Modesto Irrigation District Turlock Irrigation District v. Pacific Gas and Electric Company; Notice of Complaint, 16671 [2015-07144]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 60 / Monday, March 30, 2015 / Notices Filed Date: 3/20/15. Accession Number: 20150320–5277. Comments Due: 5 p.m. ET 4/10/15. Docket Numbers: ER10–2881–019; ER10–2882–019; ER10–2883–019; ER10– 2884–019; ER10–2885–019; ER10–2641– 019; ER10–2663–019; ER10–2886–019; ER13–1101–014; ER13–1541–013; ER14– 787–007; ER14–661–006. Applicants: Alabama Power Company, Southern Power Company, Mississippi Power Company, Georgia Power Company, Gulf Power Company, Oleander Power Project, Limited Partnership, Southern Company— Florida LLC, Southern Turner Cimarron I, LLC, Spectrum Nevada Solar, LLC, Campo Verde Solar, LLC, Macho Springs Solar, LLC, SG2 Imperial Valley LLC. Description: Notification of NonMaterial of Change in Status of Alabama Power Company, et. al. Filed Date: 3/20/15. Accession Number: 20150320–5276. Comments Due: 5 p.m. ET 4/10/15. Docket Numbers: ER12–959–000. Applicants: Southwest Power Pool, Inc. Description: eTariff filing per 35.19a(b): Tri-County Electric Cooperative Formula Rate Refund Report in ER12–959–000 to be effective N/A. Filed Date: 3/23/15. Accession Number: 20150323–5142. Comments Due: 5 p.m. ET 4/13/15. Docket Numbers: ER13–823–003; ER15–1348–001; ER12–1561–002. Applicants: Castleton Commodities Merchant Trading L, Roseton Generating LLC, CCI Rensselaer LLC. Description: Triennial Market Power Analysis Update of Castleton Commodities Merchant Trading L.P. for the Northeast Region. Filed Date: 3/20/15. Accession Number: 20150320–5283. Comments Due: 5 p.m. ET 5/19/15. Docket Numbers: ER15–1029–001. Applicants: Chubu TT Energy Management Inc. Description: Tariff Amendment per 35.17(b): Chubu TT MBRA App Supplement to be effective 4/15/2015. Filed Date: 3/20/15. Accession Number: 20150320–5230. Comments Due: 5 p.m. ET 4/10/15. Docket Numbers: ER15–1351–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Service Agreement No. 3770; Queue No. X1–037 to be effective 2/19/2015 under ER15–1351 Filing Type: 10. Filed Date: 3/23/15. Accession Number: 20150323–5138. VerDate Sep<11>2014 19:57 Mar 27, 2015 Jkt 235001 Comments Due: 5 p.m. ET 4/13/15. Docket Numbers: ER15–1352–000. Applicants: Portsmouth Genco, LLC. Description: Petition for Limited Waiver of Tariff Deadlines and Request for Expedited Action of Portsmouth Genco, LLC. Filed Date: 3/23/15. Accession Number: 20150323–5164. Comments Due: 5 p.m. ET 4/13/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern Time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 23, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–07152 Filed 3–27–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15–55–000] Modesto Irrigation District Turlock Irrigation District v. Pacific Gas and Electric Company; Notice of Complaint Take notice that on March 18, 2015, pursuant to section 202, 206, 306 and 309 of the Federal Power Act, 16 U.S.C. 824(a), 825(e), 825(e), 825(h) and rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 Modesto Irrigation District (Mid) and the Turlock Irrigation District (TID) (collectively, Complainants) filed a formal complaint against the Pacific Gas and Electric Company (PG&E or Respondent), alleging that PG&E has breached and anticipatorily breached each Complainants’ respective Interconnection Agreements on file with the Commission, in violation of the Federal Power Act, by: (1) Failing to fully and properly notify the PO 00000 Frm 00056 Fmt 4703 Sfmt 9990 16671 Complainants of modifications to Respondent’s Remedial Action Scheme (RAS); (2) refusing and failing to study the potential Adverse Impacts arising from these RAS modifications; and (3) repudiating Respondent’s obligation to mitigate or compensate for adverse impacts arising from such RAS modifications. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 7, 2015. Dated: March 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–07144 Filed 3–27–15; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\30MRN1.SGM 30MRN1

Agencies

[Federal Register Volume 80, Number 60 (Monday, March 30, 2015)]
[Notices]
[Page 16671]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-07144]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL15-55-000]


Modesto Irrigation District Turlock Irrigation District v. 
Pacific Gas and Electric Company; Notice of Complaint

    Take notice that on March 18, 2015, pursuant to section 202, 206, 
306 and 309 of the Federal Power Act, 16 U.S.C. 824(a), 825(e), 825(e), 
825(h) and rule 206 of the Federal Energy Regulatory Commission's 
(Commission) Rules of Practice and Procedure, 18 CFR 385.206 Modesto 
Irrigation District (Mid) and the Turlock Irrigation District (TID) 
(collectively, Complainants) filed a formal complaint against the 
Pacific Gas and Electric Company (PG&E or Respondent), alleging that 
PG&E has breached and anticipatorily breached each Complainants' 
respective Interconnection Agreements on file with the Commission, in 
violation of the Federal Power Act, by: (1) Failing to fully and 
properly notify the Complainants of modifications to Respondent's 
Remedial Action Scheme (RAS); (2) refusing and failing to study the 
potential Adverse Impacts arising from these RAS modifications; and (3) 
repudiating Respondent's obligation to mitigate or compensate for 
adverse impacts arising from such RAS modifications.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on April 7, 2015.

    Dated: March 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-07144 Filed 3-27-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.