Nevada Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 15591-15592 [2015-06628]
Download as PDF
Federal Register / Vol. 80, No. 56 / Tuesday, March 24, 2015 / Notices
Filed Date: 3/17/15.
Accession Number: 20150317–5029.
Comments Due: 5 p.m. ET 3/24/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 17, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meeting related to the
transmission planning activities of the
New York Independent System
Operator, Inc.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
mstockstill on DSK4VPTVN1PROD with NOTICES
March 20, 2015, 10:00 a.m.–4:30 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
markets_operations/services/planning/
index.jsp.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
April 7, 2015, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
01:09 Mar 24, 2015
Jkt 235001
The New York Independent System
Operator, Inc. Business Issues
Committee Meeting
April 15, 2015, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
markets_operations/committees/
meeting_materials/index.jsp?com=bic.
The New York Independent System
Operator, Inc. Operating Committee
Meeting
April 16, 2015, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
markets_operations/committees/
meeting_materials/index.jsp?com=oc.
[FR Doc. 2015–06586 Filed 3–23–15; 8:45 am]
VerDate Sep<11>2014
Further information may be found at:
https://www.nyiso.com/public/
markets_operations/services/planning/
index.jsp.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
April 22, 2015, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
markets_operations/services/planning/
index.jsp.
The New York Independent System
Operator, Inc. Management Committee
Meeting
April 29, 2015, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
markets_operations/committees/
meeting_materials/index.jsp?com=mc.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket Nos. ER13–102, ER13–1942,
ER13–1946, New York Independent
System Operator, Inc. and New York
Transmission Owners
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
15591
Docket No. ER13–1926, PJM
Transmission Owners
Docket No. ER13–1947, PJM
Interconnection, L.L.C.
Docket No. ER13–1957, ISO New
England Inc.
Docket No. ER13–1960, ISO New
England Inc., Participating
Transmission Owners Administrative
Committee, and New England Power
Pool Participants Committee
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06631 Filed 3–23–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–20–000]
Nevada Irrigation District; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On March 4, 2015, the Nevada
Irrigation District filed a notice of intent
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Loma
Rica Hydroelectric Station In-Conduit
Hydroelectric Project would have an
installed capacity of 1,440 kilowatts
(kW) and would be located on the
existing Banner-Cascade Pipeline
System, which transports water for
agricultural and municipal
consumption. The project would be
located near the Town of Grass Valley
in Nevada County, California.
Applicant Contact: Gary King,
Engineering Manager, Nevada Irrigation
District, 1036 West Main Street, Grass
Valley, CA 95945–5424, Phone No.
(530) 273–6185.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
105-foot-long, 36-inch-diameter pipe
that connects to a proposed 30-footlong, 24-inch-diameter pipe that
delivers water to the powerhouse; (2) a
E:\FR\FM\24MRN1.SGM
24MRN1
15592
Federal Register / Vol. 80, No. 56 / Tuesday, March 24, 2015 / Notices
proposed 1,000-square-foot powerhouse
that contains one turbine-generator unit
with a total installed capacity of 1,440
kW; (3) an existing flow-split structure
that distributes water to either the Loma
Rica Water Treatment Plant or the
Elizabeth George Water Treatment Plant;
(4) a proposed 50-foot-long, 60-inchdiameter bypass pipe to the existing
Loma Rica Flow Control Facility for use
when the proposed project is not in
operation; and (5) appurtenant facilities.
The proposed project would have an
estimated annual generating capacity of
3,980 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
Satisfies
(Y/N)
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................................
Y
Statutory Provision
FPA 30(a)(3)(A), as amended
by HREA.
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(i), as amended
by HREA.
FPA 30(a)(3)(C)(ii), as amended
by HREA.
FPA 30(a)(3)(C)(iii), as amended by HREA.
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–20–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06628 Filed 3–23–15; 8:45 am]
1 18
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
01:09 Mar 24, 2015
BILLING CODE 6717–01–P
Jkt 235001
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Y
Y
Y
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–879–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment per
35.17(b): 2446R1 Substitute Municipal
Energy Agency of Nebraska NITSA and
NOA to be effective 12/1/2014.
Filed Date: 3/17/15.
Accession Number: 20150317–5068.
Comments Due: 5 p.m. ET 4/7/15.
Docket Numbers: ER15–1026–001.
Applicants: Utah Red Hills Renewable
Park, LLC.
Description: Tariff Amendment per
35.17(b): Amendment to Application for
Market-Based Authorization to be
effective 5/1/2015 under ER15–1026
Filing Type: 120.
Filed Date: 3/13/15.
Accession Number: 20150313–5179.
Comments Due: 5 p.m. ET 3/27/15.
Docket Numbers: ER15–1295–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Queue No. Z2–014;
Service Agreement No. 2971 to be
effective 2/13/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5210.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1296–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amended IFA and
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 80, Number 56 (Tuesday, March 24, 2015)]
[Notices]
[Pages 15591-15592]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06628]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-20-000]
Nevada Irrigation District; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On March 4, 2015, the Nevada Irrigation District filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA), as amended by section 4
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The
proposed Loma Rica Hydroelectric Station In-Conduit Hydroelectric
Project would have an installed capacity of 1,440 kilowatts (kW) and
would be located on the existing Banner-Cascade Pipeline System, which
transports water for agricultural and municipal consumption. The
project would be located near the Town of Grass Valley in Nevada
County, California.
Applicant Contact: Gary King, Engineering Manager, Nevada
Irrigation District, 1036 West Main Street, Grass Valley, CA 95945-
5424, Phone No. (530) 273-6185.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed 105-foot-long, 36-inch-
diameter pipe that connects to a proposed 30-foot-long, 24-inch-
diameter pipe that delivers water to the powerhouse; (2) a
[[Page 15592]]
proposed 1,000-square-foot powerhouse that contains one turbine-
generator unit with a total installed capacity of 1,440 kW; (3) an
existing flow-split structure that distributes water to either the Loma
Rica Water Treatment Plant or the Elizabeth George Water Treatment
Plant; (4) a proposed 50-foot-long, 60-inch-diameter bypass pipe to the
existing Loma Rica Flow Control Facility for use when the proposed
project is not in operation; and (5) appurtenant facilities. The
proposed project would have an estimated annual generating capacity of
3,980 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory Provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA............ The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for
the distribution of water for agricultural,
municipal, or industrial consumption and not
primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA......... The facility is constructed, operated, or Y
maintained for the generation of electric power
and uses for such generation only the
hydroelectric potential of a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA........ The facility has an installed capacity that does Y
not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA....... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD15-20-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: March 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06628 Filed 3-23-15; 8:45 am]