22, and Wheeler 1– 22). Southwest states that the working gas at the Waverly Storage Field has been reduced, leaving a number of wells too far from the gas bubble to provide useful service. Also, Southwest asserts that there have been integrity problems in the lateral pipelines, well site facilities, and wellheads due to corrosion. Southwest states that it does not anticipate storage field operation to change to where the subject wells would be needed for injection/withdrawal service. Southwest avers that the proposed abandonment project will have no effect on the certificated physical parameters of the Waverly Storage Field, including total inventory, reservoir pressure, reservoir and buffer boundaries, and certificated capacity. Southwest estimates the cost of the proposed abandonment to be approximately $853,000. Any questions concerning this application may be directed to Stephen Veatch, Sr. Director of Certificates, Southwest Gas Storage Company, 1300 Main Street, Houston, Texas 77002, by telephone at (713) 989–2024, by facsimile at (713) 989–1205, or by email at stephen_veatch@energytransfer.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental E:\FR\FM\06APN1.SGM 06APN1

Agencies

[Federal Register Volume 80, Number 65 (Monday, April 6, 2015)]
[Notices]
[Page 18391]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07797]



[[Page 18391]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14628-001]


Minneapolis Leased Housing Associates IV Limited Partnership; 
Notice of Application Tendered for Filing With the Commission

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor License.
    b. Project No.: 14628-001.
    c. Date filed: March 20, 2015.
    d. Applicant: Minneapolis Leased Housing Associates IV, Limited 
Partnership (Minneapolis Housing Associates).
    e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-
Mill Project).
    f. Location: On the Mississippi River, in the City of Minneapolis, 
Hennepin County, Minnesota. No federal lands are occupied by the 
project works or located within the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150, 
Plymouth, MN 55441; (763) 354-5618; email ometz@dominiuminc.com.
    i. FERC Contact: Shana Murray at (202) 502-8333; or email at 
shana.murray@ferc.gov.
    j. The application is not ready for environmental analysis at this 
time.
    k. The A-Mill Project consists of: (1) Removal of an existing 
concrete bulkhead blocking the existing intake structure; (2) an 
existing headrace tunnel rehabilitated and sleeved with a new 616-foot-
long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe 
installed in the existing downstream drop-shaft; (4) a new 600-kilowatt 
turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet 
structure at the existing downstream tailrace; and (6) appurtenant 
facilities. The average annual generation is estimated to be 3,400 
megawatt-hours.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.
    Issue Notice of Acceptance: April 2015.
    Issue notice soliciting final terms and conditions: May 2015.
    Commission issues EA: July 2015.

    Dated: March 31, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-07797 Filed 4-3-15; 8:45 am]