New Hampshire Hydro Associates; Rivermill Hydroelectric, Inc.; Notice of Transfer of Exemption, 15198-15199 [2015-06531]
Download as PDF
15198
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On June 9, 2010, DOE issued Order
No. EA–185–C to the applicant, which
authorized MSCG to transmit electric
energy from the United States to Canada
as a power marketer for a five-year term
using existing international
transmission facilities. That authority
expires on August 21, 2015. On March
2, 2015, the Applicant filed an
application with DOE for renewal of the
export authority contained in Order No.
EA–185–C for an additional five-year
term.
In its application, the Applicant states
that it does not own or operate any
Dated: March 17, 2015.
electric generation or transmission
Kate Mullan,
facilities, and it does not have a
franchised service area. The electric
Acting Director, Information Collection
Clearance Division, Privacy, Information and
energy that the Applicant proposes to
Records Management Services, Office of
export to Canada would be surplus
Management.
energy purchased from third parties
[FR Doc. 2015–06467 Filed 3–20–15; 8:45 am]
such as electric utilities and Federal
BILLING CODE 4000–01–P
power marketing agencies pursuant to
voluntary agreements. The existing
international transmission facilities to
be utilized by the Applicant have
DEPARTMENT OF ENERGY
previously been authorized by
[OE Docket No. EA–185–D]
Presidential permits issued pursuant to
Application To Export Electric Energy; Executive Order 10485, as amended,
and are appropriate for open access
Morgan Stanley Capital Group Inc.
transmission by third parties.
AGENCY: Office of Electricity Delivery
Procedural Matters: Any person
and Energy Reliability, DOE.
desiring to be heard in this proceeding
ACTION: Notice of Application.
should file a comment or protest to the
application at the address provided
SUMMARY: Morgan Stanley Capital Group above. Protests should be filed in
Inc. (Applicant or MSCG) has applied to accordance with Rule 211 of the Federal
renew its authority to transmit electric
Energy Regulatory Commission’s (FERC)
energy from the United States to Canada Rules of Practice and Procedures (18
pursuant to section 202(e) of the Federal CFR 385.211). Any person desiring to
Power Act.
become a party to these proceedings
DATES: Comments, protests, or motions
should file a motion to intervene at the
to intervene must be submitted on or
above address in accordance with FERC
before April 22, 2015.
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
ADDRESSES: Comments, protests,
to intervene should be sent to the
motions to intervene, or requests for
address provided above on or before the
more information should be addressed
date listed above.
to: Office of Electricity Delivery and
Comments and other filings
Energy Reliability, Mail Code: OE–20,
concerning the MSCG’s application to
U.S. Department of Energy, 1000
export electric energy to Canada should
Independence Avenue SW.,
be clearly marked with OE Docket No.
Washington, DC 20585–0350. Because
mstockstill on DSK4VPTVN1PROD with NOTICES
Origination and Disbursement (COD)
System.
OMB Control Number: 1845–0039.
Type of Review: An extension of an
existing information collection.
Respondents/Affected Public: Private
Sector, State, Local and Tribal
Governments.
Total Estimated Number of Annual
Responses: 8,488,842.
Total Estimated Number of Annual
Burden Hours: 594,219.
Abstract: The Federal Pell Grant
program is a student financial assistance
program authorized under the Higher
Education Act of 1965, as amended. The
program provides grant assistance to an
eligible student attending an institution
of higher education. The institution
determines the student’s award and
disburses program funds on behalf of
the Department of Education (ED).
Institutions are required to report
student Pell Grant payment information
to ED electronically. Electronic
reporting is conducted through the
Common Origination and Disbursement
(COD) system. The COD system is used
by institutions to request, report and
reconcile grant funds received from the
Pell Grant program.
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
EA–185–D. An additional copy is to be
provided directly to both Edward J.
Zabrocki, Morgan Stanley & Co. LLC,
2000 Westchester Ave., 1st Floor,
Purchase, NY 10577 and Daniel E.
Frank, Sutherland Asbill & Brennan
LLP, 700 Sixth Street NW., Suite 700,
Washington, DC 20001.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after a determination is
made by DOE that the proposed action
will not have an adverse impact on the
sufficiency of supply or reliability of the
U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on March 17,
2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–06562 Filed 3–20–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9403–008]
New Hampshire Hydro Associates;
Rivermill Hydroelectric, Inc.; Notice of
Transfer of Exemption
1. By letter filed March 10, 2015, New
Hampshire Hydro Associates informed
the Commission that the exemption
from licensing for the HDI Mascoma
Dam Project, FERC No. 9403, originally
issued September 21, 1988,1 has been
transferred to Rivermill Hydroelectric,
Inc. The project is located on the
Mascoma River in Grafton County, New
Hampshire. The transfer of an
exemption does not require Commission
approval.
