UGI Sunbury, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunbury Pipeline Project and Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting, 15201-15203 [2015-06530]
Download as PDF
15201
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
All filings must: (1) Bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
n. Procedural Schedule:
The application will be processed
according to the following revised hydro
licensing schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Filing of recommendations,
terms and conditions, and
prescriptions.
Commission issues Draft EA
mstockstill on DSK4VPTVN1PROD with NOTICES
Comments on Draft EA Due
Commission Issues Final EA
Target date
May 2015.
December
2015.
January 2016.
May 2016.
o. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06526 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–402–001; Docket No.
ER15–817–000; Docket No. ER15–861–000]
California Independent System
Operator Corporation; Notice of FERC
Staff Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that on March 18, 2015 members
of its staff will attend the California
Independent System Operator’s (CAISO)
Market Performance and Planning
Forum. The agenda and other
documents for the meeting are available
on CAISO’s Web site, www.caiso.com.
Sponsored by CAISO, the meeting is
open to all market participants and
staff’s attendance is part of the
Commission’s ongoing outreach efforts.
The meeting may discuss matters at
issue in the above captioned dockets.
For further information, contact Saeed
Farrokhpay at saeed.farrokhpay@
ferc.gov (916) 294–0322.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06529 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF15–9–000]
UGI Sunbury, LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Planned Sunbury Pipeline
Project and Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meeting
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Sunbury Pipeline Project (Project)
involving the construction and
operation of approximately 34.5 miles of
20-inch diameter pipeline and related
facilities by UGI Sunbury, LLC
(Sunbury) in Snyder, Union,
Northumberland, Montour, and
Lycoming Counties, Pennsylvania. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on April 17,
2015.
You may submit comments in written
form or verbally. Further details on how
to submit written comments are in the
Public Participation section of this
notice. If you sent comments on this
project to the Commission before the
opening of this docket on December 30,
2014, you will need to file those
comments in Docket No. PF15–9–000 to
ensure they are considered as part of
this proceeding. In lieu of or in addition
to sending written comments, the
Commission invites you to attend the
public scoping meeting scheduled as
follows:
Date and time
April 7, 2015,
6:00 p.m.
(Eastern
Time).
Location
James F. Baugher Elementary School, All Purpose
Room, 60 Brenda
Rovenolt Circle, Milton, PA
17847.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
Summary of the Planned Project
Sunbury plans to construct, own, and
operate a new natural gas pipeline
extending from Lycoming County,
Pennsylvania to a gas-fired power plant,
E:\FR\FM\23MRN1.SGM
23MRN1
15202
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
Hummel Station LLC (Hummel), at the
existing site of coal-fired Sunbury
Generation LP facility near Shamokin
Dam, in Snyder County, Pennsylvania.
Hummel is planning to construct the
power plant at the existing site of the
coal-fired facility near Shamokin Dam.
The project has a planned capacity to
transport approximately 200,000
dekatherms of natural gas per day.
The Sunbury Pipeline Project would
consist of the following facilities:
• One new 34.5-mile, 20-inchdiameter pipeline; and
• associated aboveground facilities
consisting of two new mainline vales,
four meter stations, and two launcher
and receivers.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the planned pipeline
would disturb about 488 acres of land.
Land disturbance for the planned above
ground facilities would encompass an
area of 3.7 acres, which would be
reduced to 2.1 acres for operation of
these facilities. Following construction,
Sunbury would maintain about 209
acres for permanent operation of the
project’s pipeline facilities, and 2.1
acres for the above ground facilities. The
remaining 279 acres would be used for
temporary construction workspace and
be restored and to former uses.
mstockstill on DSK4VPTVN1PROD with NOTICES
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife, including
migratory birds;
• air quality and noise;
• endangered and threatened species;
• socioeconomics;
• public safety; and
• cumulative impacts.
We will also evaluate possible
alternatives to the planned project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. The purpose of the
pre-filing process is to encourage early
involvement of interested stakeholders
and to identify and resolve issues before
the FERC receives an application. As
part of our pre-filing review, we
participated in public Open House
meetings sponsored by Sunbury in the
project area on February 24th and
February 25th to explain the
environmental review process to
interested stakeholders. Also, we have
begun to contact some federal and state
agencies to discuss their involvement in
the scoping process and the preparation
of the EA.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues related to this
project to formally cooperate with us in
the preparation of the EA.3 Agencies
that would like to request cooperating
agency status should follow the
instructions for filing comments
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at title 40, Code of Federal
Regulations, part 1501.6.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
Pennsylvania State Historic Preservation
Office, and to solicit their views and
those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before April 17,
2015.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket number (PF15–9–000) with your
submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
Web site (www.ferc.gov) under the link
to Documents and Filings. This is an
easy method for interested persons to
4 The Advisory Council on Historic Preservation
regulations are at title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\23MRN1.SGM
23MRN1
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
submit brief, text-only comments on a
project;
(2) You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426.
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
Once Sunbury files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
15203
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project.
Department of Energy (DOE) pursuant to
§ 201(d) of the Powerplant and
Industrial Fuel Use Act of 1978 (FUA),
as amended, and DOE regulations in 10
CFR 501.60, 61. FUA and regulations
thereunder require DOE to publish a
notice of filing of self-certification in the
Federal Register. 42 U.S.C. 8311(d) and
10 CFR 501.61(c).
Additional Information
ADDRESSES:
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
9). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06530 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Certification Notice—232]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Filing.
