Southern Energy, Inc.; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene, 15207-15208 [2015-06527]

Download as PDF Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. n. Procedural Schedule: The application will be processed according to the following revised hydro licensing schedule. Revisions to the schedule may be made as appropriate. Milestone Filing of recommendations, terms and conditions, and prescriptions. Commission issues Draft EA Comments on Draft EA Due Commission Issues Final EA Target date May 2015. December 2015. January 2016. May 2016. o. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. Dated: March 16, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–06523 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–929–002. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment per 35.17(b): Motion for Deferral in OMPA Revised Stated Rate—ER15–929 to be effective 12/31/9998. Filed Date: 3/13/15. Accession Number: 20150313–5176. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1282–000. Applicants: NorthWestern Corporation. VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 Description: § 205(d) rate filing per 35.13(a)(2)(iii): SA 28–SD First Revised—LGIA with Beethoven Wind LLC to be effective 3/17/2015. Filed Date: 3/16/15. Accession Number: 20150316–5077. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1283–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): SWEPCO-Hope PSA Amendment to be effective 1/1/2015. Filed Date: 3/16/15. Accession Number: 20150316–5143. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1287–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): First Revised Service Agreement No. 3669; Queue Nos. Y3– 046, Y3–051, Z1–058 . . . to be effective 2/13/2015. Filed Date: 3/16/15. Accession Number: 20150316–5159. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1289–000. Applicants: Midcontinent Independent System Operator, Inc., Great River Energy. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–03–16_GRE RTO Adder Filing to be effective 1/6/2015. Filed Date: 3/16/15. Accession Number: 20150316–5163. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1290–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): First Revised Service Agreement No. 2775; Queue Nos. Y3– 045, Y3–052, Y3–107 to be effective 2/13/2015. Filed Date: 3/16/15. Accession Number: 20150316–5168. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1291–000. Applicants: Public Service Company of Colorado. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–3–16_PSC–PLND– A&R ISA 110–0.0.0-Agrmt to be effective 3/17/2015. Filed Date: 3/16/15. Accession Number: 20150316–5173. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1292–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): First Revised Service Agreement No. 2181; Queue No. V4–045 to be effective 2/12/2015. Filed Date: 3/16/15. Accession Number: 20150316–5176. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 15207 Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1293–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Revisions to Attachment AE Sections 4.5.2 and 4.5.3 to be effective 5/15/2015. Filed Date: 3/16/15. Accession Number: 20150316–5187. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1294–000. Applicants: Pacific Gas and Electric Company. Description: Pacific Gas and Electric Company submits Notice of Termination of Agreement with the City of Los Angeles Department of Water and Power, Rate Schedule No. 131. Filed Date: 3/16/15. Accession Number: 20150316–5188. Comments Due: 5 p.m. ET 4/6/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 16, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–06554 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI15–02–000] Southern Energy, Inc.; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. E:\FR\FM\23MRN1.SGM 23MRN1 mstockstill on DSK4VPTVN1PROD with NOTICES 15208 Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices b. Docket No: DI15–02–000. c. Date Filed: January 16, 2015. d. Applicant: Southern Energy, Inc. e. Name of Project: Walker Lake Hydroelectric Project. f. Location: The proposed Walker Lake Hydroelectric Project would be located on Wilson Lake, near the City of Haines, in Haines Borough, Alaska. g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b) (2012). h. Applicant Contact: John Floreske, Jr., President, Southern Energy, Inc., P.O. Box 489, Mile 1.5 Haines Highway, Haines, AK 99827; telephone: (909) 766–2899; email: northern@ aptalaska.net. i. FERC Contact: Any questions on this notice should be addressed to Jennifer Polardino, (202) 502–6437, or email: Jennifer.Polardino@ferc.gov. j. Deadline for filing comments, protests, and motions to intervene is: 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, protests, and motions to intervene using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number DI15–02–000. k. Description of Project: The proposed Walker Lake Hydroelectric Project would consist of: (1) Two rockfilled 15-foot-wide dams, creating 4,300 acre-feet of usable storage capacity in Walker Lake at a normal maximum operating elevation of 1,195 feet mean sea level (msl); (2) a concrete spillway and diversion channel for controlled releases to Walker Creek; (3) a freestanding concrete intake and reservoir outlet works at elevation 1,170 feet msl diverting flow from the southeast dam into the penstock; (4) a 24-inch-diameter, 12,000-foot-long penstock, of which approximately 10,000 feet would be buried and 2,000 feet would be aboveground; (5) a powerhouse containing one generating unit rated at 1 megawatt at 780 feet of net head; (6) a 50-foot-long tailrace VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 connecting the powerhouse with the Little Salmon River; (7) an underground, 4-mile-long, 12.5 kilovolt transmission line extending from the project to a point of interconnection with Inside Passage Electric Cooperative’s power grid; and (8) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) would be located on a nonnavigable stream over which Congress has Commerce Clause jurisdiction and would be constructed or enlarged after 1935. l. Locations of the Application: This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and in the Commission’s Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must bear in all PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, and ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: March 16, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–06527 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–92–000. Applicants: American Transmission Company LLC (ATC),Consolidated Water Power Company. Description: Joint Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC, et al. Filed Date: 3/13/15. Accession Number: 20150313–5211. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: EC15–93–000. Applicants: American Transmission Company LLC (ATC). Description: Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC. Filed Date: 3/13/15. Accession Number: 20150313–5212. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: EC15–94–000. Applicants: American Transmission Company LLC (ATC). Description: Application for Authority to Acquire Transmission Facilities Under Section 203 of the FPA of American Transmission Company LLC. E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15207-15208]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06527]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI15-02-000]


