FFP Missouri 2, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 15209-15210 [2015-06525]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
Filed Date: 3/13/15.
Accession Number: 20150313–5213.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: EC15–95–000.
Applicants: American Transmission
Company LLC (ATC).
Description: Application for
Authority to Acquire Transmission
Facilities Under Section 203 of the FPA
of American Transmission Company
LLC.
Filed Date: 3/13/15.
Accession Number: 20150313–5214.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: EC15–96–000.
Applicants: Osprey Energy Center,
LLC, Duke Energy Florida, Inc.
Description: Joint Application for
Approval Under Section 203 of the
Federal Power Act and Request for
Shortened Comment Period of Osprey
Energy Center, LLC and Duke Energy
Florida, Inc.
Filed Date: 3/13/15.
Accession Number: 20150313–5217.
Comments Due: 5 p.m. ET 4/3/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2543–003;
ER14–1153–002; ER11–2159–004; ER10–
2609–010; ER10–2606–010; ER10–2604–
008; ER10–2602–011.
Applicants: Verso Androscoggin LLC,
Verso Androscoggin Power LLC, Verso
Maine Energy LLC, Luke Paper
Company, New Page Energy Services,
Inc., Consolidated Water Power
Company, Escanaba Paper Company.
Description: Supplement to February
2, 2015 Notice of Non-Material Change
in Status of the Verso MBR and
NewPage MBR Entities.
Filed Date: 3/13/15.
Accession Number: 20150313–5206.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1046–005.
Applicants: Kansas City Power &
Light Company.
Description: Tariff Amendment per
35.17(b): KCP&L Supplemental Rate
Schedule 140 Filing to be effective
12/31/9998.
Filed Date: 3/13/15.
Accession Number: 20150313–5185.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1048–004.
Applicants: KCP&L Greater Missouri
Operations Company.
Description: Tariff Amendment per
35.17(b): KCP&L–GMO Supplemental
Rate Schedule 136 Filing to be effective
12/31/9998.
Filed Date: 3/13/15.
Accession Number: 20150313–5177.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1052–001.
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
Applicants: Transource Missouri,
LLC.
Description: Tariff Amendment per
35.17(b): TMO Facilities Sharing
Agreement Concurrence Amendment to
be effective 12/31/9998.
Filed Date: 3/13/15.
Accession Number: 20150313–5180.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1185–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Systems,
Incorporated.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–03–06_SA 766
Amended ATC–WPSC Bills of Sale to be
effective 5/6/2015.
Filed Date: 3/6/15.
Accession Number: 20150306–5392.
Comments Due: 5 p.m. ET 3/27/15.
Docket Numbers: ER15–1275–000.
Applicants: New York State Electric &
Gas Corporation.
Description: Informational Filing
Detailing Refunds Paid in connection
with Engineering and Procurement
Agreements of New York State Electric
& Gas Corporation.
Filed Date: 3/12/15.
Accession Number: 20150312–5156.
Comments Due: 5 p.m. ET 4/2/15.
Docket Numbers: ER15–1279–000.
Applicants: PJM Interconnection,
L.L.C., Monongahela Power Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Monongahela Power
submits Service Agreement Nos. 4090
and 4098—HREA/Mon Power to be
effective 5/12/2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5181.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1280–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–03–13_SA 2696
ITC–IPL Amended E&P (J233) to be
effective 3/5/2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5182.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1281–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): NYISO 205 filing re:
additional capacity resource
interconnection service to be effective 5/
12/2015.
Filed Date: 3/13/15.
Accession Number: 20150313–5184.
Comments Due: 5 p.m. ET 4/3/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
15209
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–06553 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13703–002]
FFP Missouri 2, LLC; Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License—Existing Dam.
b. Project No.: 13703–002.
c. Date filed: November 13, 2013.
d. Applicant: FFP Missouri 2, LLC.
e. Name of Project: Enid Lake
Hydroelectric Project.
f. Location: The proposed project
would be located at the U.S. Army
Corps of Engineers’ (Corps) existing
Enid Lake Dam, on the Yocona River,
near the town of Oakland, in Yalobusha
County, Mississippi. The proposed
project would occupy approximately 30
acres of federal land administered by
the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Ramya
Swaminathan, Rye Development, 745
Atlantic Avenue, 8th Floor, Boston, MA
02111; telephone (617) 804–1326.
i. FERC Contact: Jeanne Edwards,
telephone (202) 502–6181 and email
jeanne.edwards@ferc.gov; or Patti
Leppert, telephone (202) 502–6034 and
email patricia.leppert@ferc.gov.
E:\FR\FM\23MRN1.SGM
23MRN1
mstockstill on DSK4VPTVN1PROD with NOTICES
15210
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
j. Deadline for filing comments,
recommendations, preliminary terms
and conditions, and prescriptions: 60
days from the issuance date of this
notice; reply comments are due 105
days from the issuance date of this
notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13703–002.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The proposed Enid Lake Project
would utilize the following existing
Corps’ Enid Lake Dam facilities: (1) An
8,400-foot-long, 85-foot-high earth fill
embankment dam; (2) a reservoir; and
(3) outlet works consisting of a concrete
intake tower, two gated inlets that
combine to direct flow through two 370foot-long, 11-foot-diameter concrete
outlet conduits, and a stilling basin.
