East Tennessee Natural Gas, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Loudon Expansion Project and Request for Comments on Environmental Issues, 16662-16664 [2015-07202]

Download as PDF 16662 Federal Register / Vol. 80, No. 60 / Monday, March 30, 2015 / Notices reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: March 24, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–07205 Filed 3–27–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES [Docket No. TS15–1–000] City of Alexandria, Louisiana; Notice of Filing Take notice that on December 31, 2014, the City of Alexandria, Louisiana filed a motion requesting full waiver of reciprocity-based Open Access Transmission Tariff (OATT), Open Access Same Time Information System (OASIS), and Standards of Conduct VerDate Sep<11>2014 19:57 Mar 27, 2015 Jkt 235001 requirements that might otherwise apply to Alexandria under Order Nos. 888,1 889,2 890,3 2004,4 and 717 5 and part 385 of the Commission’s regulations. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies 1 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, FERC Stats. & Regs. ¶ 31,036 (1996), order on reh’g, Order No. 888–A, FERC Stats. & Regs. ¶ 31,048, order on reh’g, Order No. 888–B, 81 FERC ¶ 61,248 (1997), order on reh’g, Order No. 888–C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission Access Policy Study Group v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. FERC, 535 U.S. 1 (2002) (Order No. 888). 2 Open Access Same-Time Information System (formerly Real-Time Information Networks) and Standards of Conduct, Order No. 889, FERC Stats. & Regs. ¶ 31,035 (1996), order on reh’g, Order No. 889–A, FERC Stats. & Regs. ¶ 31,049 (1997), order on reh’g, Order No. 889–B, 81 FERC ¶ 61,253 (1997). 3 Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, FERC Stats. & Regs. ¶ 31,241, order on reh’g, Order No. 890–A, FERC Stats. & Regs. ¶ 31,261 (2007), order on reh’g, Order No. 890–B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890–C, 126 FERC ¶ 61,228 (2009) order on reh’g, Order No. 890–D, 129 FERC ¶ 61,126 (2009) (Order No. 890). 4 Standards of Conduct for Transmission Providers, Order No. 2004, FERC Stats. & Regs. ¶ 31,155 (2003), order on reh’g, Order No. 2004–A, FERC Stats. & Regs. ¶ 31,161, order on reh’g, Order No. 2004–B, FERC Stats. & Regs. ¶ 31,166, order on reh’g, Order No. 2004–C, FERC Stats. & Regs. ¶ 31,172 (2004), order on reh’g, Order No. 2004–D, 110 FERC ¶ 61,320 (2005), vacated and remanded as it applies to natural gas pipelines sub nom. National Fuel Gas Supply Corp. v. FERC, 468 F.3d 831 (D.C. Cir. 2006); see Standards of Conduct for Transmission Providers, Order No. 690, FERC Stats. & Regs. ¶ 31,237, order on reh’g, Order No. 690–A, FERC Stats. & Regs. ¶ 31,243 (2007); see also Order No. 717, FERC Stats. & Regs. ¶ 31,280. 5 Standards of Conduct for Transmission Providers, Order No. 717, FERC Stats. & Regs. ¶ 31,280 (2008) order on reh’g, Order No. 717–A, FERC Stats. & Regs. ¶ 31,297 (2009) order on reh’g, Order No. 717–B, 129 FERC ¶ 61,123 (2009). PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street N.E., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 14, 2015. Dated: March 24, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–07195 Filed 3–27–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–91–000] East Tennessee Natural Gas, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Loudon Expansion Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Loudon Expansion Project involving construction and operation of facilities by East Tennessee Natural Gas, LLC (East Tennessee) in Monroe and Loudon Counties, Tennessee. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on April 23, 2015. Further details on how to submit written comments are in the Public Participation section of this notice. If you sent comments on this project to the Commission before the opening of this E:\FR\FM\30MRN1.SGM 30MRN1 Federal Register / Vol. 80, No. 60 / Monday, March 30, 2015 / Notices docket on February 20, 2015, you will need to file those comments in Docket No. CP15–91–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. East Tennessee provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). mstockstill on DSK4VPTVN1PROD with NOTICES Summary of the Proposed Project East Tennessee would construct, own, and operate a new pipeline and related appurtenant facilities extending from its existing 12-inch-diameter Line 3200–1 pipeline in Monroe County, Tennessee to Tate & Lyle Americas Ingredients, LLC (Tate & Lyle) a manufacturer of artificial sweeteners and ethanol products in Loudon County, Tennessee. The Loudon