Notice of Attendance at PJM Interconnection, LLC Meetings, 18397-18399 [2015-07761]
Download as PDF
Federal Register / Vol. 80, No. 65 / Monday, April 6, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2179–043—California; Project
No. 2467–020—California]
tkelley on DSK4VPTVN1PROD with NOTICES
Merced Irrigation District, Pacific Gas
and Electric Company; Notice of
Availability of the Draft Environmental
Impact Statement for the Merced River
and Merced Falls Hydroelectric
Projects
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations contained in the Code of
Federal Regulations (CFR) (18 CFR part
380 [FERC Order No. 486, 52 FR
47897]), the Office of Energy Projects
has reviewed the applications for
license for the Merced River
Hydroelectric Project (FERC No. 2179),
and the Merced Falls Hydroelectric
Project (FERC No. 2467) and prepared a
draft multi-project environmental
impact statement (EIS) for the projects.
Both projects are located on the
Merced River. The Merced River Project
is located at river mile (RM) 62.5 and
56.3, respectively, about 23 miles
northeast of the city of Merced in
Mariposa County, California. The
Merced River Project occupies 3,154.9
acres of federal land administered by
the U.S. Department of the Interior,
Bureau of Land Management (BLM).
The Merced Falls Project is located at
RM 55 on the border of Merced and
Mariposa Counties, California. The
Merced Falls Project occupies 1.0 acre
of federal land administered by BLM.
The draft EIS contains staff’s analysis
of the applicants’ proposals and the
alternatives for relicensing the Merced
River and Merced Falls projects. The
draft EIS documents the views of
governmental agencies, nongovernmental organizations, affected
Indian tribes, the public, the license
applicants, and Commission staff.
A copy of the draft EIS is available for
review at the Commission or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number,
excluding the last three digits, to access
the document. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
18:14 Apr 03, 2015
Jkt 235001
For assistance, contact FERC Online
Support.
All comments must be filed by Friday,
May 29, 2015, and should reference
Project Nos. 2179–043 and 2467–020.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s efiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426.
Anyone may intervene in this
proceeding based on this draft EIS (18
CFR 380.10). You must file your request
to intervene as specified above. You do
not need intervenor status to have your
comments considered.
Commission staff will hold two public
meetings for the purpose of receiving
comments on the draft EIS. The daytime
meeting will focus on resource agency,
Indian tribe, and non-governmental
organization comments, while the
evening meeting is primarily for
receiving input from the public. All
interested individuals and entities will
be invited to attend the public meeting.
A notice detailing the exact date, time,
and location of the public meetings will
be forthcoming.
For further information, please
contact Matt Buhyoff at (202) 502–6824
or at matt.buhyoff@ferc.gov.
18397
2015 in the above referenced docket.
Pursuant to its part 157, subpart F,
blanket certificate authority, Northern
proposes to construct and abandon
facilities in Clark and Codington
Counties, South Dakota. Protestor seeks
to have this prior notice request
processed as a case-specific application
filed under section 7(c) of the Natural
Gas Act and part 157, subpart A, of the
Commission’s regulations.1
Protestor notes that on February 27,
2015, Northern filed a data response
which described communication with
the Sisseton-Wahpeton Oyate of the
Lake Traverse Reservation (tribe). The
tribe indicated that it would be
necessary to conduct a Traditional
Cultural Properties (TCP) survey to
ensure that no TCPs would be affected
by construction. Northern has not yet
provided the results of the TCP survey.
Northern must file with the FERC the
results of the TCP survey and/or
updated communication with the tribe
to ensure the project’s compliance with
the National Historic Preservation Act,
as required under Appendix II to
Subpart F of Part 157 of the
Commission’s regulations. Without this
information, environmental concerns
cannot be adequately assessed before
the protest period expires today.
