Notice of Commission Staff Attendance, 15591 [2015-06631]

Download as PDF Federal Register / Vol. 80, No. 56 / Tuesday, March 24, 2015 / Notices Filed Date: 3/17/15. Accession Number: 20150317–5029. Comments Due: 5 p.m. ET 3/24/15. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 17, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of the New York Independent System Operator, Inc. The New York Independent System Operator, Inc. Electric System Planning Working Group Meeting mstockstill on DSK4VPTVN1PROD with NOTICES March 20, 2015, 10:00 a.m.–4:30 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ markets_operations/services/planning/ index.jsp. The New York Independent System Operator, Inc. Electric System Planning Working Group Meeting April 7, 2015, 10:00 a.m.–4:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. 01:09 Mar 24, 2015 Jkt 235001 The New York Independent System Operator, Inc. Business Issues Committee Meeting April 15, 2015, 10:00 a.m.–4:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ markets_operations/committees/ meeting_materials/index.jsp?com=bic. The New York Independent System Operator, Inc. Operating Committee Meeting April 16, 2015, 10:00 a.m.–4:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ markets_operations/committees/ meeting_materials/index.jsp?com=oc. [FR Doc. 2015–06586 Filed 3–23–15; 8:45 am] VerDate Sep<11>2014 Further information may be found at: https://www.nyiso.com/public/ markets_operations/services/planning/ index.jsp. The New York Independent System Operator, Inc. Electric System Planning Working Group Meeting April 22, 2015, 10:00 a.m.–4:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ markets_operations/services/planning/ index.jsp. The New York Independent System Operator, Inc. Management Committee Meeting April 29, 2015, 10:00 a.m.–4:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ markets_operations/committees/ meeting_materials/index.jsp?com=mc. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket Nos. ER13–102, ER13–1942, ER13–1946, New York Independent System Operator, Inc. and New York Transmission Owners PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 15591 Docket No. ER13–1926, PJM Transmission Owners Docket No. ER13–1947, PJM Interconnection, L.L.C. Docket No. ER13–1957, ISO New England Inc. Docket No. ER13–1960, ISO New England Inc., Participating Transmission Owners Administrative Committee, and New England Power Pool Participants Committee For more information, contact James Eason, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–8622 or James.Eason@ferc.gov. Dated: March 17, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–06631 Filed 3–23–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD15–20–000] Nevada Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On March 4, 2015, the Nevada Irrigation District filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA), as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed Loma Rica Hydroelectric Station In-Conduit Hydroelectric Project would have an installed capacity of 1,440 kilowatts (kW) and would be located on the existing Banner-Cascade Pipeline System, which transports water for agricultural and municipal consumption. The project would be located near the Town of Grass Valley in Nevada County, California. Applicant Contact: Gary King, Engineering Manager, Nevada Irrigation District, 1036 West Main Street, Grass Valley, CA 95945–5424, Phone No. (530) 273–6185. FERC Contact: Robert Bell, Phone No. (202) 502–6062, email: robert.bell@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A proposed 105-foot-long, 36-inch-diameter pipe that connects to a proposed 30-footlong, 24-inch-diameter pipe that delivers water to the powerhouse; (2) a E:\FR\FM\24MRN1.SGM 24MRN1

Agencies

[Federal Register Volume 80, Number 56 (Tuesday, March 24, 2015)]
[Notices]
[Page 15591]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06631]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission's staff may attend the following 
meeting related to the transmission planning activities of the New York 
Independent System Operator, Inc.

The New York Independent System Operator, Inc. Electric System Planning 
Working Group Meeting

March 20, 2015, 10:00 a.m.-4:30 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: https://www.nyiso.com/public/markets_operations/services/planning/index.jsp.

The New York Independent System Operator, Inc. Electric System Planning 
Working Group Meeting

April 7, 2015, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: https://www.nyiso.com/public/markets_operations/services/planning/index.jsp.

The New York Independent System Operator, Inc. Business Issues 
Committee Meeting

April 15, 2015, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: https://www.nyiso.com/public/markets_operations/committees/meeting_materials/index.jsp?com=bic.

The New York Independent System Operator, Inc. Operating Committee 
Meeting

April 16, 2015, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: https://www.nyiso.com/public/markets_operations/committees/meeting_materials/index.jsp?com=oc.

The New York Independent System Operator, Inc. Electric System Planning 
Working Group Meeting

April 22, 2015, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: https://www.nyiso.com/public/markets_operations/services/planning/index.jsp.

The New York Independent System Operator, Inc. Management Committee 
Meeting

April 29, 2015, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: https://www.nyiso.com/public/markets_operations/committees/meeting_materials/index.jsp?com=mc.
    The discussions at the meeting described above may address matters 
at issue in the following proceedings:

Docket Nos. ER13-102, ER13-1942, ER13-1946, New York Independent System 
Operator, Inc. and New York Transmission Owners
Docket No. ER13-1926, PJM Transmission Owners
Docket No. ER13-1947, PJM Interconnection, L.L.C.
Docket No. ER13-1957, ISO New England Inc.
Docket No. ER13-1960, ISO New England Inc., Participating Transmission 
Owners Administrative Committee, and New England Power Pool 
Participants Committee
    For more information, contact James Eason, Office of Energy Market 
Regulation, Federal Energy Regulatory Commission at (202) 502-8622 or 
James.Eason@ferc.gov.


    Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06631 Filed 3-23-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.