Expansion Project would provide up to 40,000 decatherms per day of natural gas to Tate & Lyle, which is planning to convert its existing coal fired boilers to natural gas, and install a new natural gas fueled combined cycle electric power plant. The Loudon Expansion Project would consist of the following facilities: • About 10 miles of 12-inch-diameter pipeline (Loudon Mainline Extension) in Monroe and Loudon Counties; • A new 12-inch mainline valve, two 12-inch tee taps and related appurtenant facilities at the interconnection of the Loudon Mainline Extension with the existing Line 3200–1 mainline in Monroe County; VerDate Sep<11>2014 19:57 Mar 27, 2015 Jkt 235001 • A new meter facility and related appurtenances located at the end of the Loudon Mainline Extension at the Tate & Lyle Plant in Loudon County, Tennessee; • Above- and below-ground piping, flow measurement equipment, flow control equipment, filter/separator, pig launcher and receiver,1 aboveground valve operators for belowground valves, blowdowns, and a condensate tank; and • A new pressure regulator at existing meter station 59039 on East Tennessee’s existing Loudon-Lenoir City Lateral Line 3218D–100, in Loudon County. The general location of the project facilities is shown in appendix 1.2 Land Requirements for Construction Construction of the proposed facilities would disturb about 88.5 acres of land. Following construction, East Tennessee would maintain about 62.3 acres for permanent operation of the project’s facilities; the remaining acreage would be restored and revert to former uses. About 87 percent of the pipeline route parallels existing pipeline, utility, or road rights-of-way. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 3 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; 1 A ‘‘pig’’ is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. 2 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to pages 6 and 7 of this notice. 3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 16663 • Land use; • Water resources and fisheries, and wetlands; • Cultural resources; • Vegetation and wildlife, including migratory birds; • Air quality and noise; • Endangered and threatened species; and • Public safety. We will also evaluate reasonable alternatives to the project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section beginning on page 5. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for Section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the Tennessee State Historic Preservation Office (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO as the project develops. On natural gas 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 5 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\30MRN1.SGM 30MRN1 16664 Federal Register / Vol. 80, No. 60 / Monday, March 30, 2015 / Notices facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/ pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under Section 106. Currently Identified Environmental Issues We have already identified several issues that we think deserve attention based on a preliminary review of the proposed facilities and the environmental information provided by East Tennessee. This preliminary list of issues may be changed based on your comments and our analysis. These include impacts on: • Waterbodies; • Karst geology, including caves; • Soils; • Migratory birds; • Vegetation; • Candidate and listed threatened or endangered species; • Land use; • Air quality and noise; • Safety; and • Alternative routes. mstockstill on DSK4VPTVN1PROD with NOTICES Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before April 23, 2015. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number (CP15–91–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for interested persons to submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature on the Commission’s Web site VerDate Sep<11>2014 19:57 Mar 27, 2015 Jkt 235001 (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP15–91). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ docs-filing/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: March 24, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–07202 Filed 3–27–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–87–000] Columbia Gas Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed UTICA Access Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Utica Access Project involving construction and operation of facilities by Columbia Gas Transmission, LLC. (Columbia) in Clay and Kanawha Counties, West Virginia. The Commission will use this EA in its decision-making process to determine E:\FR\FM\30MRN1.SGM 30MRN1