Dated: March 31, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–07795 Filed 4–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Attendance at PJM
Interconnection, LLC Meetings
Dated: March 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–07764 Filed 4–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, LLC
(PJM) Members Committee and Markets
and Reliability Committee meetings, as
well as other PJM committee,
subcommittee or task force meetings.1
[Docket No. CP15–61–000]
Northern Natural Gas Company; Notice
of Staff Protest to Proposed Blanket
Certificate Activity
Commission staff (Protestor) hereby
protests the prior notice request filed
under the provisions of part 157,
subpart F, of the Commission’s
regulations, by Northern Natural Gas
Company (Northern) on January 20,
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
1 Section 157.205(f) provides that a protested
prior notice filing shall be treated as though it had
filed a case-specific application under NGA section
7, unless, pursuant to section 157.205(g) the
protestor withdraws its protest within 30 days after
protests were due.
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
E:\FR\FM\06APN1.SGM
Continued
06APN1
18398
Federal Register / Vol. 80, No. 65 / Monday, April 6, 2015 / Notices
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
•
•
•
•
•
•
•
April 23, 2015 (Wilmington, DE)
May 19–21, 2015 (Atlantic City, NJ)
June 25, 2015 (TBD)
August, 27, 2015 (TBD)
September 24, 2015 (TBD)
October 22, 2015 (TBD)
November 19, 2015 (TBD)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
•
April 23, 2015 (Wilmington, DE)
May 28, 2015 (Wilmington, DE)
June 25, 2015 (Wilmington, DE)
July 23, 2015 (Wilmington, DE)
August 27, 2015 (Wilmington, DE)
September 24, 2015 (TBD)
October 22, 2015 (TBD)
November 19, 2015 (TBD)
December 17, 2015 (TBD)
tkelley on DSK4VPTVN1PROD with NOTICES
PJM Market Implementation Committee
• April 8, 2015 (Audubon, PA)
• May 6, 2015 (Audubon, PA)
• June 10, 2015 (Audubon, PA)
• July 8, 2015 (Audubon, PA)
• August 12, 2015 (Audubon, PA)
• September 9, 2015 (Audubon, PA)
• October 7, 2015 (Audubon, PA)
• November 4, 2015 (Audubon, PA)
• December 2, 2015 (Audubon, PA)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL08–14, Black Oak
Energy LLC, et al., v. FERC
Docket No. ER09–1148, PPL Electric
Utilities Corporation
Docket No. ER09–1256, PotomacAppalachian Transmission Highline,
L.L.C.
Docket Nos. ER09–1589 and EL10–6,
FirstEnergy Service Company
Docket No. EL10–52, Central
Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL11–54, Buckeye Power,
Inc. v. American Transmission Systems
Incorporated
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. AD12–1 and ER11–4081,
Midwest Independent Transmission
System Operator, Inc.
Docket No. AD12–16, Capacity
Deliverability Across the Midwest
Independent Transmission System
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM Web site.
VerDate Sep<11>2014
18:14 Apr 03, 2015
Jkt 235001
Operator, Inc./PJM Interconnection,
L.L.C. Seam
Docket No. EL12–54, Viridity Energy,
Inc. v. PJM Interconnection, L.L.C.
Docket No. ER12–91, PJM
Interconnection, L.L.C.
Docket No. ER12–92, PJM
Interconnection, L.L.C., et al.
Docket No. ER12–2399, PJM
Interconnection, L.L.C.
Docket No. ER12–2708, PJM
Interconnection, L.L.C.
Docket No. EL13–47, FirstEnergy
Solutions Corporation v. PJM
Interconnection, L.L.C. et al.
Docket No. ER13–90, Public Service
Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13–195, Indicated PJM
Transmission Owners
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. ER13–349–001, PJM
Interconnection, L.L.C.
Docket No. ER13–535, PJM
Interconnection, L.L.C.
Docket No. ER13–1654, PJM
Interconnection, L.L.C.
Docket No. ER13–1924, PJM
Interconnection, L.L.C.
Docket No. ER13–1926, PJM
Interconnection, L.L.C.
Docket No. ER13–1927, PJM
Interconnection, L.L.C.
Docket No. ER13–1936, PJM
Interconnection, L.L.C.
Docket No. ER13–1944, PJM
Interconnection, L.L.C.
Docket No. ER13–1947, PJM
Interconnection, L.L.C.
Docket No. ER13–2108, PJM
Interconnection, L.L.C.
