Download as PDF Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature located on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. mstockstill on DSK4VPTVN1PROD with NOTICES Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor Once Sunbury files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 15203 the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project. Department of Energy (DOE) pursuant to § 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c). Additional Information ADDRESSES: Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF15– 9). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: March 16, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–06530 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [Certification Notice—232] Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Filing. AGENCY: On March 2, 2015, NTE Ohio, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self-certification to the SUMMARY: PO 00000 Frm 00018 Fmt 4703 Sfmt 9990 Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE–20, Room 8G–024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586– 5260. Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to FUA in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 8311. The following owner of a proposed new base load electric powerplant has filed a self-certification of coalcapability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61: Owner: NTE Ohio, LLC. Capacity: 525 megawatts (MW). Plant Location: Cincinnati Dayton Road, Middletown, Ohio. In-Service Date: As early as January 2018. SUPPLEMENTARY INFORMATION: Issued in Washington, DC, on March 17, 2015. Brian Mills, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2015–06559 Filed 3–20–15; 8:45 am] BILLING CODE 6450–01–P E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Page 15203]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06559]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--232]


Notice of Filing of Self-Certification of Coal Capability Under 
the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of Filing.

-----------------------------------------------------------------------

SUMMARY: On March 2, 2015, NTE Ohio, LLC, as owner and operator of a 
new base load electric powerplant, submitted a coal capability self-
certification to the Department of Energy (DOE) pursuant to Sec.  
201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as 
amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 
501.61(c).

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to FUA in order to 
meet the requirement of coal capability, the owner or operator of such 
a facility proposing to use natural gas or petroleum as its primary 
energy source shall certify to the Secretary of Energy (Secretary) 
prior to construction, or prior to operation as a base load electric 
powerplant, that such powerplant has the capability to use coal or 
another alternate fuel. Such certification establishes compliance with 
FUA section 201(a) as of the date it is filed with the Secretary. 42 
U.S.C. 8311.
    The following owner of a proposed new base load electric powerplant 
has filed a self-certification of coal-capability with DOE pursuant to 
FUA section 201(d) and in accordance with DOE regulations in 10 CFR 
501.60, 61:
    Owner: NTE Ohio, LLC.
    Capacity: 525 megawatts (MW).
    Plant Location: Cincinnati Dayton Road, Middletown, Ohio.
    In-Service Date: As early as January 2018.

    Issued in Washington, DC, on March 17, 2015.
Brian Mills,
 Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. 2015-06559 Filed 3-20-15; 8:45 am]
 BILLING CODE 6450-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.