Combined Notice of Filings #1, 15208-15209 [2015-06553]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 15208 Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices b. Docket No: DI15–02–000. c. Date Filed: January 16, 2015. d. Applicant: Southern Energy, Inc. e. Name of Project: Walker Lake Hydroelectric Project. f. Location: The proposed Walker Lake Hydroelectric Project would be located on Wilson Lake, near the City of Haines, in Haines Borough, Alaska. g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b) (2012). h. Applicant Contact: John Floreske, Jr., President, Southern Energy, Inc., P.O. Box 489, Mile 1.5 Haines Highway, Haines, AK 99827; telephone: (909) 766–2899; email: northern@ aptalaska.net. i. FERC Contact: Any questions on this notice should be addressed to Jennifer Polardino, (202) 502–6437, or email: Jennifer.Polardino@ferc.gov. j. Deadline for filing comments, protests, and motions to intervene is: 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, protests, and motions to intervene using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number DI15–02–000. k. Description of Project: The proposed Walker Lake Hydroelectric Project would consist of: (1) Two rockfilled 15-foot-wide dams, creating 4,300 acre-feet of usable storage capacity in Walker Lake at a normal maximum operating elevation of 1,195 feet mean sea level (msl); (2) a concrete spillway and diversion channel for controlled releases to Walker Creek; (3) a freestanding concrete intake and reservoir outlet works at elevation 1,170 feet msl diverting flow from the southeast dam into the penstock; (4) a 24-inch-diameter, 12,000-foot-long penstock, of which approximately 10,000 feet would be buried and 2,000 feet would be aboveground; (5) a powerhouse containing one generating unit rated at 1 megawatt at 780 feet of net head; (6) a 50-foot-long tailrace VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 connecting the powerhouse with the Little Salmon River; (7) an underground, 4-mile-long, 12.5 kilovolt transmission line extending from the project to a point of interconnection with Inside Passage Electric Cooperative’s power grid; and (8) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) would be located on a nonnavigable stream over which Congress has Commerce Clause jurisdiction and would be constructed or enlarged after 1935. l. Locations of the Application: This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and in the Commission’s Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must bear in all PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, and ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: March 16, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–06527 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–92–000. Applicants: American Transmission Company LLC (ATC),Consolidated Water Power Company. Description: Joint Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC, et al. Filed Date: 3/13/15. Accession Number: 20150313–5211. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: EC15–93–000. Applicants: American Transmission Company LLC (ATC). Description: Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC. Filed Date: 3/13/15. Accession Number: 20150313–5212. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: EC15–94–000. Applicants: American Transmission Company LLC (ATC). Description: Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC. E:\FR\FM\23MRN1.SGM 23MRN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices Filed Date: 3/13/15. Accession Number: 20150313–5213. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: EC15–95–000. Applicants: American Transmission Company LLC (ATC). Description: Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC. Filed Date: 3/13/15. Accession Number: 20150313–5214. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: EC15–96–000. Applicants: Osprey Energy Center, LLC, Duke Energy Florida, Inc. Description: Joint Application for Approval Under Section 203 of the Federal Power Act and Request for Shortened Comment Period of Osprey Energy Center, LLC and Duke Energy Florida, Inc. Filed Date: 3/13/15. Accession Number: 20150313–5217. Comments Due: 5 p.m. ET 4/3/15. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2543–003; ER14–1153–002; ER11–2159–004; ER10– 2609–010; ER10–2606–010; ER10–2604– 008; ER10–2602–011. Applicants: Verso Androscoggin LLC, Verso Androscoggin Power LLC, Verso Maine Energy LLC, Luke Paper Company, New Page Energy Services, Inc., Consolidated Water Power Company, Escanaba Paper Company. Description: Supplement to February 2, 2015 Notice of Non-Material Change in Status of the Verso MBR and NewPage MBR Entities. Filed Date: 3/13/15. Accession Number: 20150313–5206. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1046–005. Applicants: Kansas City Power & Light Company. Description: Tariff Amendment per 35.17(b): KCP&L Supplemental Rate Schedule 140 Filing to be effective 12/31/9998. Filed Date: 3/13/15. Accession Number: 20150313–5185. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1048–004. Applicants: KCP&L Greater Missouri Operations Company. Description: Tariff Amendment per 35.17(b): KCP&L–GMO Supplemental Rate Schedule 136 Filing to be effective 12/31/9998. Filed Date: 3/13/15. Accession Number: 20150313–5177. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1052–001. VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 Applicants: Transource Missouri, LLC. Description: Tariff Amendment per 35.17(b): TMO Facilities Sharing Agreement Concurrence Amendment to be effective 12/31/9998. Filed Date: 3/13/15. Accession Number: 20150313–5180. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1185–000. Applicants: Midcontinent Independent System Operator, Inc., American Transmission Systems, Incorporated. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–03–06_SA 766 Amended ATC–WPSC Bills of Sale to be effective 5/6/2015. Filed Date: 3/6/15. Accession Number: 20150306–5392. Comments Due: 5 p.m. ET 3/27/15. Docket Numbers: ER15–1275–000. Applicants: New York State Electric & Gas Corporation. Description: Informational Filing Detailing Refunds Paid in connection with Engineering and Procurement Agreements of New York State Electric & Gas Corporation. Filed Date: 3/12/15. Accession Number: 20150312–5156. Comments Due: 5 p.m. ET 4/2/15. Docket Numbers: ER15–1279–000. Applicants: PJM Interconnection, L.L.C., Monongahela Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Monongahela Power submits Service Agreement Nos. 4090 and 4098—HREA/Mon Power to be effective 5/12/2015. Filed Date: 3/13/15. Accession Number: 20150313–5181. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1280–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–03–13_SA 2696 ITC–IPL Amended E&P (J233) to be effective 3/5/2015. Filed Date: 3/13/15. Accession Number: 20150313–5182. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1281–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): NYISO 205 filing re: additional capacity resource interconnection service to be effective 5/ 12/2015. Filed Date: 3/13/15. Accession Number: 20150313–5184. Comments Due: 5 p.m. ET 4/3/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 15209 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 16, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–06553 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13703–002] FFP Missouri 2, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License—Existing Dam. b. Project No.: 13703–002. c. Date filed: November 13, 2013. d. Applicant: FFP Missouri 2, LLC. e. Name of Project: Enid Lake Hydroelectric Project. f. Location: The proposed project would be located at the U.S. Army Corps of Engineers’ (Corps) existing Enid Lake Dam, on the Yocona River, near the town of Oakland, in Yalobusha County, Mississippi. The proposed project would occupy approximately 30 acres of federal land administered by the Corps. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)—825(r). h. Applicant Contact: Ramya Swaminathan, Rye Development, 745 Atlantic Avenue, 8th Floor, Boston, MA 02111; telephone (617) 804–1326. i. FERC Contact: Jeanne Edwards, telephone (202) 502–6181 and email jeanne.edwards@ferc.gov; or Patti Leppert, telephone (202) 502–6034 and email patricia.leppert@ferc.gov. E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15208-15209]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06553]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC15-92-000.
    Applicants: American Transmission Company LLC (ATC),Consolidated 
Water Power Company.
    Description: Joint Application for Authority to Acquire 
Transmission Facilities Under Section 203 of the FPA of American 
Transmission Company LLC, et al.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5211.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: EC15-93-000.
    Applicants: American Transmission Company LLC (ATC).
    Description: Application for Authority to Acquire Transmission 
Facilities Under Section 203 of the FPA of American Transmission 
Company LLC.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5212.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: EC15-94-000.
    Applicants: American Transmission Company LLC (ATC).
    Description: Application for Authority to Acquire Transmission 
Facilities Under Section 203 of the FPA of American Transmission 
Company LLC.

