seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to FUA
in order to meet the requirement of coal
capability, the owner or operator of such
a facility proposing to use natural gas or
petroleum as its primary energy source
shall certify to the Secretary of Energy
(Secretary) prior to construction, or
prior to operation as a base load electric
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. Such certification
establishes compliance with FUA
section 201(a) as of the date it is filed
with the Secretary. 42 U. S. C. 8311.
The following owner of a proposed
new base load electric powerplant has
filed a self-certification of coalcapability with DOE pursuant to FUA
section 201(d) and in accordance with
DOE regulations in 10 CFR 501.60, 61:
Owner: NTE Carolinas, LLC.
Capacity: 475 megawatts (MW).
Plant Location: Gage Road, Kings
Mountain, NC 28086.
In-Service Date: As early as January
2018.
SUPPLEMENTARY INFORMATION:
Issued in Washington, DC on March 17,
2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–06552 Filed 3–20–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13701–002]
mstockstill on DSK4VPTVN1PROD with NOTICES
FFP Missouri 2, LLC; Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License—Existing Dam.
b. Project No.: 13701–002.
c. Date filed: November 13, 2013.
d. Applicant: FFP Missouri 2, LLC.
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
e. Name of Project: Sardis Lake
Hydroelectric Project.
f. Location: The proposed project
would be located at the U.S. Army
Corps of Engineers’ (Corps) existing
Sardis Lake Dam, on the Little
Tallahatchie River, near the Town of
Sardis, Panola County, Mississippi. The
proposed project would occupy
approximately 59 acres of federal land
administered by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Ramya
Swaminathan, Rye Development, 745
Atlantic Avenue, 8th Floor, Boston, MA
02111; telephone (617) 804–1326.
i. FERC Contact: Jeanne Edwards,
telephone (202) 502–6181 and email
jeanne.edwards@ferc.gov; or Patti
Leppert, telephone (202) 502–6034 and
email patricia.leppert@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13701–002.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The proposed Sardis Lake Project
would utilize the following existing
Corps’ Sardis Lake Dam facilities: (1) A
15,300-foot-long, 97-foot-high earth fill
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
embankment dam; (2) a reservoir; and
(3) outlet works consisting of a concrete
intake tower, four gated inlets that
combine to direct flow through a 560foot-long, 16.0-foot by 18.25-foot ovoid
concrete outlet conduit, and a stilling
basin.
The proposed Sardis Lake Project
would consist of the following new
facilities: (1) A 510-foot-long, 15.5-footdiameter steel liner installed within the
existing outlet conduit; (2) a 50-footlong, 30-foot-wide (varies) steel-lined,
concrete bifurcation chamber containing
two hydraulically-operated gates used to
control the amount of flow diverted
from the existing stilling basin to the
powerhouse; (3) a 250-foot-long, 15.5foot-diameter steel penstock; (4) a 78foot-wide, 50-foot-long, 102.6-foot-high
steel and reinforced concrete forebay
housing trashracks and a fish bypass
gate; (5) a 120-foot-long, 85-foot-wide
concrete powerhouse containing two
vertical Kaplan turbine-generator units
having a combined installed capacity of
14.6 megawatts; (6) a 200-foot-long, 100foot-wide tailrace; (7) an 887-foot-long,
4.16-kilovolt (kV) buried cable; (8) a
substation; and (9) a 6,210-foot-long,
161-kV overhead transmission line
extending from the substation to a
utility-owned distribution line. The
average annual generation would be
52,000 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
All filings must: (1) Bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
E:\FR\FM\23MRN1.SGM
23MRN1
Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
n. Procedural Schedule:
The application will be processed
according to the following revised hydro
licensing schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Filing of recommendations,
terms and conditions, and
prescriptions.
Commission issues Draft EA
Comments on Draft EA Due
Commission Issues Final EA
Target date
May 2015.
December
2015.
January 2016.
May 2016.
o. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06523 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–929–002.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment per
35.17(b): Motion for Deferral in OMPA
Revised Stated Rate—ER15–929 to be
effective 12/31/9998.
Filed Date: 3/13/15.
Accession Number: 20150313–5176.
Comments Due: 5 p.m. ET 4/3/15.
Docket Numbers: ER15–1282–000.
Applicants: NorthWestern
Corporation.
