FFP Missouri 2, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 15206-15207 [2015-06523]

Download as PDF 15206 Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices 8G–024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586– 5260. Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to FUA in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U. S. C. 8311. The following owner of a proposed new base load electric powerplant has filed a self-certification of coalcapability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61: Owner: NTE Carolinas, LLC. Capacity: 475 megawatts (MW). Plant Location: Gage Road, Kings Mountain, NC 28086. In-Service Date: As early as January 2018. SUPPLEMENTARY INFORMATION: Issued in Washington, DC on March 17, 2015. Brian Mills, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2015–06552 Filed 3–20–15; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13701–002] mstockstill on DSK4VPTVN1PROD with NOTICES FFP Missouri 2, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License—Existing Dam. b. Project No.: 13701–002. c. Date filed: November 13, 2013. d. Applicant: FFP Missouri 2, LLC. VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 e. Name of Project: Sardis Lake Hydroelectric Project. f. Location: The proposed project would be located at the U.S. Army Corps of Engineers’ (Corps) existing Sardis Lake Dam, on the Little Tallahatchie River, near the Town of Sardis, Panola County, Mississippi. The proposed project would occupy approximately 59 acres of federal land administered by the Corps. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Ramya Swaminathan, Rye Development, 745 Atlantic Avenue, 8th Floor, Boston, MA 02111; telephone (617) 804–1326. i. FERC Contact: Jeanne Edwards, telephone (202) 502–6181 and email jeanne.edwards@ferc.gov; or Patti Leppert, telephone (202) 502–6034 and email patricia.leppert@ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–13701–002. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The proposed Sardis Lake Project would utilize the following existing Corps’ Sardis Lake Dam facilities: (1) A 15,300-foot-long, 97-foot-high earth fill PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 embankment dam; (2) a reservoir; and (3) outlet works consisting of a concrete intake tower, four gated inlets that combine to direct flow through a 560foot-long, 16.0-foot by 18.25-foot ovoid concrete outlet conduit, and a stilling basin. The proposed Sardis Lake Project would consist of the following new facilities: (1) A 510-foot-long, 15.5-footdiameter steel liner installed within the existing outlet conduit; (2) a 50-footlong, 30-foot-wide (varies) steel-lined, concrete bifurcation chamber containing two hydraulically-operated gates used to control the amount of flow diverted from the existing stilling basin to the powerhouse; (3) a 250-foot-long, 15.5foot-diameter steel penstock; (4) a 78foot-wide, 50-foot-long, 102.6-foot-high steel and reinforced concrete forebay housing trashracks and a fish bypass gate; (5) a 120-foot-long, 85-foot-wide concrete powerhouse containing two vertical Kaplan turbine-generator units having a combined installed capacity of 14.6 megawatts; (6) a 200-foot-long, 100foot-wide tailrace; (7) an 887-foot-long, 4.16-kilovolt (kV) buried cable; (8) a substation; and (9) a 6,210-foot-long, 161-kV overhead transmission line extending from the substation to a utility-owned distribution line. The average annual generation would be 52,000 megawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support. A copy is available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. All filings must: (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions E:\FR\FM\23MRN1.SGM 23MRN1 Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. n. Procedural Schedule: The application will be processed according to the following revised hydro licensing schedule. Revisions to the schedule may be made as appropriate. Milestone Filing of recommendations, terms and conditions, and prescriptions. Commission issues Draft EA Comments on Draft EA Due Commission Issues Final EA Target date May 2015. December 2015. January 2016. May 2016. o. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. Dated: March 16, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–06523 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–929–002. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment per 35.17(b): Motion for Deferral in OMPA Revised Stated Rate—ER15–929 to be effective 12/31/9998. Filed Date: 3/13/15. Accession Number: 20150313–5176. Comments Due: 5 p.m. ET 4/3/15. Docket Numbers: ER15–1282–000. Applicants: NorthWestern Corporation. VerDate Sep<11>2014 16:51 Mar 20, 2015 Jkt 235001 Description: § 205(d) rate filing per 35.13(a)(2)(iii): SA 28–SD First Revised—LGIA with Beethoven Wind LLC to be effective 3/17/2015. Filed Date: 3/16/15. Accession Number: 20150316–5077. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1283–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): SWEPCO-Hope PSA Amendment to be effective 1/1/2015. Filed Date: 3/16/15. Accession Number: 20150316–5143. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1287–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): First Revised Service Agreement No. 3669; Queue Nos. Y3– 046, Y3–051, Z1–058 . . . to be effective 2/13/2015. Filed Date: 3/16/15. Accession Number: 20150316–5159. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1289–000. Applicants: Midcontinent Independent System Operator, Inc., Great River Energy. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–03–16_GRE RTO Adder Filing to be effective 1/6/2015. Filed Date: 3/16/15. Accession Number: 20150316–5163. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1290–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): First Revised Service Agreement No. 2775; Queue Nos. Y3– 045, Y3–052, Y3–107 to be effective 2/13/2015. Filed Date: 3/16/15. Accession Number: 20150316–5168. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1291–000. Applicants: Public Service Company of Colorado. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2015–3–16_PSC–PLND– A&R ISA 110–0.0.0-Agrmt to be effective 3/17/2015. Filed Date: 3/16/15. Accession Number: 20150316–5173. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1292–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): First Revised Service Agreement No. 2181; Queue No. V4–045 to be effective 2/12/2015. Filed Date: 3/16/15. Accession Number: 20150316–5176. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 15207 Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1293–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Revisions to Attachment AE Sections 4.5.2 and 4.5.3 to be effective 5/15/2015. Filed Date: 3/16/15. Accession Number: 20150316–5187. Comments Due: 5 p.m. ET 4/6/15. Docket Numbers: ER15–1294–000. Applicants: Pacific Gas and Electric Company. Description: Pacific Gas and Electric Company submits Notice of Termination of Agreement with the City of Los Angeles Department of Water and Power, Rate Schedule No. 131. Filed Date: 3/16/15. Accession Number: 20150316–5188. Comments Due: 5 p.m. ET 4/6/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 16, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–06554 Filed 3–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI15–02–000] Southern Energy, Inc.; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15206-15207]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06523]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13701-002]