Docket No. EL14–20, Independent
Market Monitor v. PJM Interconnection,
L.L.C.,
Docket No. EL14–45, Duke Energy
Corporation, et al., v. PJM
Interconnection, L.L.C.
Docket No. EL14–55, FirstEnergy
Service Company v. PJM
Interconnection, L.L.C.
Docket Nos. EL14–94, EL14–36,
FirstEnergy Solutions Corporation and
PJM Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket No. ER14–503, PJM
Interconnection, L.L.C.
Docket No. ER14–504, PJM
Interconnection, L.L.C.
Docket No. ER15–746, RC Cape May
Holdings, LLC
Docket No. ER14–822, PJM
Interconnection, L.L.C.
Docket No. ER14–1144, PJM
Interconnection, L.L.C.
Docket No. ER14–1145, PJM
Interconnection, L.L.C.
Docket No. ER14–1461, PJM
Interconnection, L.L.C.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
Docket No. ER14–1485, PJM
Interconnection, L.L.C.
Docket No. ER14–2242, Old Dominion
Electric Cooperative
Docket Nos. ER14–2864, ER14–2867,
PJM Interconnection, L.L.C., and
Baltimore Gas & Electric Company, et
al.
Docket No. ER14–2940, PJM
Interconnection, L.L.C.
Docket No. EL15–15, ER15–696, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–31, PJM
Interconnection, L.L.C.
Docket No. EL15–38, RTO Energy
Trading, LLC
Docket No. EL15–40, Public Service
Electric and Gas Company v. PJM
Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et al., v. PJM
Interconnection, L.L.C.
Docket No. EL15–46, Champion
Energy Marketing LLC v. PJM
Interconnection, L.L.C.
Docket No. ER15–61, PJM
Interconnection, L.L.C., and American
Transmission Systems, Incorporated
Docket No. ER15–135, PJM
Interconnection, L.L.C.
Docket Nos. ER15–623, EL15–29, PJM
Interconnection, L.L.C.
Docket No. ER15–643, PJM
Interconnection, L.L.C.
Docket No. ER15–738, PJM
Interconnection, L.L.C.
Docket No. ER15–739, PJM
Interconnection, L.L.C.
Docket No. ER15–834, Illinois
Municipal Electric Agency
Docket No. ER15–852, PJM
Interconnection, L.L.C.
Docket No. ER15–952, New Jersey
Energy Associates, A Limited
Partnership
Docket No. ER15–1193, PJM
Interconnection, L.L.C.
Docket No. ER15–1232, Illinois
Municipal Electric Agency
Docket No. ER13–1957, ISO New
England Inc., New York Independent
System Operator, Inc., and PJM
Interconnection, L.L.C.
Docket No. ER13–1942, New York
Independent System Operator, Inc.
Docket No. ER13–1946, New York
Independent System Operator, Inc.
Docket No. ER13–1947, PJM
Interconnection, L.L.C.
Docket No. ER13–1960, ISO New
England Inc. and New England Power
Pool Participants Committee
Docket No. ER13–1926, PJM
Interconnection, L.L.C. and Duquesne
Light Company
Docket No. ER13–1944, PJM
Interconnection, L.L.C.
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 80, No. 65 / Monday, April 6, 2015 / Notices
Docket No. ER13–1943, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1924, PJM
Interconnection, L.L.C. and Duquesne
Light Company
Docket No. ER13–1945, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1955, Entergy
Services, Inc.
Docket No. ER13–1956, Cleco Power
LLC
Docket No. ER15–376, Calpine Energy
Services, L.P.
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: March 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–07761 Filed 4–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 516–482]
tkelley on DSK4VPTVN1PROD with NOTICES
South Carolina Electric and Gas
Company; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 516–482.
c. Date Filed: March 19, 2015.
d. Applicant: South Carolina Electric
and Gas Company.
e. Name of Project: Saluda Project.
f. Location: Saluda River in Richland,
Lexington, Saluda, and Newberry
counties, South Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r
h. Applicant Contact: Tommy Boozer,
Manager, Lake Management Programs,
South Carolina Electric and Gas
Company, 6248 Bush River Road,
Columbia, South Carolina 29212;
Telephone: (803) 217–9007.
i. FERC Contact: Shana High at (202)
502–8674, or email: shana.high@
ferc.gov.