AGENCY:
On March 2, 2015, NTE Ohio,
LLC, as owner and operator of a new
base load electric powerplant, submitted
a coal capability self-certification to the
SUMMARY:
PO 00000
Frm 00018
Fmt 4703
Sfmt 9990
Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
Title II of
FUA, as amended (42 U.S.C. 8301 et
seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to FUA
in order to meet the requirement of coal
capability, the owner or operator of such
a facility proposing to use natural gas or
petroleum as its primary energy source
shall certify to the Secretary of Energy
(Secretary) prior to construction, or
prior to operation as a base load electric
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. Such certification
establishes compliance with FUA
section 201(a) as of the date it is filed
with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed
new base load electric powerplant has
filed a self-certification of coalcapability with DOE pursuant to FUA
section 201(d) and in accordance with
DOE regulations in 10 CFR 501.60, 61:
Owner: NTE Ohio, LLC.
Capacity: 525 megawatts (MW).
Plant Location: Cincinnati Dayton
Road, Middletown, Ohio.
In-Service Date: As early as January
2018.
SUPPLEMENTARY INFORMATION:
Issued in Washington, DC, on March 17,
2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–06559 Filed 3–20–15; 8:45 am]
BILLING CODE 6450–01–P
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15201-15203]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06530]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF15-9-000]
UGI Sunbury, LLC; Notice of Intent To Prepare an Environmental
Assessment for the Planned Sunbury Pipeline Project and Request for
Comments on Environmental Issues, and Notice of Public Scoping Meeting
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Sunbury Pipeline Project
(Project) involving the construction and operation of approximately
34.5 miles of 20-inch diameter pipeline and related facilities by UGI
Sunbury, LLC (Sunbury) in Snyder, Union, Northumberland, Montour, and
Lycoming Counties, Pennsylvania. The Commission will use this EA in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on April 17, 2015.
You may submit comments in written form or verbally. Further
details on how to submit written comments are in the Public
Participation section of this notice. If you sent comments on this
project to the Commission before the opening of this docket on December
30, 2014, you will need to file those comments in Docket No. PF15-9-000
to ensure they are considered as part of this proceeding. In lieu of or
in addition to sending written comments, the Commission invites you to
attend the public scoping meeting scheduled as follows:
------------------------------------------------------------------------
Date and time Location
------------------------------------------------------------------------
April 7, 2015, 6:00 p.m. (Eastern Time) James F. Baugher Elementary
School, All Purpose Room, 60
Brenda Rovenolt Circle,
Milton, PA 17847.
------------------------------------------------------------------------
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this planned
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the planned facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
Summary of the Planned Project
Sunbury plans to construct, own, and operate a new natural gas
pipeline extending from Lycoming County, Pennsylvania to a gas-fired
power plant,
[[Page 15202]]
Hummel Station LLC (Hummel), at the existing site of coal-fired Sunbury
Generation LP facility near Shamokin Dam, in Snyder County,
Pennsylvania. Hummel is planning to construct the power plant at the
existing site of the coal-fired facility near Shamokin Dam. The project
has a planned capacity to transport approximately 200,000 dekatherms of
natural gas per day.
The Sunbury Pipeline Project would consist of the following
facilities:
One new 34.5-mile, 20-inch-diameter pipeline; and
associated aboveground facilities consisting of two new
mainline vales, four meter stations, and two launcher and receivers.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned pipeline would disturb about 488 acres
of land. Land disturbance for the planned above ground facilities would
encompass an area of 3.7 acres, which would be reduced to 2.1 acres for
operation of these facilities. Following construction, Sunbury would
maintain about 209 acres for permanent operation of the project's
pipeline facilities, and 2.1 acres for the above ground facilities. The
remaining 279 acres would be used for temporary construction workspace
and be restored and to former uses.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the planned project under these
general headings:
Geology and soils;
land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife, including migratory birds;
air quality and noise;
endangered and threatened species;
socioeconomics;
public safety; and
cumulative impacts.
We will also evaluate possible alternatives to the planned project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process.
The purpose of the pre-filing process is to encourage early involvement
of interested stakeholders and to identify and resolve issues before
the FERC receives an application. As part of our pre-filing review, we
participated in public Open House meetings sponsored by Sunbury in the
project area on February 24th and February 25th to explain the
environmental review process to interested stakeholders. Also, we have
begun to contact some federal and state agencies to discuss their
involvement in the scoping process and the preparation of the EA.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before we make our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues
related to this project to formally cooperate with us in the
preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at title 40, Code of Federal
Regulations, part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the Pennsylvania State Historic Preservation Office, and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\4\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation regulations
are at title 36, Code of Federal Regulations, part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before April
17, 2015.
For your convenience, there are three methods you can use to submit
your comments to the Commission. In all instances, please reference the
project docket number (PF15-9-000) with your submission. The Commission
encourages electronic filing of comments and has expert staff available
to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature located on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. This is an easy method for interested
persons to
[[Page 15203]]
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature located on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
Once Sunbury files its application with the Commission, you may
want to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site. Please note that the Commission will not accept requests for
intervenor status at this time. You must wait until the Commission
receives a formal application for the project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., PF15-
9). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06530 Filed 3-20-15; 8:45 am]
BILLING CODE 6717-01-P