Tannery Island Power Corporation; Ampersand Tannery Island Hydro, LLC; Notice of Transfer of Exemption, 14127 [2015-06079]
Download as PDF
Federal Register / Vol. 80, No. 52 / Wednesday, March 18, 2015 / Notices
14127
Dated: March 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: March 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
(866) 208–3372 (voice), (202) 208–8659
(TTY), or send a FAX to 202–208–2106
with the required accommodations.
[FR Doc. 2015–06131 Filed 3–17–15; 8:45 am]
[FR Doc. 2015–06135 Filed 3–17–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Dated: March 12, 2015.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
[Docket No. AD15–2–000]
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Review of Cost Submittals by Other
Federal Agencies for Administering
Part I of the Federal Power Act; Notice
of Technical Conference
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP15–627–000.
Applicants: KO Transmission
Company.
Description: Compliance filing per
154.203: Order No. 801, Natural Gas
Pipeline Maps to be effective 4/1/2015.
Filed Date: 3/10/15.
Accession Number: 20150310–5103.
Comments Due: 5 p.m. ET 3/23/15.
Docket Numbers: RP15–628–000.
Applicants: Equitrans, L.P.
Description: § 4(d) rate filing per
154.204: Negotiated Capacity Release
Agreements—03–2015 to be effective
12/1/2013.
Filed Date: 3/10/15.
Accession Number: 20150310–5172.
Comments Due: 5 p.m. ET 3/23/15.
Docket Numbers: RP15–629–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) rate filing per
154.204: Negotiated Rate PAL
Agreement—Koch Energy Services to be
effective 3/10/2015.
Filed Date: 3/10/15.
Accession Number: 20150310–5196.
Comments Due: 5 p.m. ET 3/23/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
20:26 Mar 17, 2015
Jkt 235001
[FR Doc. 2015–06203 Filed 3–17–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
In an order issued on October 8, 2004,
the Commission set forth a guideline for
Other Federal Agencies (OFAs) to
submit their costs related to
Administering Part I of the Federal
Power Act. Order On Rehearing
Consolidating Administrative Annual
Charges Bill Appeals And Modifying
Annual Charges Billing Procedures, 109
FERC ¶ 61,040 (2004) (October 8 Order).
The Commission required OFAs to
submit their costs using the OFA Cost
Submission Form. The October 8 Order
also announced that a technical
conference would be held for the
purpose of reviewing the submitted cost
forms and detailed supporting
documentation.
The Commission will hold a technical
conference for reviewing the submitted
OFA costs. The purpose of the
conference will be for OFAs and
licensees to discuss costs reported in the
forms and any other supporting
documentation or analyses.
The technical conference will be held
on March 26, 2015, in Conference Room
3M–2B at the Commission’s
headquarters, 888 First Street NE.,
Washington, DC. The technical
conference will begin at 2:00 p.m. (EST).
The technical conference will also be
transcribed. Those interested in
obtaining a copy of the transcript
immediately for a fee should contact the
Ace-Federal Reporters, Inc., at 202–347–
3700, or 1–800–336–6646. Two weeks
after the post-forum meeting, the
transcript will be available for free on
the Commission’s e-library system.
Anyone without access to the
Commission’s Web site or who has
questions about the technical
conference should contact Norman
Richardson at (202) 502–6219 or via
email at annualcharges@ferc.gov.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 4908–015]
Tannery Island Power Corporation;
Ampersand Tannery Island Hydro,
LLC; Notice of Transfer of Exemption
1. By letter filed September 29, 2014,
Ampersand Tannery Island Hydro, LLC
informed the Commission that the
exemption from licensing for the
Tannery Island Project, FERC No. 4908,
originally issued July 11, 1983,1 has
been transferred from Tannery Island
Power Corporation to Ampersand
Tannery Island Hydro, LLC. The project
is located on the Black River in Jefferson
County, New York. The transfer of an
exemption does not require Commission
approval.
2. Ampersand Tannery Island Hydro,
LLC is now the exemptee for the
Tannery Island Project, FERC No. 4908.
All correspondence should be
forwarded to: Mr. Jingdong Huang,
Asset Manager, Ampersand Tannery
Island Hydro, LLC, 717 Atlantic
Avenue, Suite 1A, Boston, MA 02111.
Dated: March 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–06079 Filed 3–17–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–88–000.
Applicants: BluCo Energy LLC,
Vantage Commodities Financial
Services II, LLC.
Description: Application Under
Section 203 of Bluco Energy, LLC.
Filed Date: 3/6/15.
1 24 FERC ¶ 61,021, Order Modifying Order
Vacating Grant of Exemptions from Licensing
(1983).
E:\FR\FM\18MRN1.SGM
18MRN1
Agencies
[Federal Register Volume 80, Number 52 (Wednesday, March 18, 2015)]
[Notices]
[Page 14127]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06079]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4908-015]
Tannery Island Power Corporation; Ampersand Tannery Island Hydro,
LLC; Notice of Transfer of Exemption
1. By letter filed September 29, 2014, Ampersand Tannery Island
Hydro, LLC informed the Commission that the exemption from licensing
for the Tannery Island Project, FERC No. 4908, originally issued July
11, 1983,\1\ has been transferred from Tannery Island Power Corporation
to Ampersand Tannery Island Hydro, LLC. The project is located on the
Black River in Jefferson County, New York. The transfer of an exemption
does not require Commission approval.
---------------------------------------------------------------------------
\1\ 24 FERC ] 61,021, Order Modifying Order Vacating Grant of
Exemptions from Licensing (1983).
---------------------------------------------------------------------------
2. Ampersand Tannery Island Hydro, LLC is now the exemptee for the
Tannery Island Project, FERC No. 4908. All correspondence should be
forwarded to: Mr. Jingdong Huang, Asset Manager, Ampersand Tannery
Island Hydro, LLC, 717 Atlantic Avenue, Suite 1A, Boston, MA 02111.
Dated: March 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06079 Filed 3-17-15; 8:45 am]
BILLING CODE 6717-01-P