VerDate Sep<11>2014
16:51 Mar 20, 2015
Jkt 235001
Description: § 205(d) rate filing per
35.13(a)(2)(iii): SA 28–SD First
Revised—LGIA with Beethoven Wind
LLC to be effective 3/17/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5077.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1283–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): SWEPCO-Hope PSA
Amendment to be effective 1/1/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5143.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1287–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): First Revised Service
Agreement No. 3669; Queue Nos. Y3–
046, Y3–051, Z1–058 . . . to be effective
2/13/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5159.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1289–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Great River Energy.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–03–16_GRE RTO
Adder Filing to be effective 1/6/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5163.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1290–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): First Revised Service
Agreement No. 2775; Queue Nos. Y3–
045, Y3–052, Y3–107 to be effective
2/13/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5168.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1291–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–3–16_PSC–PLND–
A&R ISA 110–0.0.0-Agrmt to be effective
3/17/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5173.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1292–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): First Revised Service
Agreement No. 2181; Queue No. V4–045
to be effective 2/12/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5176.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
15207
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1293–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Revisions to Attachment
AE Sections 4.5.2 and 4.5.3 to be
effective 5/15/2015.
Filed Date: 3/16/15.
Accession Number: 20150316–5187.
Comments Due: 5 p.m. ET 4/6/15.
Docket Numbers: ER15–1294–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits Notice of
Termination of Agreement with the City
of Los Angeles Department of Water and
Power, Rate Schedule No. 131.
Filed Date: 3/16/15.
Accession Number: 20150316–5188.
Comments Due: 5 p.m. ET 4/6/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–06554 Filed 3–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI15–02–000]
Southern Energy, Inc.; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and Motions To
Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15206-15207]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06523]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13701-002]
FFP Missouri 2, LLC; Notice of Application Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License--Existing Dam.
b. Project No.: 13701-002.
c. Date filed: November 13, 2013.
d. Applicant: FFP Missouri 2, LLC.
e. Name of Project: Sardis Lake Hydroelectric Project.
f. Location: The proposed project would be located at the U.S. Army
Corps of Engineers' (Corps) existing Sardis Lake Dam, on the Little
Tallahatchie River, near the Town of Sardis, Panola County,
Mississippi. The proposed project would occupy approximately 59 acres
of federal land administered by the Corps.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Ramya Swaminathan, Rye Development, 745
Atlantic Avenue, 8th Floor, Boston, MA 02111; telephone (617) 804-1326.
i. FERC Contact: Jeanne Edwards, telephone (202) 502-6181 and email
jeanne.edwards@ferc.gov; or Patti Leppert, telephone (202) 502-6034 and
email patricia.leppert@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13701-002.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The proposed Sardis Lake Project would utilize the following
existing Corps' Sardis Lake Dam facilities: (1) A 15,300-foot-long, 97-
foot-high earth fill embankment dam; (2) a reservoir; and (3) outlet
works consisting of a concrete intake tower, four gated inlets that
combine to direct flow through a 560-foot-long, 16.0-foot by 18.25-foot
ovoid concrete outlet conduit, and a stilling basin.
The proposed Sardis Lake Project would consist of the following new
facilities: (1) A 510-foot-long, 15.5-foot-diameter steel liner
installed within the existing outlet conduit; (2) a 50-foot-long, 30-
foot-wide (varies) steel-lined, concrete bifurcation chamber containing
two hydraulically-operated gates used to control the amount of flow
diverted from the existing stilling basin to the powerhouse; (3) a 250-
foot-long, 15.5-foot-diameter steel penstock; (4) a 78-foot-wide, 50-
foot-long, 102.6-foot-high steel and reinforced concrete forebay
housing trashracks and a fish bypass gate; (5) a 120-foot-long, 85-
foot-wide concrete powerhouse containing two vertical Kaplan turbine-
generator units having a combined installed capacity of 14.6 megawatts;
(6) a 200-foot-long, 100-foot-wide tailrace; (7) an 887-foot-long,
4.16-kilovolt (kV) buried cable; (8) a substation; and (9) a 6,210-
foot-long, 161-kV overhead transmission line extending from the
substation to a utility-owned distribution line. The average annual
generation would be 52,000 megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field, to access the document. For assistance, contact
FERC Online Support. A copy is available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
All filings must: (1) Bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions
[[Page 15207]]
or prescriptions must set forth their evidentiary basis and otherwise
comply with the requirements of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from the applicant. Each filing must
be accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
n. Procedural Schedule:
The application will be processed according to the following
revised hydro licensing schedule. Revisions to the schedule may be made
as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, terms and May 2015.
conditions, and prescriptions.
Commission issues Draft EA................ December 2015.
Comments on Draft EA Due.................. January 2016.
Commission Issues Final EA................ May 2016.
------------------------------------------------------------------------
o. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06523 Filed 3-20-15; 8:45 am]
BILLING CODE 6717-01-P