Turlock Irrigation District, Modesto Irrigation District, La Grange Hydroelectric Project; Notice of Dispute Resolution Panel Meeting and Technical Conference, 15593 [2015-06633]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 56 / Tuesday, March 24, 2015 / Notices
Distribution Service Agmt Tesoro
Refining & Marketing Company to be
effective 3/17/2015.
Filed Date: 3/17/15.
Accession Number: 20150317–5001.
Comments Due: 5 p.m. ET 4/7/15.
Docket Numbers: ER15–1304–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2994 KMEA/Sunflower
Facilities Construction Agreement to be
effective 2/20/2015.
Filed Date: 3/17/15.
Accession Number: 20150317–5030.
Comments Due: 5 p.m. ET 4/7/15.
Docket Numbers: ER15–1305–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): AECC Bates Tap
Delivery Point Agreement to be effective
2/23/2015.
Filed Date: 3/17/15.
Accession Number: 20150317–5048.
Comments Due: 5 p.m. ET 4/7/15.
Docket Numbers: ER15–1306–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): AECC Barite Road Tap
Delivery Point Agreement to be effective
2/26/2015.
Filed Date: 3/17/15.
Accession Number: 20150317–5050.
Comments Due: 5 p.m. ET 4/7/15.
Docket Numbers: ER15–1307–000.
Applicants: AEP Texas Central
Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): TCC-La Paloma Energy
Center IA First Amend & Restated to be
effective 2/26/2015.
Filed Date: 3/17/15.
Accession Number: 20150317–5055.
Comments Due: 5 p.m. ET 4/7/15.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES15–13–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 204 Application
of Midcontinent Independent System
Operator, Inc.
Filed Date: 3/17/15.
Accession Number: 20150317–5140.
Comments Due: 5 p.m. ET 4/7/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
VerDate Sep<11>2014
01:09 Mar 24, 2015
Jkt 235001
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 17, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–06598 Filed 3–23–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12635–002; Project No. 12152–
000]
Moriah Hydro Corporation; Notice of
Pre-Filing Activities in Another Docket
Take notice that some pre-filing
activities related to the preparation of
the license application for the Mineville
Energy Storage Project (P–12635–002)
were undertaken in docket number P–
12152–000. Documents pertaining to
that proceeding are available in the
Commission’s eLibrary under docket
number P–12152.
For further information, please
contact John Mudre at (202) 502–8902.
Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06632 Filed 3–23–15; 8:45 am]
15593
identified below. The technical
conference will address the study
dispute regarding potential effects of the
La Grange Project (P–14581) on the
genetic makeup of steelhead/rainbow
trout in the Tuolumne River. As
directed by the Commission’s letter
issued on February 27, 2015, the panel
will not consider the study dispute on
Tuolumne River habitats for
anadromous fish.
The purpose of the technical session
is for the disputing agency, applicant,
and Commission to provide the Panel
with additional information necessary
to evaluate the disputed studies. All
local, state, and federal agencies, Indian
tribes, and other interested parties are
invited to attend the meeting as
observers. The Panel may also request
information or clarification on written
submissions as necessary to understand
the matters in dispute. The Panel will
limit all input that it receives to the
specific studies or information in
dispute and will focus on the
applicability of such studies or
information to the study criteria
stipulated in 18 CFR 5.9(b). If the
number of participants wishing to speak
creates time constraints, the Panel may,
at its discretion, limit the speaking time
for each participant.
For more information, please contact
Nicholas Ettema, the Dispute Resolution
Panel Chair, at nicholas.ettema@ferc.gov
or 202–502–6565.
Technical Conference
Date: Tuesday, March 31, 2015
Time: 9:00 a.m.–1:00 p.m. (PDT)
Place: Holiday Inn Sacramento—Capitol
Plaza, 300 J Street, Sacramento, CA
95814
BILLING CODE 6717–01–P
Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2015–06633 Filed 3–23–15; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 14581–000]
Turlock Irrigation District, Modesto
Irrigation District, La Grange
Hydroelectric Project; Notice of
Dispute Resolution Panel Meeting and
Technical Conference
On March 16, 2015, Commission staff,
in response to the filing of a notice of
study dispute by the U.S. National
Marine Fisheries Service on February
23, 2015, convened a single threeperson Dispute Resolution Panel (Panel)
pursuant to 18 CFR 5.14(d).
The Panel will hold a technical
conference at the time and place
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EL15–31–002]
PJM Interconnection, L.L.C.; Notice of
Compliance Filing
Take notice that on February 25, 2015,
PJM Interconnection, L.L.C. submitted a
compliance filing, pursuant to the
Commission’s January 16, 2015 Order,1
to be effective 4/1/2015.
1 PJM Interconnection, L.L.C., 150 FERC ¶ 61,020
(2015).
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 80, Number 56 (Tuesday, March 24, 2015)]
[Notices]
[Page 15593]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06633]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14581-000]
Turlock Irrigation District, Modesto Irrigation District, La
Grange Hydroelectric Project; Notice of Dispute Resolution Panel
Meeting and Technical Conference
On March 16, 2015, Commission staff, in response to the filing of a
notice of study dispute by the U.S. National Marine Fisheries Service
on February 23, 2015, convened a single three-person Dispute Resolution
Panel (Panel) pursuant to 18 CFR 5.14(d).
The Panel will hold a technical conference at the time and place
identified below. The technical conference will address the study
dispute regarding potential effects of the La Grange Project (P-14581)
on the genetic makeup of steelhead/rainbow trout in the Tuolumne River.
As directed by the Commission's letter issued on February 27, 2015, the
panel will not consider the study dispute on Tuolumne River habitats
for anadromous fish.
The purpose of the technical session is for the disputing agency,
applicant, and Commission to provide the Panel with additional
information necessary to evaluate the disputed studies. All local,
state, and federal agencies, Indian tribes, and other interested
parties are invited to attend the meeting as observers. The Panel may
also request information or clarification on written submissions as
necessary to understand the matters in dispute. The Panel will limit
all input that it receives to the specific studies or information in
dispute and will focus on the applicability of such studies or
information to the study criteria stipulated in 18 CFR 5.9(b). If the
number of participants wishing to speak creates time constraints, the
Panel may, at its discretion, limit the speaking time for each
participant.
For more information, please contact Nicholas Ettema, the Dispute
Resolution Panel Chair, at nicholas.ettema@ferc.gov or 202-502-6565.
Technical Conference
Date: Tuesday, March 31, 2015
Time: 9:00 a.m.-1:00 p.m. (PDT)
Place: Holiday Inn Sacramento--Capitol Plaza, 300 J Street, Sacramento,
CA 95814
Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06633 Filed 3-23-15; 8:45 am]