The proposed Enid Lake Project
would consist of the following new
facilities: (1) A 320-foot-long, 10.25-footdiameter steel liner installed within one
of the two existing outlet conduits; (2)
a 50-foot-long, 20-foot-wide (varies)
steel-lined, concrete bifurcation
chamber containing two hydraulicallyoperated gates used to control the
amount of flow diverted from the
existing stilling basin to the
powerhouse; (3) a 240-foot-long, 10-footdiameter steel penstock; (4) a 55-foot
wide, 50-foot-long, 100-foot-high steel
and reinforced concrete forebay housing
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
trashracks and a fish bypass gate; (5) an
80-foot-long, 50-foot-wide concrete
powerhouse containing two vertical
Kaplan turbine-generator units having a
combined installed capacity of 4.6
megawatts; (6) a 150-foot-long, 75-footwide tailrace; (7) a 181-foot-long, 4.16kilovolt (kV) buried cable; (8) a
substation; and (9) a 2,036-foot-long,
12.5-kV overhead transmission line
extending from the substation to a
utility-owned distribution line. The
average annual generation would be
17,700 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
All filings must: (1) Bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
n. Procedural Schedule:
The application will be processed
according to the following revised hydro
licensing schedule. Revisions to the
schedule may be made as appropriate.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Milestone
Filing of recommendations,
terms and conditions, and
prescriptions.
Commission issues Draft EA
Comments on Draft EA Due
Commission Issues Final EA
Target date
May 2015.
December
2015.
January 2016.
May 2016.
o. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06525 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OARM–2015–0210; FRL 9924–95–
OARM]
National and Governmental Advisory
Committees to the U.S. Representative
to the Commission for Environmental
Cooperation
Environmental Protection
Agency (EPA).
ACTION: Notice of Advisory Committee
meeting.
AGENCY:
Under the Federal Advisory
Committee Act, Public Law 92–463, the
Environmental Protection Agency (EPA)
gives notice of a meeting of the National
Advisory Committee (NAC) and
Governmental Advisory Committee
(GAC) to the U.S. Representative to the
North American Commission for
Environmental Cooperation (CEC). The
National and Governmental Advisory
Committees advise the EPA
Administrator in her capacity as the
U.S. Representative to the CEC Council.
The committees are authorized under
Articles 17 and 18 of the North
American Agreement on Environmental
Cooperation (NAAEC), North American
Free Trade Agreement Implementation
Act, Public Law 103–182, and as
directed by Executive Order 12915,
entitled ‘‘Federal Implementation of the
North American Agreement on
Environmental Cooperation.’’ The NAC
is composed of 15 members
SUMMARY:
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15209-15210]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06525]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13703-002]
FFP Missouri 2, LLC; Notice of Application Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License--Existing Dam.
b. Project No.: 13703-002.
c. Date filed: November 13, 2013.
d. Applicant: FFP Missouri 2, LLC.
e. Name of Project: Enid Lake Hydroelectric Project.
f. Location: The proposed project would be located at the U.S. Army
Corps of Engineers' (Corps) existing Enid Lake Dam, on the Yocona
River, near the town of Oakland, in Yalobusha County, Mississippi. The
proposed project would occupy approximately 30 acres of federal land
administered by the Corps.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)--825(r).
h. Applicant Contact: Ramya Swaminathan, Rye Development, 745
Atlantic Avenue, 8th Floor, Boston, MA 02111; telephone (617) 804-1326.
i. FERC Contact: Jeanne Edwards, telephone (202) 502-6181 and email
jeanne.edwards@ferc.gov; or Patti Leppert, telephone (202) 502-6034 and
email patricia.leppert@ferc.gov.
[[Page 15210]]
j. Deadline for filing comments, recommendations, preliminary terms
and conditions, and prescriptions: 60 days from the issuance date of
this notice; reply comments are due 105 days from the issuance date of
this notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13703-002.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The proposed Enid Lake Project would utilize the following
existing Corps' Enid Lake Dam facilities: (1) An 8,400-foot-long, 85-
foot-high earth fill embankment dam; (2) a reservoir; and (3) outlet
works consisting of a concrete intake tower, two gated inlets that
combine to direct flow through two 370-foot-long, 11-foot-diameter
concrete outlet conduits, and a stilling basin.
The proposed Enid Lake Project would consist of the following new
facilities: (1) A 320-foot-long, 10.25-foot-diameter steel liner
installed within one of the two existing outlet conduits; (2) a 50-
foot-long, 20-foot-wide (varies) steel-lined, concrete bifurcation
chamber containing two hydraulically-operated gates used to control the
amount of flow diverted from the existing stilling basin to the
powerhouse; (3) a 240-foot-long, 10-foot-diameter steel penstock; (4) a
55-foot wide, 50-foot-long, 100-foot-high steel and reinforced concrete
forebay housing trashracks and a fish bypass gate; (5) an 80-foot-long,
50-foot-wide concrete powerhouse containing two vertical Kaplan
turbine-generator units having a combined installed capacity of 4.6
megawatts; (6) a 150-foot-long, 75-foot-wide tailrace; (7) a 181-foot-
long, 4.16-kilovolt (kV) buried cable; (8) a substation; and (9) a
2,036-foot-long, 12.5-kV overhead transmission line extending from the
substation to a utility-owned distribution line. The average annual
generation would be 17,700 megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field, to access the document. For assistance, contact
FERC Online Support. A copy is available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
All filings must: (1) Bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
n. Procedural Schedule:
The application will be processed according to the following
revised hydro licensing schedule. Revisions to the schedule may be made
as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, terms and May 2015.
conditions, and prescriptions.
Commission issues Draft EA................ December 2015.
Comments on Draft EA Due.................. January 2016.
Commission Issues Final EA................ May 2016.
------------------------------------------------------------------------
o. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06525 Filed 3-20-15; 8:45 am]