2. Rivermill Hydroelectric, Inc. is now
the exemptee of the HDI Mascoma Dam
Project, FERC No. 9403. All
correspondence should be forwarded to:
Michael Hansen, Rivermill
Hydroelectric, Inc., 44 Deer Ridge Drive,
Barrington, NH 03825.
1 44 FERC ¶ 62,273, Order Granting Exemption
from Licensing (5 MW or Less) (1988).
E:\FR\FM\23MRN1.SGM
23MRN1
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
[FR Doc. 2015–06531 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Dated: March 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–06555 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP15–645–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Compliance filing per
154.203: Order No. 801 (maps on
interactive Web site) to be effective 4/1/
2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5171.
Comments Due: 5 p.m. ET 3/25/15.
Docket Numbers: RP15–646–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) rate filing per
154.204: PAL Negotiated Rate
Agreement—Koch Energy Services, LLC
to be effective 3/13/2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5172.
Comments Due: 5 p.m. ET 3/25/15.
Docket Numbers: RP15–647–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Compliance filing per
154.203: Order No. 801 (Maps on the
Interactive Web site) to be effective
4/1/2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5174.
Comments Due: 5 p.m. ET 3/25/15.
Docket Numbers: RP15–648–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Compliance filing per
154.203: Order No. 801 (Maps on the
Interactive Web site) to be effective
4/1/2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5175.
Comments Due: 5 p.m. ET 3/25/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI15–03–000]
Kenneth & Susan Egnaczak; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and Motions To
Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI15–03–000.
c. Date Filed: February 23, 2015.
d. Applicant: Kenneth & Susan
Egnaczak.
e. Name of Project: Egnaczak Net Zero
Hydropower Project.
f. Location: The proposed Net Zero
Hydropower Project will be located on
the Hoosic River, in the town of
Cheshire, Berkshire County,
Massachusetts.
g. Filed Pursuant to: section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: Kenneth &
Susan Egnaczak, 1211 Windsor Road,
Cheshire, MA 01225; telephone: (413)
743–9497, email address: ksegnaczak@
msn.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
email address: Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
protests, and/or motions is: 30 days
from the issuance date of this notice by
the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
15199
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number DI15–03–000.
k. Description of Project: The
proposed run-of-river Egnaczak Net
Zero Hydropower Project would consist
of existing and new facilities that would
provide electricity to the applicant’s
home and workshop. The existing
facilities consist of: (1) An 8-foot-high,
60-foot-wide stone dam at the outlet of
the Hoosic River; (2) an existing 600foot-long headrace; and (3) two
manually operated headgates adjacent to
the dam. The new facilities would
consist of: (1) Two 50-foot-long
penstocks between the headrace and
two separate powerhouses; (2) a
powerhouse containing a 3.4-kilowatt
(kW) generating unit with a rated head
of 12 feet and a hydraulic capacity of 5.2
cubic feet per second (cfs); (3) a second
powerhouse containing a 7.3-kW
generating unit with a rated head of 20
feet and a hydraulic capacity of 6.7 cfs;
and (4) appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15198-15199]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06531]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9403-008]
New Hampshire Hydro Associates; Rivermill Hydroelectric, Inc.;
Notice of Transfer of Exemption
1. By letter filed March 10, 2015, New Hampshire Hydro Associates
informed the Commission that the exemption from licensing for the HDI
Mascoma Dam Project, FERC No. 9403, originally issued September 21,
1988,\1\ has been transferred to Rivermill Hydroelectric, Inc. The
project is located on the Mascoma River in Grafton County, New
Hampshire. The transfer of an exemption does not require Commission
approval.
---------------------------------------------------------------------------
\1\ 44 FERC ] 62,273, Order Granting Exemption from Licensing (5
MW or Less) (1988).
---------------------------------------------------------------------------
2. Rivermill Hydroelectric, Inc. is now the exemptee of the HDI
Mascoma Dam Project, FERC No. 9403. All correspondence should be
forwarded to: Michael Hansen, Rivermill Hydroelectric, Inc., 44 Deer
Ridge Drive, Barrington, NH 03825.
[[Page 15199]]
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06531 Filed 3-20-15; 8:45 am]