Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act, 15203 [2015-06559]
Download as PDF
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
submit brief, text-only comments on a
project;
(2) You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426.
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
Once Sunbury files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
15203
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project.
Department of Energy (DOE) pursuant to
§ 201(d) of the Powerplant and
Industrial Fuel Use Act of 1978 (FUA),
as amended, and DOE regulations in 10
CFR 501.60, 61. FUA and regulations
thereunder require DOE to publish a
notice of filing of self-certification in the
Federal Register. 42 U.S.C. 8311(d) and
10 CFR 501.61(c).
Additional Information
ADDRESSES:
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
9). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06530 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Certification Notice—232]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Filing.
AGENCY:
On March 2, 2015, NTE Ohio,
LLC, as owner and operator of a new
base load electric powerplant, submitted
a coal capability self-certification to the
SUMMARY:
PO 00000
Frm 00018
Fmt 4703
Sfmt 9990
Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
Title II of
FUA, as amended (42 U.S.C. 8301 et
seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to FUA
in order to meet the requirement of coal
capability, the owner or operator of such
a facility proposing to use natural gas or
petroleum as its primary energy source
shall certify to the Secretary of Energy
(Secretary) prior to construction, or
prior to operation as a base load electric
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. Such certification
establishes compliance with FUA
section 201(a) as of the date it is filed
with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed
new base load electric powerplant has
filed a self-certification of coalcapability with DOE pursuant to FUA
section 201(d) and in accordance with
DOE regulations in 10 CFR 501.60, 61:
Owner: NTE Ohio, LLC.
Capacity: 525 megawatts (MW).
Plant Location: Cincinnati Dayton
Road, Middletown, Ohio.
In-Service Date: As early as January
2018.
SUPPLEMENTARY INFORMATION:
Issued in Washington, DC, on March 17,
2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–06559 Filed 3–20–15; 8:45 am]
BILLING CODE 6450–01–P
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Page 15203]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06559]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Certification Notice--232]
Notice of Filing of Self-Certification of Coal Capability Under
the Powerplant and Industrial Fuel Use Act
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Filing.
-----------------------------------------------------------------------
SUMMARY: On March 2, 2015, NTE Ohio, LLC, as owner and operator of a
new base load electric powerplant, submitted a coal capability self-
certification to the Department of Energy (DOE) pursuant to Sec.
201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as
amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR
501.61(c).
ADDRESSES: Copies of coal capability self-certification filings are
available for public inspection, upon request, in the Office of
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC
20585.
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.
SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301
et seq.), provides that no new base load electric powerplant may be
constructed or operated without the capability to use coal or another
alternate fuel as a primary energy source. Pursuant to FUA in order to
meet the requirement of coal capability, the owner or operator of such
a facility proposing to use natural gas or petroleum as its primary
energy source shall certify to the Secretary of Energy (Secretary)
prior to construction, or prior to operation as a base load electric
powerplant, that such powerplant has the capability to use coal or
another alternate fuel. Such certification establishes compliance with
FUA section 201(a) as of the date it is filed with the Secretary. 42
U.S.C. 8311.
The following owner of a proposed new base load electric powerplant
has filed a self-certification of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance with DOE regulations in 10 CFR
501.60, 61:
Owner: NTE Ohio, LLC.
Capacity: 525 megawatts (MW).
Plant Location: Cincinnati Dayton Road, Middletown, Ohio.
In-Service Date: As early as January 2018.
Issued in Washington, DC, on March 17, 2015.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2015-06559 Filed 3-20-15; 8:45 am]
BILLING CODE 6450-01-P