VerDate Sep<11>2014
18:14 Apr 03, 2015
Jkt 235001
j. Deadline for filing comments,
motions to intervene, and protests: April
29, 2015.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–516–482) on any comments,
motions, or recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: South
Carolina Electric and Gas Company
requests Commission approval to permit
the South Carolina Department of Parks,
Recreation, and Tourism to replace and
expand its existing 33-slip Dreher Island
Marina at Dreher Island State Park with
a facility that would accommodate 100
boats.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–516) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
PO 00000
Frm 00048
Fmt 4703
Sfmt 9990
18399
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–07762 Filed 4–3–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 80, Number 65 (Monday, April 6, 2015)]
[Notices]
[Pages 18397-18399]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07761]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Interconnection, LLC Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, LLC (PJM) Members Committee and Markets
and Reliability Committee meetings, as well as other PJM committee,
subcommittee or task force meetings.\1\
[[Page 18398]]
The Commission and Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM subcommittees and task forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, the Commission and Commission staff
may monitor the various meetings posted on the PJM Web site.
---------------------------------------------------------------------------
PJM Members Committee
April 23, 2015 (Wilmington, DE)
May 19-21, 2015 (Atlantic City, NJ)
June 25, 2015 (TBD)
August, 27, 2015 (TBD)
September 24, 2015 (TBD)
October 22, 2015 (TBD)
November 19, 2015 (TBD)
PJM Markets and Reliability Committee
April 23, 2015 (Wilmington, DE)
May 28, 2015 (Wilmington, DE)
June 25, 2015 (Wilmington, DE)
July 23, 2015 (Wilmington, DE)
August 27, 2015 (Wilmington, DE)
September 24, 2015 (TBD)
October 22, 2015 (TBD)
November 19, 2015 (TBD)
December 17, 2015 (TBD)
PJM Market Implementation Committee
April 8, 2015 (Audubon, PA)
May 6, 2015 (Audubon, PA)
June 10, 2015 (Audubon, PA)
July 8, 2015 (Audubon, PA)
August 12, 2015 (Audubon, PA)
September 9, 2015 (Audubon, PA)
October 7, 2015 (Audubon, PA)
November 4, 2015 (Audubon, PA)
December 2, 2015 (Audubon, PA)
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission,
including the following currently pending proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL08-14, Black Oak Energy LLC, et al., v. FERC
Docket No. ER09-1148, PPL Electric Utilities Corporation
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline,
L.L.C.
Docket Nos. ER09-1589 and EL10-6, FirstEnergy Service Company
Docket No. EL10-52, Central Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL11-54, Buckeye Power, Inc. v. American Transmission
Systems Incorporated
Docket No. ER11-1844, Midwest Independent Transmission System
Operator, Inc.
Docket No. AD12-1 and ER11-4081, Midwest Independent Transmission
System Operator, Inc.
Docket No. AD12-16, Capacity Deliverability Across the Midwest
Independent Transmission System Operator, Inc./PJM Interconnection,
L.L.C. Seam
Docket No. EL12-54, Viridity Energy, Inc. v. PJM Interconnection,
L.L.C.
Docket No. ER12-91, PJM Interconnection, L.L.C.
Docket No. ER12-92, PJM Interconnection, L.L.C., et al.
Docket No. ER12-2399, PJM Interconnection, L.L.C.
Docket No. ER12-2708, PJM Interconnection, L.L.C.
Docket No. EL13-47, FirstEnergy Solutions Corporation v. PJM
Interconnection, L.L.C. et al.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-198, PJM Interconnection, L.L.C.
Docket No. ER13-349-001, PJM Interconnection, L.L.C.
Docket No. ER13-535, PJM Interconnection, L.L.C.
Docket No. ER13-1654, PJM Interconnection, L.L.C.
Docket No. ER13-1924, PJM Interconnection, L.L.C.