[[Page 15209]]

    Filed Date: 3/13/15.
    Accession Number: 20150313-5213.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: EC15-95-000.
    Applicants: American Transmission Company LLC (ATC).
    Description: Application for Authority to Acquire Transmission 
Facilities Under Section 203 of the FPA of American Transmission 
Company LLC.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5214.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: EC15-96-000.
    Applicants: Osprey Energy Center, LLC, Duke Energy Florida, Inc.
    Description: Joint Application for Approval Under Section 203 of 
the Federal Power Act and Request for Shortened Comment Period of 
Osprey Energy Center, LLC and Duke Energy Florida, Inc.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5217.
    Comments Due: 5 p.m. ET 4/3/15.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2543-003; ER14-1153-002; ER11-2159-004; ER10-
2609-010; ER10-2606-010; ER10-2604-008; ER10-2602-011.
    Applicants: Verso Androscoggin LLC, Verso Androscoggin Power LLC, 
Verso Maine Energy LLC, Luke Paper Company, New Page Energy Services, 
Inc., Consolidated Water Power Company, Escanaba Paper Company.
    Description: Supplement to February 2, 2015 Notice of Non-Material 
Change in Status of the Verso MBR and NewPage MBR Entities.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5206.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: ER15-1046-005.
    Applicants: Kansas City Power & Light Company.
    Description: Tariff Amendment per 35.17(b): KCP&L Supplemental Rate 
Schedule 140 Filing to be effective 12/31/9998.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5185.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: ER15-1048-004.
    Applicants: KCP&L Greater Missouri Operations Company.
    Description: Tariff Amendment per 35.17(b): KCP&L-GMO Supplemental 
Rate Schedule 136 Filing to be effective 12/31/9998.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5177.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: ER15-1052-001.
    Applicants: Transource Missouri, LLC.
    Description: Tariff Amendment per 35.17(b): TMO Facilities Sharing 
Agreement Concurrence Amendment to be effective 12/31/9998.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5180.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: ER15-1185-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
American Transmission Systems, Incorporated.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): 2015-
03-06_SA 766 Amended ATC-WPSC Bills of Sale to be effective 5/6/2015.
    Filed Date: 3/6/15.
    Accession Number: 20150306-5392.
    Comments Due: 5 p.m. ET 3/27/15.

    Docket Numbers: ER15-1275-000.
    Applicants: New York State Electric & Gas Corporation.
    Description: Informational Filing Detailing Refunds Paid in 
connection with Engineering and Procurement Agreements of New York 
State Electric & Gas Corporation.
    Filed Date: 3/12/15.
    Accession Number: 20150312-5156.
    Comments Due: 5 p.m. ET 4/2/15.

    Docket Numbers: ER15-1279-000.
    Applicants: PJM Interconnection, L.L.C., Monongahela Power Company.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): 
Monongahela Power submits Service Agreement Nos. 4090 and 4098--HREA/
Mon Power to be effective 5/12/2015.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5181.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: ER15-1280-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): 2015-
03-13_SA 2696 ITC-IPL Amended E&P (J233) to be effective 3/5/2015.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5182.
    Comments Due: 5 p.m. ET 4/3/15.

    Docket Numbers: ER15-1281-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Sec.  205(d) rate filing per 35.13(a)(2)(iii): NYISO 
205 filing re: additional capacity resource interconnection service to 
be effective 5/12/2015.
    Filed Date: 3/13/15.
    Accession Number: 20150313-5184.
    Comments Due: 5 p.m. ET 4/3/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-06553 Filed 3-20-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.