Agencies

[Federal Register Volume 80, Number 60 (Monday, March 30, 2015)]
[Notices]
[Pages 16662-16664]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07202]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-91-000]


East Tennessee Natural Gas, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Loudon Expansion Project and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Loudon Expansion Project 
involving construction and operation of facilities by East Tennessee 
Natural Gas, LLC (East Tennessee) in Monroe and Loudon Counties, 
Tennessee. The Commission will use this EA in its decision-making 
process to determine whether the project is in the public convenience 
and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues they need to evaluate in the EA. Please note that 
the scoping period will close on April 23, 2015.
    Further details on how to submit written comments are in the Public 
Participation section of this notice. If you sent comments on this 
project to the Commission before the opening of this

[[Page 16663]]

docket on February 20, 2015, you will need to file those comments in 
Docket No. CP15-91-000 to ensure they are considered as part of this 
proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    East Tennessee provided landowners with a fact sheet prepared by 
the FERC entitled ``An Interstate Natural Gas Facility On My Land? What 
Do I Need To Know?'' This fact sheet addresses a number of typically 
asked questions, including the use of eminent domain and how to 
participate in the Commission's proceedings. It is also available for 
viewing on the FERC Web site (www.ferc.gov).

Summary of the Proposed Project

    East Tennessee would construct, own, and operate a new pipeline and 
related appurtenant facilities extending from its existing 12-inch-
diameter Line 3200-1 pipeline in Monroe County, Tennessee to Tate & 
Lyle Americas Ingredients, LLC (Tate & Lyle) a manufacturer of 
artificial sweeteners and ethanol products in Loudon County, Tennessee. 
The Loudon Expansion Project would provide up to 40,000 decatherms per 
day of natural gas to Tate & Lyle, which is planning to convert its 
existing coal fired boilers to natural gas, and install a new natural 
gas fueled combined cycle electric power plant.
    The Loudon Expansion Project would consist of the following 
facilities:
     About 10 miles of 12-inch-diameter pipeline (Loudon 
Mainline Extension) in Monroe and Loudon Counties;
     A new 12-inch mainline valve, two 12-inch tee taps and 
related appurtenant facilities at the interconnection of the Loudon 
Mainline Extension with the existing Line 3200-1 mainline in Monroe 
County;
     A new meter facility and related appurtenances located at 
the end of the Loudon Mainline Extension at the Tate & Lyle Plant in 
Loudon County, Tennessee;
     Above- and below-ground piping, flow measurement 
equipment, flow control equipment, filter/separator, pig launcher and 
receiver,\1\ aboveground valve operators for belowground valves, 
blowdowns, and a condensate tank; and
---------------------------------------------------------------------------

    \1\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------

     A new pressure regulator at existing meter station 59039 
on East Tennessee's existing Loudon-Lenoir City Lateral Line 3218D-100, 
in Loudon County.
    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
pages 6 and 7 of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 88.5 
acres of land. Following construction, East Tennessee would maintain 
about 62.3 acres for permanent operation of the project's facilities; 
the remaining acreage would be restored and revert to former uses. 
About 87 percent of the pipeline route parallels existing pipeline, 
utility, or road rights-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     Land use;
     Water resources and fisheries, and wetlands;
     Cultural resources;
     Vegetation and wildlife, including migratory birds;
     Air quality and noise;
     Endangered and threatened species; and
     Public safety.
    We will also evaluate reasonable alternatives to the project or 
portions of the project, and make recommendations on how to lessen or 
avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section beginning on page 5.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\4\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for Section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the Tennessee State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\5\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas

[[Page 16664]]

facility projects, the APE at a minimum encompasses all areas subject 
to ground disturbance (examples include construction right-of-way, 
contractor/pipe storage yards, compressor stations, and access roads). 
Our EA for this project will document our findings on the impacts on 
historic properties and summarize the status of consultations under 
Section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Currently Identified Environmental Issues

    We have already identified several issues that we think deserve 
attention based on a preliminary review of the proposed facilities and 
the environmental information provided by East Tennessee. This 
preliminary list of issues may be changed based on your comments and 
our analysis. These include impacts on:
     Waterbodies;
     Karst geology, including caves;
     Soils;
     Migratory birds;
     Vegetation;
     Candidate and listed threatened or endangered species;
     Land use;
     Air quality and noise;
     Safety; and
     Alternative routes.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that the Commission receives them in Washington, DC on or before April 
23, 2015.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the project docket number (CP15-91-000) with your submission. 
The Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for interested persons to 
submit brief, text-only comments on a project;
    (2) You can file your comments electronically using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the User's Guide under the ``e-filing'' link on the Commission's Web 
site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP15-
91). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: March 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-07202 Filed 3-27-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.