Southern Energy, Inc.; Notice of Declaration of Intention and 
Soliciting Comments, Protests, and Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention.

[[Page 15208]]

    b. Docket No: DI15-02-000.
    c. Date Filed: January 16, 2015.
    d. Applicant: Southern Energy, Inc.
    e. Name of Project: Walker Lake Hydroelectric Project.
    f. Location: The proposed Walker Lake Hydroelectric Project would 
be located on Wilson Lake, near the City of Haines, in Haines Borough, 
Alaska.
    g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b) (2012).
    h. Applicant Contact: John Floreske, Jr., President, Southern 
Energy, Inc., P.O. Box 489, Mile 1.5 Haines Highway, Haines, AK 99827; 
telephone: (909) 766-2899; email: northern@aptalaska.net.
    i. FERC Contact: Any questions on this notice should be addressed 
to Jennifer Polardino, (202) 502-6437, or email: 
Jennifer.Polardino@ferc.gov.
    j. Deadline for filing comments, protests, and motions to intervene 
is: 30 days from the issuance date of this notice by the Commission.
    The Commission strongly encourages electronic filing. Please file 
comments, protests, and motions to intervene using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number DI15-02-000.
    k. Description of Project: The proposed Walker Lake Hydroelectric 
Project would consist of: (1) Two rockfilled 15-foot-wide dams, 
creating 4,300 acre-feet of usable storage capacity in Walker Lake at a 
normal maximum operating elevation of 1,195 feet mean sea level (msl); 
(2) a concrete spillway and diversion channel for controlled releases 
to Walker Creek; (3) a freestanding concrete intake and reservoir 
outlet works at elevation 1,170 feet msl diverting flow from the 
southeast dam into the penstock; (4) a 24-inch-diameter, 12,000-foot-
long penstock, of which approximately 10,000 feet would be buried and 
2,000 feet would be aboveground; (5) a powerhouse containing one 
generating unit rated at 1 megawatt at 780 feet of net head; (6) a 50-
foot-long tailrace connecting the powerhouse with the Little Salmon 
River; (7) an underground, 4-mile-long, 12.5 kilovolt transmission line 
extending from the project to a point of interconnection with Inside 
Passage Electric Cooperative's power grid; and (8) appurtenant 
facilities.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the project would affect the interests of 
interstate or foreign commerce. The Commission also determines whether 
or not the project: (1) Would be located on a navigable waterway; (2) 
would occupy public lands or reservations of the United States; (3) 
would utilize surplus water or water power from a government dam; or 
(4) would be located on a non-navigable stream over which Congress has 
Commerce Clause jurisdiction and would be constructed or enlarged after 
1935.
    l. Locations of the Application: This filing may be viewed on the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. You may also register online at 
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above and in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', and 
``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of the 
particular application to which the filing refers. A copy of any Motion 
to Intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

    Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06527 Filed 3-20-15; 8:45 am]
BILLING CODE 6717-01-P