FFP Missouri 2, LLC; Notice of Application Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License--Existing Dam.
    b. Project No.: 13701-002.
    c. Date filed: November 13, 2013.
    d. Applicant: FFP Missouri 2, LLC.
    e. Name of Project: Sardis Lake Hydroelectric Project.
    f. Location: The proposed project would be located at the U.S. Army 
Corps of Engineers' (Corps) existing Sardis Lake Dam, on the Little 
Tallahatchie River, near the Town of Sardis, Panola County, 
Mississippi. The proposed project would occupy approximately 59 acres 
of federal land administered by the Corps.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Ramya Swaminathan, Rye Development, 745 
Atlantic Avenue, 8th Floor, Boston, MA 02111; telephone (617) 804-1326.
    i. FERC Contact: Jeanne Edwards, telephone (202) 502-6181 and email 
jeanne.edwards@ferc.gov; or Patti Leppert, telephone (202) 502-6034 and 
email patricia.leppert@ferc.gov.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13701-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The proposed Sardis Lake Project would utilize the following 
existing Corps' Sardis Lake Dam facilities: (1) A 15,300-foot-long, 97-
foot-high earth fill embankment dam; (2) a reservoir; and (3) outlet 
works consisting of a concrete intake tower, four gated inlets that 
combine to direct flow through a 560-foot-long, 16.0-foot by 18.25-foot 
ovoid concrete outlet conduit, and a stilling basin.
    The proposed Sardis Lake Project would consist of the following new 
facilities: (1) A 510-foot-long, 15.5-foot-diameter steel liner 
installed within the existing outlet conduit; (2) a 50-foot-long, 30-
foot-wide (varies) steel-lined, concrete bifurcation chamber containing 
two hydraulically-operated gates used to control the amount of flow 
diverted from the existing stilling basin to the powerhouse; (3) a 250-
foot-long, 15.5-foot-diameter steel penstock; (4) a 78-foot-wide, 50-
foot-long, 102.6-foot-high steel and reinforced concrete forebay 
housing trashracks and a fish bypass gate; (5) a 120-foot-long, 85-
foot-wide concrete powerhouse containing two vertical Kaplan turbine-
generator units having a combined installed capacity of 14.6 megawatts; 
(6) a 200-foot-long, 100-foot-wide tailrace; (7) an 887-foot-long, 
4.16-kilovolt (kV) buried cable; (8) a substation; and (9) a 6,210-
foot-long, 161-kV overhead transmission line extending from the 
substation to a utility-owned distribution line. The average annual 
generation would be 52,000 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field, to access the document. For assistance, contact 
FERC Online Support. A copy is available for inspection and 
reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    All filings must: (1) Bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions

[[Page 15207]]

or prescriptions must set forth their evidentiary basis and otherwise 
comply with the requirements of 18 CFR 4.34(b). Agencies may obtain 
copies of the application directly from the applicant. Each filing must 
be accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.
    n. Procedural Schedule:
    The application will be processed according to the following 
revised hydro licensing schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations, terms and        May 2015.
 conditions, and prescriptions.
Commission issues Draft EA................  December 2015.
Comments on Draft EA Due..................  January 2016.
Commission Issues Final EA................  May 2016.
------------------------------------------------------------------------

    o. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.

    Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06523 Filed 3-20-15; 8:45 am]
 BILLING CODE 6717-01-P