Docket No. ER13-1926, PJM Interconnection, L.L.C.
Docket No. ER13-1927, PJM Interconnection, L.L.C.
Docket No. ER13-1936, PJM Interconnection, L.L.C.
Docket No. ER13-1944, PJM Interconnection, L.L.C.
Docket No. ER13-1947, PJM Interconnection, L.L.C.
Docket No. ER13-2108, PJM Interconnection, L.L.C.
Docket No. EL14-20, Independent Market Monitor v. PJM
Interconnection, L.L.C.,
Docket No. EL14-45, Duke Energy Corporation, et al., v. PJM
Interconnection, L.L.C.
Docket No. EL14-55, FirstEnergy Service Company v. PJM
Interconnection, L.L.C.
Docket Nos. EL14-94, EL14-36, FirstEnergy Solutions Corporation and
PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket No. ER14-503, PJM Interconnection, L.L.C.
Docket No. ER14-504, PJM Interconnection, L.L.C.
Docket No. ER15-746, RC Cape May Holdings, LLC
Docket No. ER14-822, PJM Interconnection, L.L.C.
Docket No. ER14-1144, PJM Interconnection, L.L.C.
Docket No. ER14-1145, PJM Interconnection, L.L.C.
Docket No. ER14-1461, PJM Interconnection, L.L.C.
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket No. ER14-2242, Old Dominion Electric Cooperative
Docket Nos. ER14-2864, ER14-2867, PJM Interconnection, L.L.C., and
Baltimore Gas & Electric Company, et al.
Docket No. ER14-2940, PJM Interconnection, L.L.C.
Docket No. EL15-15, ER15-696, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc.
v. PJM Interconnection, L.L.C.
Docket No. EL15-31, PJM Interconnection, L.L.C.
Docket No. EL15-38, RTO Energy Trading, LLC
Docket No. EL15-40, Public Service Electric and Gas Company v. PJM
Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, LLC, et al., v.
PJM Interconnection, L.L.C.
Docket No. EL15-46, Champion Energy Marketing LLC v. PJM
Interconnection, L.L.C.
Docket No. ER15-61, PJM Interconnection, L.L.C., and American
Transmission Systems, Incorporated
Docket No. ER15-135, PJM Interconnection, L.L.C.
Docket Nos. ER15-623, EL15-29, PJM Interconnection, L.L.C.
Docket No. ER15-643, PJM Interconnection, L.L.C.
Docket No. ER15-738, PJM Interconnection, L.L.C.
Docket No. ER15-739, PJM Interconnection, L.L.C.
Docket No. ER15-834, Illinois Municipal Electric Agency
Docket No. ER15-852, PJM Interconnection, L.L.C.
Docket No. ER15-952, New Jersey Energy Associates, A Limited
Partnership
Docket No. ER15-1193, PJM Interconnection, L.L.C.
Docket No. ER15-1232, Illinois Municipal Electric Agency
Docket No. ER13-1957, ISO New England Inc., New York Independent
System Operator, Inc., and PJM Interconnection, L.L.C.
Docket No. ER13-1942, New York Independent System Operator, Inc.
Docket No. ER13-1946, New York Independent System Operator, Inc.
Docket No. ER13-1947, PJM Interconnection, L.L.C.
Docket No. ER13-1960, ISO New England Inc. and New England Power
Pool Participants Committee
Docket No. ER13-1926, PJM Interconnection, L.L.C. and Duquesne
Light Company
Docket No. ER13-1944, PJM Interconnection, L.L.C.
[[Page 18399]]
Docket No. ER13-1943, Midcontinent Independent System Operator,
Inc.
Docket No. ER13-1924, PJM Interconnection, L.L.C. and Duquesne
Light Company
Docket No. ER13-1945, Midcontinent Independent System Operator,
Inc.
Docket No. ER13-1955, Entergy Services, Inc.
Docket No. ER13-1956, Cleco Power LLC
Docket No. ER15-376, Calpine Energy Services, L.P.
For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
Valerie.Martin@ferc.gov.
Dated: March 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-07761 Filed 4-3-15; 8:45 am]
BILLING CODE 6717-01-P